PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 13:01

Howth Road, Dublin

53.37408, -6.19993

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (98%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Howth RoadBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 5 files on Howth Road2022: 1 file on Howth Road2023: 3 files on Howth Road2024: 6 files on Howth Road2025: 4 files on Howth Road2026: 3 files on Howth Road22 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building1 within 100 m Furry Park House
Heritage inventory1 within 100 m Furry Park
Radon1 in 20 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings8post box; St Brigid's Church
Radon grid squares3
Monuments3Church; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 83% approved, and 1 in 3 is asked for more information.

Single-storey rear112 decided · more info asked 15%
100% · council 97%
Two-storey rear64 decided · more info asked 25%
100% · council 96%
Two-storey side26 decided · more info asked 12%
100% · council 98%
Single-storey side19 decided · more info asked 16%
100% · council 99%
Attic or dormer322 decided · more info asked 12%
98% · council 96%
First-floor46 decided · more info asked 11%
98% · council 94%
Garage conversion53 decided · more info asked 21%
100% · council 99%
Porch or front13 decided · more info asked 8%
92% · council 97%
New house in a garden or site35 decided · more info asked 31%
83% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 690 nearby, 5,771 council-wide

Figure 3

Howth Road, file by file since 2021

11 of 11 decided extensions on the road were approved.

22 planning files on Howth Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 232 · 2021 · single-storey rear · undecided · 2842/21No. 232 · 2021 · first-floor · approved · 3561/21No. 213 · 2021 · attic conversion / dormer · approved · WEB1317/21No number · 2023 · other extension · approved · 3650/23No. 200 · 2023 · attic conversion / dormer · approved · 4565/23No. 16 · 2023 · two-storey rear · approved · WEB1832/23No. 336 · 2024 · porch / front · approved · 3029/24No. 264 · 2024 · attic conversion / dormer · approved · WEB1766/24No. 244 · 2024 · attic conversion / dormer · approved · WEB2570/24No. 266 · 2025 · attic conversion / dormer · approved · WEB1552/25No. 265 · 2026 · attic conversion / dormer · withdrawn or invalid · WEB1869/26No. 326 · 2026 · porch / front · approved · WEB1927/26No. 265 · 2026 · attic conversion / dormer · approved · WEB2158/26Porches, roofs, otherNo. 312 · 2021 · other extension · approved · WEB1839/21No. 312 · 2021 · other extension · approved · WEB5125/21No. 189 · 2022 · other work · approved · 4686/22No. 171 · 2024 · other work · approved · 4030/24No. 338 · 2024 · other work · approved · WEB1918/24No. 191A · 2024 · other work · approved · WEB2532/24No. 177 · 2025 · other work · withdrawn or invalid · WEB2712/25No. 177 · 2025 · other work · withdrawn or invalid · WEB2786/25No. 177 · 2025 · other work · approved · WEB2824/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

22 files with "Howth Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

3 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic53—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 64 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 120 days; Appeal window: 4 weeks; If appealed: +160 days; Building starts: 144 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=612)55 daysIf more info asked (1 in 7)With further information: median 120 days (n=101)120 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 160 days (n=90, all appeals within 1.5 km)+160 daysBuilding startsStart notice: median 144 days after permission (n=365)144 days after permissionSigned off463 days after the start, for the few who file. 57% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated713 decided home extensions, 374 start notices, 90 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    7 of 24 appealed refusals became permissions. 4 of 67 appealed approvals were reversed.

    Refusals appealed24 decided
    7 became permissions
    Approvals appealed67 decided
    4 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 502145 Pending · 16 Killester Avenue, Dublin, Dublin 5, D05 XF25 · 435 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Howth Road, Dublin with 13 numbered planning items
    ⌖ the houseOpen for commentsBuilding startedApprovedNo decision yetRefused
    1. 146 Middle Third, Killester WEB3493/26No decision yet · 359 m
    2. 231 Furry Park Road, Dublin 5 WEB2776/25Building started · 164 m
    3. 3265, Howth Road WEB2158/26Approved · 93 m
    4. 4105, Furry Park Road WEB5662/25Approved · 162 m
    5. 548, Furry Park Road WEB2041/26Approved · 195 m
    6. 635, Middle Third WEB2051/26Approved · 268 m
    7. 714 Middle Third, Killester WEB5587/25Approved · 309 m
    8. 8194, Dunluce Road WEB2195/26No decision yet · 314 m
    9. 919, The Orchard WEB1257/26No decision yet · 328 m
    10. 1020, Killester Avenue WEB2070/26Approved · 381 m
    11. 1198 Brookwood Avenue, Artane 5057/26Approved · 429 m
    12. 12326, Howth Road WEB1927/26Approved · 440 m
    13. 131, Brookwood Park WEB2039/26Refused · 455 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 113 permissions since 2016, 51 show a start notice and 2 have a completion certificate.

    138 applications lodged within 500 m. Council: 111 approved, 13 refused. After appeals: 113 approved. Of those: 2 signed off, 25 built with the owner's opt-out, 24 started, 62 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT111: lodged → approved13: lodged → refused11: lodged → withdrawn or invalid3: lodged → undecided110: approved → approved9: refused → refused11: withdrawn or invalid → withdrawn3: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal62: approved → no start notice found25: approved → built, owner opted out24: approved → started, not signed off2: approved → signed off138 lodged138 lodged111 approved111 approved13 refused13 refused11 withdrawn or invalid11 withdrawn or invalid3 undecided3 undecided113 approved113 approved9 refused9 refused13 withdrawn13 withdrawn3 undecided3 undecided62 no start notice found62 no start notice found25 built, owner opted out25 built, owner opted out24 started, not signed off24 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured138 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 13 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-13 WEB3493/26: application received — We, Neal & Louise O`Flynn are applying for planning permission for; (i) partial demolition of the existing semi-detachedtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3493/26: application received — We, Neal & Louise O`Flynn are applying for planning permission for; (i) partial demolition of the existing semi-detached · 359 m away · 2026-11-13
    Comments close
    • Comments close 13 Nov 202612 days left
      1WEB3493/26 · application received — We, Neal & Louise O`Flynn are applying for planning permission for; (i) partial demolition of…
      €20 to the council · 359 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 20 and 32 a year; busiest 2022. 90% of decisions were approvals.

    2021: 26, 2022: 32, 2023: 20, 2024: 22, 2025: 26, 2026: 120102030402021: 23 approved2021: 1 refused2021: 1 withdrawn or invalid2021: 1 undecided26’21*2022: 25 approved2022: 5 refused2022: 2 withdrawn or invalid32’222023: 16 approved2023: 3 refused2023: 1 undecided20’232024: 19 approved2024: 2 refused2024: 1 withdrawn or invalid22’242025: 22 approved2025: 1 refused2025: 3 withdrawn or invalid26’252026: 6 approved2026: 1 refused2026: 4 withdrawn or invalid2026: 1 undecided12’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 16 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 14 in the last 12 months
    1 not signed off13 no sign-off needed
    • 100 Abbeyfield, Dublin 5 · 28 Sept 2026 · 1 homes · start notice not signed off · 471 m
    • 6 Vernon Rise, Clontarf, Dublin 3, D03 N9Y6 · 31 Aug 2026 · start notice, opted out no sign-off needed · WEB2026/25 · 383 m
    • 205 Vernon Avenue, Dublin 3, D03 AE92 · 6 Aug 2026 · short notice no sign-off needed · 4320/23 · 463 m
    • 117 Killester Park, Dublin 5, Dublin, D05 E3F6 · 11 Jun 2026 · start notice, opted out no sign-off needed · WEB1812/23 & WEB2175/25 · 493 m
    • 231 Furry Park Road, Dublin 5, D05 CX78 · 3 Jun 2026 · start notice, opted out no sign-off needed · WEB2776/25 · 164 m
    • 72 Killester Avenue, Killester, Dublin 5, D05 F685 · 11 May 2026 · start notice, opted out no sign-off needed · WEB1797/25 · 388 m
    • 14 Middle Third, Dublin, Dublin 5, D05 KX62 · 28 Apr 2026 · start notice, opted out no sign-off needed · WEB5587/25 · 319 m
    • 31 Furry Park Road, Dublin 5, D05 CX78 · 13 Apr 2026 · start notice, opted out no sign-off needed · WEB2776/25 · 164 m
    • 160 Castle Avenue, Clontarf, Dublin 3, D03 P7N1 · 3 Mar 2026 · start notice, opted out no sign-off needed · WEB2705/25 · 388 m
    • 37 Furry Park Road, Killester, Dublin 5, D05 DX34 · 16 Feb 2026 · start notice, opted out no sign-off needed · 3245/25 · 167 m
    • 80 Furry Park Road, Killester, Dublin 5, D05 VW82 · 26 Jan 2026 · short notice no sign-off needed · WEB2978/25 · 258 m
    • 125 Abbeyfield, Dublin, Dublin 5 · 4 Dec 2025 · start notice, opted out no sign-off needed · WEB1796/25 · 310 m
    • 105 Abbeyfield, Killester, Dublin 5, D05 T8K6 · 25 Nov 2025 · start notice, opted out no sign-off needed · WEB2034/25 · 480 m
    • 27 Dunluce Road, Clontarf, Dublin 3, D03 AY61 · 3 Nov 2025 · short notice no sign-off needed · WEB1707/25 · 247 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    63-67A Collins Avenue East6767 built (2025-Q1)652 m
    144 Harmonstown Road43no activity on site reported (2026-Q2)909 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Karaville Childcare · Crèche14 Feb 2024 · report · Tusla Early Years Inspectorate371 m
    Best Start Childcare Killester · Crèche17 Jun 2025 · report · Tusla Early Years Inspectorate609 m
    Magic Little Kids Limited · Crèche10 Jul 2025 · report · Tusla Early Years Inspectorate640 m
    St. Brigid's Playgroup · Crèche6 Jun 2024 · report · Tusla Early Years Inspectorate796 m
    Little Stars Montessori · Crèche3 Oct 2024 · report · Tusla Early Years Inspectorate838 m
    Naíonra Neasáin · Crèche11 Feb 2025 · report · Tusla Early Years Inspectorate925 m
    Kids World · Crèche11 Jun 2025 · report · Tusla Early Years Inspectorate953 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Quieter than most of Dublin City Council.
    Homes approved
    Here0
    Council middle63
    Homes started
    Here15
    Council middle174
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    16% of homes built before 1971 (council 52%). 45% owner-occupied (council 47%).

    Homes built before 1971
    16% · council 52%
    Homes built since 2001
    8% · council 19%
    Owner-occupied
    45% · council 47%
    Rented
    51% · council 45%
    Children under 15
    12% · council 15%
    Aged 65 and over
    12% · council 13%
    Households with 2+ cars
    20% · council 19%
    Work mainly from home
    12% · council 12%
    This small area (178 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268045002

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    130 m
    The Demesne · 29n, 6, H1 · busiest stop within 500 m: 11 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    311 m
    St Brigids Boys NS, 287 pupils
    Homes sold nearby
    44
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • St Brigids Boys NS · primary · 287 pupils · 311 m
    • St Pauls College · postprimary · 650 pupils · 456 m
    • St Marys Secondary School · postprimary · 320 pupils · 566 m
    • Central Remedial Clinic · primary · 78 pupils · 580 m
    • Killester Raheny Clontarf Educate Together National School · primary · 176 pupils · 630 m
    • St Brigids Convent NS · primary · 369 pupils · 631 m
    • Scoil Neasain · primary · 241 pupils · 925 m
    • Scoil Chiarain · primary · 151 pupils · 995 m

    Stops 40

    • The Demesne · 29n, 6, H1, H2, H3 · 9/hour at peak · 130 m
    • St Brigid's Church · 6, H1, H2, H3 · 10/hour at peak · 154 m
    • St Brigid's Church · 29n, 6, H1, H2, H3 · 9/hour at peak · 220 m
    • The Demesne · 6, H1, H2, H3 · 10/hour at peak · 223 m
    • Killester · DART · 11/hour at peak · 305 m
    • Killester Village · 104, 29n, 6, H1, H2, H3 · 10/hour at peak · 419 m
    • Remedial Clinic · 104 · 1/hour at peak · 443 m
    • Killester Village · 104, 6, H1, H2, H3 · 10/hour at peak · 450 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Brigids Boys NS · 311 m-1.7% pupils (287)
    • St Pauls College · 456 m+2% pupils (650) · a sports hall 2025, approved
    • St Marys Secondary School · 566 m+0.3% pupils (320)
    • Central Remedial Clinic · 580 m-6% pupils (78)
    • Killester Raheny Clontarf Educate Together National School · 629 m+15% pupils (176)
    • St Brigids Convent NS · 631 m-3.7% pupils (369)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.42 ha · 200 m
    • Dublin City Council · 0.23 ha · 257 m
    • Dublin City Council · 41.47 ha · 440 m
    • Health Service Executive · 2.06 ha · 458 m
    • Dublin City Council · 0.2 ha · 477 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 359 m away open for comments until 13 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Clontarf East E
    Electoral area
    Clontarf
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 13 Nov 2026.
    • Killester (train DART) 305 m away: 11 an hour at morning peak; 88 from all stops within 500 m.
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 51% rent (council 45%); 14% of homes empty (council 8%); most built 1991–2000; 26% drive to work (council 28%); population down 2% since 2016.
    • 5 home extensions within 250 m since 2025. Most were dormers or attic conversions.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 13:01 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.