Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 11:51

Saint Aidan's Park Road

53.36613, -6.23245

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1919–1945 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z2 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Heritage inventory1 within 100 m post box
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Everlac Paints Ltd (410 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1Everlac Paints Ltd
Heritage inventory buildings60Marino Health Centre; milestone/milepost
Radon grid squares1
Monuments2Burial; R149637
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, OPW flood maps (CFRAM), OPW flood maps (NIFM), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 76% approved, and 1 in 2 are asked for more information.

Single-storey rear86 decided · more info asked 21%
99% · council 97%
Two-storey rear65 decided · more info asked 20%
98% · council 96%
Two-storey side13 decided · more info asked 31%
100% · council 98%
Single-storey side11 decided · more info asked 27%
100% · council 99%
Attic or dormer174 decided · more info asked 11%
98% · council 96%
First-floor37 decided · more info asked 19%
92% · council 94%
Garage conversion18 decided · more info asked 17%
100% · council 99%
Porch or front10 decided · more info asked 0%
100% · council 97%
New house in a garden or site45 decided · more info asked 51%
76% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 459 nearby, 5,771 council-wide

Extensions and refusals right beside you 9 within 250 m · 0 refused within 100 m

Extensions and refusals near you 9 extensions within 250 m · the last 12 months

3 approved6 no decision or withdrawn
KindAppliedApprovedRefused
First-floor41—
Single-storey rear21—
Dormer or attic11—
Two-storey rear10—
Two-storey side10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 75 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 132 days; Appeal window: 4 weeks; If appealed: +206 days; Building starts: 138 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=383)55 daysIf more info asked (1 in 6)With further information: median 132 days (n=81)132 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 206 days (n=102, all appeals within 1.5 km)+206 daysBuilding startsStart notice: median 138 days after permission (n=226)138 days after permissionSigned off519 days after the start, for the few who file. 60% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated464 decided home extensions, 235 start notices, 102 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    10 of 32 appealed refusals became permissions. 10 of 70 appealed approvals were reversed.

    Refusals appealed32 decided
    10 became permissions
    Approvals appealed70 decided
    10 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Saint Aidan's Park Road with 15 numbered planning items
    ⌖ the houseDerelict buildingEmpty land zoned for homesApprovedNo decision yet
    1. 1Derelict site DS2344 DS2344Derelict building · 326 m
    2. 20.1 ha zoned for homesEmpty land zoned for homes · 320 m
    3. 316, Saint Aidan's Park WEB1711/26Approved · 69 m
    4. 42, Haverty Road WEB1513/26Approved · 167 m
    5. 542, Marino Green WEB2330/26Approved · 189 m
    6. 612 Croydon Park Avenue, Dublin 3 3496/25Approved · 203 m
    7. 7Bank Of Ireland, 26 Marino Mart WEB1247/26Approved · 208 m
    8. 811 Croydon Green, Marino WEB2176/26No decision yet · 236 m
    9. 937A, Marino Green WEB2705/26No decision yet · 248 m
    10. 1024 Saint Declan's Terrace, Marino WEB5671/25Approved · 287 m
    11. 1123 Saint Declan's Terrace, Dublin 3 WEB2586/26No decision yet · 305 m
    12. 128 Griffith Avenue, Dublin 9 WEB1228/26Approved · 318 m
    13. 1341 Casino Road, Marino 5093/26No decision yet · 324 m
    14. 1424 Victoria Villas, Clontarf WEB5684/25Approved · 371 m
    15. 15Clontarf & Scots Presbyterian Church, Clontarf Road WEB5678/25Approved · 390 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 124 permissions since 2016, 52 show a start notice and 6 have a completion certificate.

    168 applications lodged within 500 m. Council: 128 approved, 13 refused. After appeals: 124 approved. Of those: 6 signed off, 25 built with the owner's opt-out, 21 started, 72 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT128: lodged → approved13: lodged → refused21: lodged → withdrawn or invalid6: lodged → undecided124: approved → approved13: refused → refused21: withdrawn or invalid → withdrawn6: undecided → undecided2 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal72: approved → no start notice found25: approved → built, owner opted out21: approved → started, not signed off6: approved → signed off168 lodged168 lodged128 approved128 approved13 refused13 refused21 withdrawn or invalid21 withdrawn or invalid6 undecided6 undecided124 approved124 approved15 refused15 refused23 withdrawn23 withdrawn6 undecided6 undecided72 no start notice found72 no start notice found25 built, owner opted out25 built, owner opted out21 started, not signed off21 started, not signed off6 signed off6 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured168 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      DART+ West is planned 941 m away.

      DART+ West, DART+ West:…: railway order granted (July 2024)20242025202620272028DART+ West, DART+ West:…941 m · plannedrailway order granted (July 2024)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 2 within 500 m

      Derelict building 1

      • 1Derelict site DS2344 · derelict since Oct 2026 · 326 m

      Empty land zoned for homes 1

      • 20.1 ha zoned for homes · no homes built on it yet · 320 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 16 and 40 a year; busiest 2022. 91% of decisions were approvals.

      2021: 28, 2022: 40, 2023: 16, 2024: 30, 2025: 34, 2026: 200102030402021: 22 approved2021: 3 refused2021: 3 withdrawn or invalid28’21*2022: 33 approved2022: 4 refused2022: 1 withdrawn or invalid2022: 2 undecided40’222023: 14 approved2023: 1 refused2023: 1 withdrawn or invalid16’232024: 27 approved2024: 3 refused30’242025: 25 approved2025: 2 refused2025: 7 withdrawn or invalid34’252026: 7 approved2026: 9 withdrawn or invalid2026: 4 undecided20’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 28 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 14 in the last 12 months
      14 no sign-off needed
      • 58 Croydon Green, Dublin 3, D03 A7X2 · 2 Nov 2026 · start notice, opted out no sign-off needed · WEB1763/26 · 333 m
      • 8 Copeland Avenue, Dublin 3, D03T938 · 23 Oct 2026 · start notice, opted out no sign-off needed · WEB1723/25 · 480 m
      • 23 Saint Declan's Terrace, Dublin 3, D03 A6C6 · 7 Oct 2026 · short notice no sign-off needed · WEB2586/26 · 319 m
      • 12 Croydon Park Avenue, Dublin 3, D03 A3A0 · 6 Oct 2026 · short notice no sign-off needed · 3496/25 · 215 m
      • 8 Griffith Avenue, Dublin 9, D09 H2R3 · 30 Sept 2026 · start notice, opted out no sign-off needed · WEB1228/26 · 366 m
      • 44 Philipsburgh Avenue, Dublin 3, D03 CK03 · 24 Jun 2026 · short notice no sign-off needed · WEB1496/26 · 493 m
      • 2 Haverty Road, Marino, Dublin 3, D03 V026 · 25 Mar 2026 · start notice, opted out no sign-off needed · WEB2610/25 · 180 m
      • 46 Carleton Road, Dublin, Dublin 3, D03 PX90 · 18 Feb 2026 · short notice no sign-off needed · WEB1903/25 · 189 m
      • 65 Shelmartin Avenue, Marino, Dublin 3, D03 P9C0 · 27 Jan 2026 · short notice no sign-off needed · WEB1158/25 · 355 m
      • 45 Croydon Park Avenue, Dublin, Dublin 3, D03 Y3E0 · 26 Jan 2026 · start notice, opted out no sign-off needed · WEB2391/25 · 339 m
      • 8 Brian Road, Marino, Dublin 3, D03 A020 · 26 Jan 2026 · short notice no sign-off needed · 3407/25 · 327 m
      • 28 Malahide Road, Dublin, Dublin 3, D03 K578 · 3 Dec 2025 · short notice no sign-off needed · WEB2438/25 · 270 m
      • 14 Fairview Green, Dublin 3, D03 T8K3 · 25 Nov 2025 · short notice no sign-off needed · WEB1908/25 · 260 m
      • 124 Shelmartin Avenue, Dublin 3, D03 T8P3 · 14 Nov 2025 · short notice no sign-off needed · WEB2250/25 · 388 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      45-47 Fairview Avenue Lower25no activity on site reported (2025-Q4)328 m
      St. Vincent's Hospital Site779283 being built · 496 not started (2026-Q2)564 m
      19 and 21 Esmond Avenue2121 not started (2026-Q2)593 m
      61-65 Fairview Strand and 3 Esmond Avenue8282 not started (2026-Q2)623 m
      17-19 Richmond Avenue2121 not started (2026-Q2)712 m
      9/9a Richmond Avenue2828 being built (2026-Q2)748 m
      Richmond Road and Convent Avenue104104 not started (2026-Q2)769 m
      Ready Mix Site6868 not started (2026-Q2)770 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Lullabys Montessori & Afterschool · Crèche13 May 2025 · report · Tusla Early Years Inspectorate109 m
      Smart Kids Creche/Montessori · Crèche7 Nov 2024 · report · Tusla Early Years Inspectorate234 m
      First Steps Creche and Montessori · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate360 m
      Westwood Childcare · Crèche10 Mar 2026 · report · Tusla Early Years Inspectorate404 m
      The Rookery Creche and Montessori · Crèche12 Aug 2025 · report · Tusla Early Years Inspectorate595 m
      Fairview Creche and Montessori · Crèche3 Jul 2025 · report · Tusla Early Years Inspectorate669 m
      Little Rainbows Ltd · Crèche20 Apr 2026 · report · Tusla Early Years Inspectorate680 m
      Lullaby's Creche & Montessori · Crèche15 Apr 2025 · report · Tusla Early Years Inspectorate743 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Dublin City Council.
      Homes approved
      Here139
      Council middle62
      Homes started
      Here1,794
      Council middle174
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      97% of homes built before 1971 (council 52%). 84% owner-occupied (council 47%).

      Homes built before 1971
      97% · council 52%
      Homes built since 2001
      1% · council 19%
      Owner-occupied
      84% · council 47%
      Rented
      9% · council 45%
      Children under 15
      18% · council 15%
      Aged 65 and over
      19% · council 13%
      Households with 2+ cars
      23% · council 19%
      Work mainly from home
      17% · council 12%
      This small area (211 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268049007

      Bus
      50 m
      Marino Park · 73 · busiest stop within 500 m: 45 an hour at peak
      Planned
      941 m
      DART+ West, DART+ West: Connolly - Maynooth
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      162 m
      St Joseph¿s Primary School, An Edmund Rice School, 116 pupils
      Homes sold nearby
      79
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • St Joseph¿s Primary School, An Edmund Rice School · primary · 116 pupils · 162 m
      • Marino College · postprimary · 297 pupils · 200 m
      • St Josephs C.B.S. · postprimary · 310 pupils · 261 m
      • St Marys NS · primary · 212 pupils · 445 m
      • St Vincents De Paul Junior NS · primary · 334 pupils · 450 m
      • Árdscoil Rís · postprimary · 563 pupils · 452 m
      • St Vincent De Paul Senior School · primary · 305 pupils · 459 m
      • Howth Rd Mxd NS · primary · 89 pupils · 470 m

      Stops 52

      • Marino Park · 73 · 5/hour at peak · 50 m
      • Marino Green · 73 · 5/hour at peak · 145 m
      • Marino Mart · 130, 14, 15, 27, 27A, 27B · 43/hour at peak · 212 m
      • Crescent Place · 14, 15, 27, 27A, 27B, 42 · 33/hour at peak · 252 m
      • Marino Mart · 14, 15, 27, 27A, 27B, 42 · 31/hour at peak · 270 m
      • Brian Road · 73 · 5/hour at peak · 325 m
      • Fairview · 130, 14, 15, 27, 27A, 27B · 45/hour at peak · 346 m
      • Croydon Park Ave · 73 · 5/hour at peak · 358 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Joseph¿s Primary School, An Edmund Rice School · 162 m+0.9% pupils (116) · temporary classrooms 2024, approved
      • Marino College · 200 m+7.2% pupils (297)
      • St Josephs C.B.S. · 261 m+17.9% pupils (310) · temporary classrooms 2024, approved
      • St Marys NS · 445 m+2.9% pupils (212)
      • St Vincents De Paul Junior NS · 450 m-5.6% pupils (334)
      • Árdscoil Rís · 452 m+0.5% pupils (563)

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 21.32 ha · 224 m
      • Córas Iompair Éireann · 5.06 ha · 444 m
      • Health Service Executive · 0.1 ha · 456 m
      • Dublin City Council · 0.47 ha · 474 m
      • Dublin City Council · 0.57 ha · 476 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Clontarf West D
      Electoral area
      Clontarf
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 2 sites nearby could change: 1 derelict, 1 empty zoned plot.
      • Fairview (bus 130, 14) 346 m away: 45 an hour at morning peak; 313 from all stops within 500 m. Planned: DART+ West 941 m away, railway order granted (July 2024).
      • Here (2022 census): 84% owner-occupied (council 47%); 11% of homes empty (council 8%); most built 1919–1945; 33% drive to work (council 28%); population up 10% since 2016.
      • 9 home extensions within 250 m since 2025. Most were first-floor extensions.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • Homes started within 1 km: 1,665 in the last year, 10 three years before.
      • 28 applications nearby in the last 12 months; 100% approved (council 90%); 0% for work already built (council 14%).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 33
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 11:51 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.