Planning report · Dublin City Council · 500 m around the house · the last 12 months · 19 Oct 2026, 22:46

Saint Attracta's Road

53.36664, -6.28488

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (95%). A building site 495 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1919–1945 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Lithographic Web Press Limited (992 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Natural heritage areas1Royal Canal
Heritage inventory buildings1Church of Christ the King
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 59% approved, and 1 in 2 is asked for more information.

Single-storey rear109 decided · more info asked 14%
96% · council 97%
Two-storey rear80 decided · more info asked 22%
99% · council 96%
Two-storey side17 decided · more info asked 24%
100% · council 98%
Single-storey side15 decided · more info asked 13%
100% · council 99%
Attic or dormer191 decided · more info asked 10%
94% · council 96%
First-floor42 decided · more info asked 10%
93% · council 93%
Porch or front10 decided · more info asked 10%
100% · council 97%
New house in a garden or site54 decided · more info asked 43%
59% · council 72%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 518 nearby, 7,662 council-wide

Extensions and refusals right beside you 6 within 250 m · 0 refused within 100 m

Extensions and refusals near you 6 extensions within 250 m · the last 12 months

3 approved3 no decision or withdrawn
KindAppliedApprovedRefused
First-floor21—
Two-storey rear21—
Rear11—
Single-storey rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 64 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 128 days; Appeal window: 4 weeks; If appealed: +154 days; Building starts: 160 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=463)55 daysIf more info asked (1 in 7)With further information: median 128 days (n=78)128 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 154 days (n=110, all appeals within 1.5 km)+154 daysBuilding startsStart notice: median 160 days after permission (n=278)160 days after permissionSigned off463 days after the start, for the few who file. 44% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated541 decided home extensions, 282 start notices, 110 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    14 of 55 appealed refusals became permissions. 1 of 55 appealed approvals were reversed.

    Refusals appealed55 decided
    14 became permissions
    Approvals appealed55 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months

    None of 1 changed the council's decision

    • 324373 Open · Former 'Matt?s of Cabra' Public House, 2A Fassaugh Avenue, Dublin 7,… · 276 m
    • 500817 Granted with conditions · 75, Saint Jarlath Road, Cabra East, Dublin 7 · 182 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher19 Oct 2026, 01:37open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 4

    What's changing around you?

    Street map around Saint Attracta's Road with 15 numbered planning items
    ⌖ the houseOpen for commentsDerelict buildingBuilding site that stoppedAppealBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 166, Dowth Avenue WEB3285/26No decision yet · 486 m
    2. 2122 Quarry Road, Cabra DS1694Derelict building · 495 m
    3. 3Carnlough Road, Cabra PL29N.300492Building site that stopped · 495 m
    4. 475, Saint Jarlath Road 500817Appeal: approved with conditions · 182 m
    5. 575 Saint Jarlath Road, Dublin 7 WEB5729/25Building started · 193 m
    6. 60.1 ha zoned for homesEmpty land zoned for homes · 305 m
    7. 7109, Saint Attracta Road WEB1657/26Approved · 66 m
    8. 884B Shandon Gardens, Phibsborough WEB2650/26No decision yet · 100 m
    9. 958 Faussagh Road, Cabra East WEB2298/26Approved · 218 m
    10. 10106 Shandon Park, Phibsborough WEB6084/25Approved · 265 m
    11. 1147, Claremont Court WEB1655/26Approved · 418 m
    12. 1220, Dowth Avenue WEB5876/25Approved · 418 m
    13. 1312, Faussagh Avenue WEB1812/26Approved · 431 m
    14. 1454, Shandon Drive WEB1500/26Approved · 436 m
    15. 1552, Shandon Park WEB1473/26Approved · 436 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 96 permissions since 2016, 41 show a start notice and 0 have a completion certificate.

    122 applications lodged within 500 m. Council: 97 approved, 6 refused. After appeals: 96 approved. Of those: 0 signed off, 17 built with the owner's opt-out, 24 started, 55 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT97: lodged → approved6: lodged → refused17: lodged → withdrawn or invalid2: lodged → undecided96: approved → approved6: refused → refused17: withdrawn or invalid → withdrawn2: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal55: approved → no start notice found17: approved → built, owner opted out24: approved → started, not signed off122 lodged122 lodged97 approved97 approved6 refused6 refused17 withdrawn or invalid17 withdrawn or invalid2 undecided2 undecided96 approved96 approved6 refused6 refused18 withdrawn18 withdrawn2 undecided2 undecided55 no start notice found55 no start notice found17 built, owner opted out17 built, owner opted out24 started, not signed off24 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured122 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 21 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-21 WEB3285/26: application received — The development will consist of: 1. The change of use of the existing ground floor premises from a betting office to a ntoday24 Oct29 Oct3 Nov8 Nov13 Nov18 NovWEB3285/26: application received — The development will consist of: 1. The change of use of the existing ground floor premises from a betting office to a n · 486 m away · 2026-10-21
    Comments close
    • Comments close 21 Oct 20262 days left
      1WEB3285/26 · application received — The development will consist of: 1. The change of use of the existing ground floor premises from…
      €20 to the council · 486 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    1 building site nearby stopped before sign-off. DART+ West is planned 234 m away.

    Carnlough Road, Cabra · 420 homes: 420 homes, started May 2019, never signed off; DART+ West, DART+ West:…: railway order granted (July 2024); DART+ South West, DART+ South…: railway order granted (13 November 2024)2019202020212022202320242025202620272028Carnlough Road, Cabra · 420 homes495 m · PL29N.300492420 homes, started May 2019, never signed off420 homes, started May 2019, never signed offDART+ West, DART+ West:…234 m · plannedrailway order granted (July 2024)DART+ South West, DART+ South…257 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 3 within 500 m

    Derelict building 1

    • 2122 Quarry Road, Cabra · derelict since May 2026 · 495 m

    Building site that stopped 1

    • 3Carnlough Road, Cabra · 420 homes, started May 2019, never signed off · 495 m

    Empty land zoned for homes 1

    • 60.1 ha zoned for homes · no homes built on it yet · 305 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 19 Oct 2026, 02:28
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    Council meetings (ModernGov)Public19 Oct 2026, 02:28open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 8

    Applications within 500 m, by year

    Between 11 and 20 a year; busiest 2025. 94% of decisions were approvals.

    2019: 19, 2020: 15, 2021: 15, 2022: 11, 2023: 14, 2024: 12, 2025: 20, 2026: 16051015202019: 18 approved2019: 1 withdrawn or invalid19’19*2020: 14 approved2020: 1 refused15’202021: 14 approved2021: 1 refused15’212022: 9 approved2022: 2 refused11’222023: 13 approved2023: 1 withdrawn or invalid14’232024: 12 approved12’242025: 11 approved2025: 2 refused2025: 7 withdrawn or invalid20’252026: 6 approved2026: 8 withdrawn or invalid2026: 2 undecided16’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2019 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 166, Dowth Avenue, Dublin 7 comments close 21 Oct 2026
      The development will consist of: 1. The change of use of the existing ground floor premises from a betting…
      WEB3285/2616 Sept 2026486 m
    Every application within 500 m 23 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Building work nearby 10 in the last 12 months
    1 not signed off9 no sign-off needed
    • 54 Shandon Drive, Dublin 7, D07 X6X8 · 24 Sept 2026 · short notice no sign-off needed · WEB1500/26 · 447 m
    • 82 Shandon Park, Phibsboro, Dublin 7, D07 DC67 · 21 Aug 2026 · short notice no sign-off needed · WEB2106/26 · 345 m
    • 12 Faussagh Avenue, Dublin 7, D07 A6R7 · 4 Aug 2026 · start notice, opted out no sign-off needed · WEB1812/26 · 439 m
    • 39 Shandon Park, Dublin 7, D07 HW71 · 20 Jul 2026 · short notice no sign-off needed · WEB2349/24 · 478 m
    • 575 Saint Jarlath Road, Dublin 7, Dublin, D07 E6E4 · 15 Jul 2026 · start notice, opted out no sign-off needed · WEB5729/25 · 193 m
    • 31 Erris Road, Dublin 7, D07 DX25 · 29 Jun 2026 · start notice, opted out no sign-off needed · WEB1482/25 · 489 m
    • Bannow Road, Dublin, Dublin 7, DO7 A4N8 · 25 Jun 2026 · 7-day notice not signed off · 464 m
    • 20 Dowth Avenue, Dublin 7, D07 DVF8 · 3 Apr 2026 · short notice no sign-off needed · WEB5876/25 · 430 m
    • 23 Connaught Parade, Dublin 7, D07 FC61 · 28 Jan 2026 · short notice no sign-off needed · WEB5274/25 · 477 m
    • 42 Offaly Road, Cabra, Dublin 7, D07 Y478 · 21 Jan 2026 · start notice, opted out no sign-off needed · 1872/25 · 483 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 19 Oct 2026, 01:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Homes coming 0 not started
    • 75 Old Cabra Road, Dublin 7 (Phase 1) · Completed · 6 homes · 365 m
    • Bannow Road, Cabra, Dublin 7 (Phase 1) · Stage 4 tender approval · 144 homes · 365 m
    • Blackbird Park, Rathoath Road, Cabra, Dublin 7 (Phase 1) · On site · 95 homes · 365 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    146 Connaught Street2020 built (2025-Q1)431 m
    Bannow Road Development144144 not started (2026-Q2)456 m
    52 & 54 Quarry Road2929 not started (2026-Q2)530 m
    76, 76G & 280 Bannow Road69—568 m
    Old Bakery Site184182 being built · 2 not started (2026-Q2)627 m
    29 New Cabra Road6—669 m
    St. Finbar's Court4646 built (2025-Q4)718 m
    Stone Villa1313 not started (2026-Q2)757 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Naionra Bharra · Crèche4 Nov 2025 · report · Tusla Early Years Inspectorate539 m
    Safari Childcare · Crèche24 Jul 2025 · report · Tusla Early Years Inspectorate587 m
    Silverspoon Pre- School &Montessori · Crèche15 Jan 2026 · report · Tusla Early Years Inspectorate657 m
    Lollipop Lane · Crèche5 Feb 2026 · report · Tusla Early Years Inspectorate679 m
    Happy Days · Crèche22 Jan 2025 · report · Tusla Early Years Inspectorate683 m
    D7 Afterschool Care Ltd · Crèche27 Aug 2024 · report · Tusla Early Years Inspectorateapprox. 746 m
    St. Peter's Montessori School · Crèche7 Apr 2025 · report · Tusla Early Years Inspectorate752 m
    Hyde & Seek Childcare · Crèche13 Mar 2025 · report · Tusla Early Years Inspectorate863 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here116
    Council middle64
    Homes started
    Here557
    Council middle138
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    94% of homes built before 1971 (council 52%). 64% owner-occupied (council 47%).

    Homes built before 1971
    94% · council 52%
    Homes built since 2001
    0% · council 19%
    Owner-occupied
    64% · council 47%
    Rented
    29% · council 45%
    Children under 15
    15% · council 15%
    Aged 65 and over
    16% · council 13%
    Households with 2+ cars
    11% · council 19%
    Work mainly from home
    10% · council 12%
    This small area (234 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268031006

    Bus
    258 m
    Faussagh Road · 120 · busiest stop within 500 m: 13 an hour at peak
    Planned
    234 m
    DART+ West, DART+ West: Connolly - Maynooth
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    338 m
    Christ The King Girls Senior School, 74 pupils
    Homes sold nearby
    44
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Christ The King Girls Senior School · primary · 74 pupils · 338 m
    • Christ The King I G · primary · 37 pupils · 338 m
    • Christ The King B NS · primary · 86 pupils · 341 m
    • Gaelscoil Bharra · primary · 212 pupils · 347 m
    • St. Vincent's Primary School · primary · 240 pupils · 667 m
    • Cabra Community College · postprimary · 264 pupils · 668 m
    • St Vincents C.B.S. Glasnevin · postprimary · 408 pupils · 683 m
    • Broombridge Educate Together National School · primary · 387 pupils · 759 m

    Stops 67

    • Faussagh Road · 120 · 4/hour at peak · 258 m
    • Cabra PO · 120 · 3/hour at peak · 263 m
    • Faussagh Road · 120 · 3/hour at peak · 299 m
    • St Attracta Road · 120 · 4/hour at peak · 301 m
    • Cabra · Green · 13/hour at peak · 320 m
    • Cabra · Green · 13/hour at peak · 322 m
    • Naomh Fionnbarra · 120 · 3/hour at peak · 332 m
    • Cabra PO · 120 · 4/hour at peak · 397 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Christ The King I G · 338 m-7.5% pupils (37)
    • Christ The King Girls Senior School · 338 m-3.9% pupils (74)
    • Christ The King B NS · 341 m-14.9% pupils (86)
    • Gaelscoil Bharra · 347 m-0.9% pupils (212)
    • St. Vincent's Primary School · 667 m-5.1% pupils (240)
    • Cabra Community College · 668 m+1.5% pupils (264)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 1.33 ha · 107 m
    • Dublin City Council · 0.22 ha · 168 m
    • Dublin City Council · 0.38 ha · 230 m
    • Córas Iompair Éireann · 0.51 ha · 279 m
    • Córas Iompair Éireann · 0.95 ha · 359 m
    • Dublin City Council · 0.14 ha · 448 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Council consultation portalsPublic19 Oct 2026, 01:38open
    Council meetings (ModernGov)Public19 Oct 2026, 02:28open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 486 m away open for comments until 21 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Cabra East B
    Electoral area
    Cabra-Glasnevin
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 3 sites nearby could change: 1 derelict, 1 stalled build, 1 empty zoned plot.
    • 1 application open for comments nearby; nearest closes 21 Oct 2026.
    • Cabra (Luas Green) 320 m away: 13 an hour at morning peak; 63 from all stops within 500 m. Planned: DART+ West 234 m away, railway order granted (July 2024).
    • Here (2022 census): 64% owner-occupied (council 47%); 9% of homes empty (council 8%); most built 1919–1945; 29% drive to work (council 28%).
    • 6 home extensions within 250 m since 2025. Most were first-floor extensions.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 199 in the last year, 35 three years before.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.019 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public19 Oct 2026
    www2.courts.ie—© the publisher19 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public19 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.019 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence19 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 19 Oct 2026, 22:46 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.