Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 09:50

Blackheath Park, Dublin

53.36608, -6.19956

Homes here mostly date from 1919–1945. 3 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed. 3 planning files on this house, the latest from 2025.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945. 3 planning files on this house.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Blackheath ParkBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2025: WEB1615/25 · work already done, approved2024: WEB1856/24 · alterations, approved2022: 3728/21 · the development will, approved2021: 9 files on Blackheath Park2022: 3 files on Blackheath Park2023: 2 files on Blackheath Park2024: 3 files on Blackheath Park2025: 2 files on Blackheath Park2026: 1 file on Blackheath Park20 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    WEB1615/25 · work already done · approved 2025 · work already done
    approvedstartedsigned off?
  2. 2024
    WEB1856/24 · alterations · approved 2024 · not started, runs out 2029
    approvedstartedsigned off
  3. 2022
    3728/21 · the development will · approved 2022 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings21post box; house
Radon grid squares1
Monuments3Church; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 76% approved, and 1 in 2 is asked for more information.

Single-storey rear93 decided · more info asked 16%
100% · council 97%
Two-storey rear54 decided · more info asked 26%
100% · council 96%
Two-storey side12 decided · more info asked 0%
100% · council 98%
Single-storey side12 decided · more info asked 17%
100% · council 99%
Attic or dormer290 decided · more info asked 12%
97% · council 96%
First-floor35 decided · more info asked 14%
91% · council 94%
Garage conversion46 decided · more info asked 22%
100% · council 99%
Porch or front15 decided · more info asked 0%
93% · council 97%
New house in a garden or site37 decided · more info asked 43%
76% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 594 nearby, 5,771 council-wide

Figure 3

Blackheath Park, file by file since 2021

15 of 15 decided extensions on the road were approved.

20 planning files on Blackheath Park since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 80 · 2021 · garage conversion · approved · 2291/21No. 65 · 2021 · attic conversion / dormer · approved · 2947/21No. 91 · 2021 · two-storey side · approved · 3636/21No. 10 · 2021 · single-storey rear · approved · WEB1088/21No. 81 · 2021 · single-storey rear · approved · WEB1094/21No. 27 · 2021 · two-storey rear · approved · WEB1307/21No. 84 · 2021 · attic conversion / dormer · approved · WEB5029/21No. 25 · 2022 · attic conversion / dormer · approved · 4506/22No. 81 · 2022 · single-storey rear · approved · WEB1776/22No. 97 · 2022 · attic conversion / dormer · approved · WEB2077/22No. 64 · 2023 · attic conversion / dormer · approved · 4523/23No. 21 · 2024 · attic conversion / dormer · approved · 3577/24No. 62 · 2024 · two-storey rear · approved · 4051/24No. 52 · 2025 · attic conversion / dormer · approved · WEB1310/25No. 55 · 2026 · garage conversion · approved · WEB2938/26Porches, roofs, otherNo. 81 · 2021 · other work · approved · 2928/21No. 57 · 2021 · other work · approved · 3728/21No. 91 · 2023 · other work · approved · WEB1195/23No. 57 · 2024 · other work · approved · WEB1856/24No. 57 · 2025 · other work · approved · WEB1615/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

20 files with "Blackheath Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

2 approved3 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic31—
Garage conversion11—
Single-storey rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 68 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 127 days; Appeal window: 4 weeks; If appealed: +138 days; Building starts: 156 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=516)55 daysIf more info asked (1 in 7)With further information: median 127 days (n=87)127 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 138 days (n=95, all appeals within 1.5 km)+138 daysBuilding startsStart notice: median 156 days after permission (n=320)156 days after permissionSigned off433 days after the start, for the few who file. 58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated604 decided home extensions, 330 start notices, 95 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    8 of 26 appealed refusals became permissions. 5 of 71 appealed approvals were reversed.

    Refusals appealed26 decided
    8 became permissions
    Approvals appealed71 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 502193 Pending · No. 34 Vernon Park, Clontarf, Dublin 3 D03 XW63 · 487 m
    • 501035 Granted with conditions · 23 Mount Prospect Avenue, Clontarf, Dublin 3 · 449 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Blackheath Park, Dublin with 15 numbered planning items
    ⌖ the houseDerelict buildingBuilding startedApprovedNo decision yet
    1. 117 Kincora Road Dublin 3 D03AK59 DS2043Derelict building · 360 m
    2. 255 Blackheath Park, dublin CN0142350DCBuilding started · 4 m
    3. 314 Blackheath Court, Dublin WEB1477/25Building started · 197 m
    4. 455, Blackheath Park WEB2938/26Approved · 28 m
    5. 56 Castilla Park, Dublin 3 5128/26Approved · 206 m
    6. 618, Vernon Park WEB3268/26No decision yet · 234 m
    7. 77, Blackheath Gardens WEB2147/26Approved · 256 m
    8. 835, Hampton Court WEB2099/26Approved · 259 m
    9. 9112, Castle Avenue WEB2652/26No decision yet · 271 m
    10. 10104, Castle Avenue WEB1423/26Approved · 280 m
    11. 1150 Hampton Court, Clontarf 5081/26Approved · 319 m
    12. 12148 Castle Avenue, Clontarf WEB1874/26Approved · 409 m
    13. 1346, Kincora Grove WEB2761/26No decision yet · 445 m
    14. 1414A, Mount Prospect Avenue WEB5740/25Approved · 471 m
    15. 15Clontarf Cricket Club, Castle Avenue WEB2331/26No decision yet · 473 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 156 permissions since 2016, 82 show a start notice and 5 have a completion certificate. Most owners opt out of sign-off.

    184 applications lodged within 500 m. Council: 158 approved, 6 refused. After appeals: 156 approved. Of those: 5 signed off, 43 built with the owner's opt-out, 34 started, 74 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT158: lodged → approved6: lodged → refused15: lodged → withdrawn or invalid5: lodged → undecided155: approved → approved5: refused → refused15: withdrawn or invalid → withdrawn5: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal74: approved → no start notice found43: approved → built, owner opted out34: approved → started, not signed off5: approved → signed off184 lodged184 lodged158 approved158 approved6 refused6 refused15 withdrawn or invalid15 withdrawn or invalid5 undecided5 undecided156 approved156 approved6 refused6 refused16 withdrawn16 withdrawn6 undecided6 undecided74 no start notice found74 no start notice found43 built, owner opted out43 built, owner opted out34 started, not signed off34 started, not signed off5 signed off5 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured184 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Derelict building 1

      • 117 Kincora Road Dublin 3 D03AK59 · derelict since Aug 2025 · 360 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 22 and 36 a year; busiest 2022. 96% of decisions were approvals.

      2021: 42, 2022: 36, 2023: 32, 2024: 36, 2025: 22, 2026: 16010203040502021: 39 approved2021: 2 refused2021: 1 withdrawn or invalid42’21*2022: 31 approved2022: 3 refused2022: 2 withdrawn or invalid36’222023: 30 approved2023: 1 refused2023: 1 withdrawn or invalid32’232024: 35 approved2024: 1 withdrawn or invalid36’242025: 16 approved2025: 6 withdrawn or invalid22’252026: 7 approved2026: 4 withdrawn or invalid2026: 5 undecided16’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 18 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 14 in the last 12 months
      14 no sign-off needed
      • 14A Mount Prospect Avenue, Dublin 3, D03 EK58 · 28 Oct 2026 · start notice, opted out no sign-off needed · WEB5740/25 · 488 m
      • 35 Hampton Court, Dublin 3, Dublin, D03 W544 · 1 Oct 2026 · start notice, opted out no sign-off needed · WEB2099/26 · 278 m
      • 205 Vernon Avenue, Dublin 3, D03 AE92 · 6 Aug 2026 · short notice no sign-off needed · 4320/23 · 442 m
      • 3 Kincora Park, Dublin 3, D03 PK80 · 24 Jun 2026 · start notice, opted out no sign-off needed · WEB5514/25 · 484 m
      • 33 Kincora Road, Clontarf, Dublin 3, D03 TC58 · 24 Jun 2026 · start notice, opted out no sign-off needed · WEB1444/26 · 371 m
      • 104 Castle Avenue, Dublin 3, D03 FD77 · 22 Jun 2026 · start notice, opted out no sign-off needed · WEB1423/26 · 298 m
      • 255 Blackheath Park, dublin, Dublin 3, D03 AY66 · 21 May 2026 · short notice no sign-off needed · 4 m
      • 11 Mount Prospect Avenue, DUBLIN 3, D03 HE65 · 20 May 2026 · start notice, opted out no sign-off needed · WEB1773/23 · 402 m
      • 100 Castle Avenue, Clontarf, Dublin 3, D03 Y400 · 18 May 2026 · start notice, opted out no sign-off needed · WEB2271/25 · 295 m
      • 314 Blackheath Court, Dublin, Dublin 3, D03 YA03 · 7 May 2026 · short notice no sign-off needed · WEB1477/25 · 197 m
      • 15 Kincora Road, CLONTARF, Dublin 3, D03 YE37 · 11 Mar 2026 · start notice, opted out no sign-off needed · WEB5473/25 · 360 m
      • 100 Castle Avenue, Clontarf, Dublin 3, D03 Y400 · 2 Mar 2026 · start notice, opted out no sign-off needed · WEB2271/25 · 295 m
      • 63 Grosvenor Court, Dublin, Dublin 3, D03 RK15 · 5 Dec 2025 · short notice no sign-off needed · WEB1849/25 · 320 m
      • 107 Vernon Avenue, Clontarf,, Dublin 3, D03 CV04 · 24 Nov 2025 · start notice, opted out no sign-off needed · WEB2688/25 · 331 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      63-67A Collins Avenue East6767 built (2025-Q1)984 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Little Squirrels Montessori · Crèche10 Sept 2025 · report · Tusla Early Years Inspectorate187 m
      Buzzy Bees Montessori School · Crèche19 Jun 2026 · report · Tusla Early Years Inspectorate187 m
      Seafield Montessori · Crèche3 Dec 2024 · report · Tusla Early Years Inspectorate309 m
      Little Stars Montessori · Crèche3 Oct 2024 · report · Tusla Early Years Inspectorate463 m
      Casa dei Bambini Montessori · Crèche18 Sept 2025 · report · Tusla Early Years Inspectorate707 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Quieter than most of Dublin City Council.
      Homes approved
      Here0
      Council middle62
      Homes started
      Here26
      Council middle132
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      99% of homes built before 1971 (council 52%). 95% owner-occupied (council 47%).

      Homes built before 1971
      99% · council 52%
      Homes built since 2001
      1% · council 19%
      Owner-occupied
      95% · council 47%
      Rented
      5% · council 45%
      Children under 15
      21% · council 15%
      Aged 65 and over
      22% · council 13%
      Households with 2+ cars
      49% · council 19%
      Work mainly from home
      27% · council 12%
      This small area (259 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268043007

      Bus
      144 m
      Blackheath Ct · 104, 130 · busiest stop within 500 m: 6 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      268 m
      Eoin Baisde B Sois, 294 pupils
      Homes sold nearby
      56
      in 3 years, 1 new (Property Price Register)
      Schools, stops and the council

      Schools

      • Eoin Baisde B Sois · primary · 294 pupils · 268 m
      • S N Eoin Baisde Girls Senior · primary · 380 pupils · 270 m
      • Eoin Baisde C Naoidh · primary · 215 pupils · 274 m
      • Sn Eoin Baisde Boys Senior School · primary · 317 pupils · 305 m
      • Central Remedial Clinic · primary · 78 pupils · 345 m
      • Holy Faith Secondary School · postprimary · 647 pupils · 671 m
      • S N na Lanai Glasa · primary · 285 pupils · 677 m
      • Killester Raheny Clontarf Educate Together National School · primary · 176 pupils · 806 m

      Stops 48

      • Blackheath Ct · 104, 130 · 6/hour at peak · 144 m
      • Blackheath Pk · 104, 130 · 5/hour at peak · 189 m
      • Blackheath Ct · 104, 130 · 5/hour at peak · 266 m
      • Blackheath Pk · 104, 130 · 6/hour at peak · 268 m
      • Seafield Rd W · 130 · 4/hour at peak · 332 m
      • Seafield Rd W · 130 · 5/hour at peak · 344 m
      • Clontarf Cmtry · 104 · 1/hour at peak · 368 m
      • Vernon Avenue · 104 · 1/hour at peak · 375 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Eoin Baisde B Sois · 268 m-5.2% pupils (294) · an extension 2023, approved
      • S N Eoin Baisde Girls Senior · 270 m-6.9% pupils (380)
      • Eoin Baisde C Naoidh · 274 m+5.9% pupils (215)
      • Sn Eoin Baisde Boys Senior School · 305 m-0.3% pupils (317) · an extension 2023, approved
      • Central Remedial Clinic · 345 m-6% pupils (78)
      • Holy Faith Secondary School · 671 m-2.7% pupils (647)

      Open consultations

      Council meetings 30 items

      Public land

      • Health Service Executive · 2.06 ha · 222 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Work already done (WEB1615/25): work kept with permission. Done as approved?
        Ask for: The retention grant and an opinion of compliance.
        Seller · solicitor
      2. Alterations (WEB1856/24) approved 2024, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      3. The development will (3728/21) built without official sign-off: built properly?
        Ask for: An engineer's opinion of compliance.
        Seller · solicitor
      4. Building work started 4 m away: for how long?
        Ask for: The agent's answer.
        Agent · council
      5. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Clontarf East C
      Electoral area
      Clontarf
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • 3 applications on this site; latest WEB1615/25, approved 2025, work already done.
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 1 site nearby could change: 1 derelict.
      • Blackheath Ct (bus 104, 130) 144 m away: 6 an hour at morning peak; 44 from all stops within 500 m.
      • Here (2022 census): 95% owner-occupied (council 47%); 3% of homes empty (council 8%); most built 1919–1945; 36% drive to work (council 28%).
      • 5 home extensions within 250 m since 2026. Most were dormers or attic conversions.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • 18 applications nearby in the last 12 months; 100% approved (council 90%).
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • Permission for work already done (Retention permission): An application to keep something that was built without permission.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 29
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 09:50 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.