Planning report · Dublin City Council · 500 m around the house · the last 12 months · 12 Oct 2026, 11:56

Griffith Lawns, Dublin

53.37745, -6.26030

Homes here mostly date from 1919–1945. 2 planning files on this house, the latest from 2021. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed. 2 planning files on this house, the latest from 2021.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945. 2 planning files on this house.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2021: WEB1395/21 · work already done, approved2021: WEB1381/21 · work already done, withdrawn or invalid

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    WEB1395/21 · work already done · approved 2021 · work already done
    approvedstartedsigned off?
  2. 2021
    WEB1381/21 · work already done · withdrawn
    approved?startedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

DCC_DP_OWN · — – —

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Heritage inventory1 within 100 m post box
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings10Bealnagowan House; Bon Secours Hospital
Radon grid squares1
Monuments6Ring-ditch; Castle - unclassified
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, constraints.niah, constraints.radon, rzlt, constraints, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 12 Oct 2026, 00:09
SourceLicenceFetchedLink
bcmsCC-BY-4.012 Oct 2026, 00:09open
npadCC-BY-4.012 Oct 2026, 01:44open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–100% by type. A new house in a garden is harder: 67% approved, and 1 in 3 is asked for more information.

Single-storey rear125 decided · more info asked 15%
97% · council 97%
Two-storey rear97 decided · more info asked 25%
97% · council 96%
Two-storey side24 decided · more info asked 25%
96% · council 98%
Single-storey side11 decided · more info asked 18%
100% · council 99%
Attic or dormer254 decided · more info asked 9%
99% · council 96%
First-floor34 decided · more info asked 18%
94% · council 93%
Garage conversion34 decided · more info asked 9%
100% · council 99%
Porch or front17 decided · more info asked 18%
100% · council 97%
New house in a garden or site45 decided · more info asked 33%
67% · council 72%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 641 nearby, 7,930 council-wide

Extensions and refusals right beside you 5 within 250 m · 1 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

3 approved1 refused1 no decision or withdrawn
KindAppliedApprovedRefused
Rear311
Single-storey rear11—
Two-storey rear11—

Refused within 100 m 1 in the last 12 months

  • WEB5635/25 · rear extension · refused 12 Jan 2026 · 83 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: npad, acp · fetched 12 Oct 2026, 01:44
SourceLicenceFetchedLink
npadCC-BY-4.012 Oct 2026, 01:44open
acpCC-BY-4.09 Oct 2026, 23:03open
Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
SourceLicenceFetchedLink
acpCC-BY-4.09 Oct 2026, 23:03open
bcmsCC-BY-4.012 Oct 2026, 00:09open
npadCC-BY-4.012 Oct 2026, 01:44open
Question 3

How long, and what if someone objects?

Figure 3

A home extension's journey here

A decision takes 55 days. 1 in 7 is asked for more information, which adds about 65 days. Building starts about 5 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 122 days; Appeal window: 4 weeks; If appealed: +129 days; Building starts: 140 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=570)55 daysIf more info asked (1 in 7)With further information: median 122 days (n=104)122 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 129 days (n=109, all appeals within 1.5 km)+129 daysBuilding startsStart notice: median 140 days after permission (n=378)140 days after permissionSigned off441 days after the start, for the few who file. 50% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated674 decided home extensions, 381 start notices, 109 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 4

What appeals changed

13 of 45 appealed refusals became permissions. 2 of 66 appealed approvals were reversed.

Refusals appealed45 decided
13 became permissions
Approvals appealed66 decided
2 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 2 in the last 12 months

1 of 2 changed the council's decision

  • 501155 Refused · Rear of 45A, Home Farm Road and Clare Road, Drumcondra, Dublin 9, D09… · 458 m report
  • 500297 Granted · Rear of no. 36 Ballymun Road, Glasnevin Dublin 9 · 456 m report
Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
SourceLicenceFetchedLink
acpCC-BY-4.09 Oct 2026, 23:03open
courtsall-rights-reserved12 Oct 2026, 01:27open
npadCC-BY-4.012 Oct 2026, 01:44open
Question 4

What's changing around you?

Street map around Griffith Lawns, Dublin with 15 numbered planning items
⌖ the houseDerelict buildingLarge schemeRefusedBuilding startedApprovedNo decision yet
  1. 165 Saint Mobhi Road, Dublin 9 DS1847Derelict building · 345 m
  2. 2Bealnagown Saint Mobhi Boithirin Dublin 9 D09K5X2 DS2163Derelict building · 411 m
  3. 3Balnagowan House, St. Mobhi Boithirin WEB2324/26No decision yet · 374 m
  4. 4Mont La Verna, 35 Bantry Road WEB5635/25Refused · 83 m
  5. 537 Lambay Road, Dublin 9 WEB2718/25Building started · 100 m
  6. 629 Valentia Road, Dublin 9 WEB5861/25Approved · 172 m
  7. 78 Rathlin Road, Dublin 9 WEB2564/26No decision yet · 208 m
  8. 811 Valentia Road, Drumcondra WEB5928/25Approved · 226 m
  9. 94, The Rise WEB2092/26Approved · 229 m
  10. 1077, Home Farm Road WEB5383/25Approved · 237 m
  11. 1136, Home Farm Road WEB3141/26No decision yet · 324 m
  12. 1222, Walnut Lawn WEB1234/26Approved · 344 m
  13. 1332 The Rise, Glasnevin WEB5935/25Approved · 357 m
  14. 1443 Clare Road, Drumcondra 5162/26No decision yet · 379 m
  15. 1586, Ballymun Road WEB1606/26Approved · 433 m
Figure 5

What happens to applications within 500 m

Permission isn't building. Of 135 permissions since 2016, 77 show a start notice and 7 have a completion certificate. Most owners opt out of sign-off.

169 applications lodged within 500 m. Council: 137 approved, 11 refused. After appeals: 135 approved. Of those: 7 signed off, 44 built with the owner's opt-out, 26 started, 58 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT137: lodged → approved11: lodged → refused18: lodged → withdrawn or invalid3: lodged → undecided133: approved → approved9: refused → refused18: withdrawn or invalid → withdrawn3: undecided → undecided4 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal58: approved → no start notice found44: approved → built, owner opted out26: approved → started, not signed off7: approved → signed off169 lodged169 lodged137 approved137 approved11 refused11 refused18 withdrawn or invalid18 withdrawn or invalid3 undecided3 undecided135 approved135 approved9 refused9 refused22 withdrawn22 withdrawn3 undecided3 undecided58 no start notice found58 no start notice found44 built, owner opted out44 built, owner opted out26 started, not signed off26 started, not signed off7 signed off7 signed off

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured169 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 6

The next 30 days

Nothing closes within 500 m in the next 30 days.

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 2 within 500 m

    Derelict building 2

    • 165 Saint Mobhi Road, Dublin 9 · derelict since Aug 2026 · 345 m
    • 2Bealnagown Saint Mobhi Boithirin Dublin 9 D09K5X2 · derelict since Jun 2026 · 411 m
    Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    derelictCC-BY-4.05 Oct 2026, 09:35open
    moderngovpublic12 Oct 2026, 01:27open
    npadCC-BY-4.012 Oct 2026, 01:44open
    rzltCC-BY-4.012 Oct 2026, 00:14open
    Figure 7

    Applications within 500 m, by year

    Between 13 and 27 a year; busiest 2025. 93% of decisions were approvals.

    2019: 25, 2020: 13, 2021: 23, 2022: 16, 2023: 24, 2024: 23, 2025: 27, 2026: 1801020302019: 22 approved2019: 3 refused25’19*2020: 13 approved13’202021: 22 approved2021: 1 refused23’212022: 15 approved2022: 1 withdrawn or invalid16’222023: 21 approved2023: 2 refused2023: 1 withdrawn or invalid24’232024: 22 approved2024: 1 withdrawn or invalid23’242025: 17 approved2025: 4 refused2025: 6 withdrawn or invalid27’252026: 5 approved2026: 1 refused2026: 9 withdrawn or invalid2026: 3 undecided18’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2019 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 26 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 12 Oct 2026, 01:44
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Oct 2026, 01:44open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    Building work nearby 15 in the last 12 months
    2 not signed off13 no sign-off needed
    • 537 Lambay Road, Dublin 9, D09 CH04 · 5 Oct 2026 · short notice no sign-off needed · WEB2718/25 · 100 m
    • 36 Ballymun Road, Dublin 9 · 3 Sept 2026 · 2 homes · start notice, opted out no sign-off needed · WEB2285/25 PL-500297-DN-25 · 493 m
    • 46 Ballymun Road, Dublin 9, Dublin City, Dublin 9 · 15 Jun 2026 · 7-day notice not signed off · 2683/21 · 419 m
    • 22 Walnut Lawn, Dublin 9, D09 X0C2 · 10 Jun 2026 · short notice no sign-off needed · WEB1234/26 · 357 m
    • 11 Valentia Road, Drumcondra, Dublin 9 · 27 May 2026 · short notice no sign-off needed · 5928/25 · 219 m
    • 29 Valentia Road, Drumcondra, Dublin 9, D09 CP20 · 26 May 2026 · start notice, opted out no sign-off needed · WEB5861/25 · 221 m
    • 29 Valentia Road, Drumcondra, Dublin 9, D09 CP20 · 14 May 2026 · start notice, opted out no sign-off needed · WEB5861/25 · 221 m
    • 69 Hardiman Road, Drumcondra, Dublin 9, Dublin 9, D09 X9X9 · 26 Feb 2026 · start notice, opted out no sign-off needed · WEB2365/25 · 397 m
    • 32 The Rise, Dublin 9, D09 H2H9 · 5 Feb 2026 · start notice, opted out no sign-off needed · 3736/24 · 373 m
    • 14 Bantry Road, Drumcondra, Dublin 9, D09 YC53 · 3 Feb 2026 · start notice, opted out no sign-off needed · WEB2955/25 · 163 m
    • 31 Hardiman Road, Dublin, Dublin 9, D09 VY73 · 27 Jan 2026 · start notice, opted out no sign-off needed · 4453/24 · 424 m
    • The Rise, Dublin, Dublin 9, D09 R7W2 · 23 Jan 2026 · start notice, opted out no sign-off needed · WEB2238/25 · 459 m
    • 400 Griffith Avenue, Dublin, Dublin 9, D09 R2T3 · 22 Jan 2026 · short notice no sign-off needed · WEB5005/25 · 159 m
    • 35 Bantry Road, Drumcondra, Dublin 9, D09 FC95 · 19 Jan 2026 · start notice not signed off · WEB1275/25 · 117 m
    • 21 Walsh Road, Dublin, Dublin 9, D09 VF96 · 16 Jan 2026 · start notice, opted out no sign-off needed · WEB1440/25 · 338 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 12 Oct 2026, 00:09
    SourceLicenceFetchedLink
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Balnagowan House30no activity on site reported (2026-Q2)374 m
    Glenavon House52—375 m
    Glasnevin Autos101101 built (2026-Q1)639 m
    116-120 Drumcondra Road Upper122—750 m
    The Addison Lodge and Glasnevin Lodge2727 built (2025-Q3)842 m
    Collins Avenue Extension Development67—927 m
    Swords Road, Whitehall472138 being built · 334 not started (2026-Q2)965 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Apples Montessori School · Crèche17 May 2024 · report · Tusla Early Years Inspectorate219 m
    Tír na NÓg · Crèche9 Oct 2024 · report · Tusla Early Years Inspectorate393 m
    Old Mc Donalds · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate594 m
    Na Fianna Preschool · Crèche16 Apr 2026 · report · Tusla Early Years Inspectorate674 m
    Hyde & Seek Childcare (Millbourne) · Crèche20 Mar 2025 · report · Tusla Early Years Inspectorate868 m
    Prospect Montessori · Crèche1 Oct 2025 · report · Tusla Early Years Inspectorate876 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: dublin_pipeline, npad, schools, tusla_ey · fetched 5 Oct 2026, 23:01
    SourceLicenceFetchedLink
    dublin_pipelineCC-BY-4.05 Oct 2026, 23:01open
    npadCC-BY-4.012 Oct 2026, 01:44open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area About as busy as most of Dublin City Council.
    Homes approved
    Here83
    Council middle63
    Homes started
    Here149
    Council middle125
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    89% of homes built before 1971 (council 52%). 92% owner-occupied (council 47%).

    Homes built before 1971
    89% · council 52%
    Homes built since 2001
    0% · council 19%
    Owner-occupied
    92% · council 47%
    Rented
    8% · council 45%
    Children under 15
    20% · council 15%
    Aged 65 and over
    17% · council 13%
    Households with 2+ cars
    33% · council 19%
    Work mainly from home
    17% · council 12%
    This small area (220 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268060014

    Bus
    50 m
    Griffith Lawns · N2 · busiest stop within 500 m: 21 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    343 m
    Scoil Chaitriona, 523 pupils
    Homes sold nearby
    48
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil Chaitriona · postprimary · 523 pupils · 343 m
    • Corpus Christi NS · primary · 398 pupils · 345 m
    • Scoil Mobhi · primary · 248 pupils · 485 m
    • St Michaels Hse Spec Sc · primary · 64 pupils · 512 m
    • Gaelscoil Áine · primary · 176 pupils · 535 m
    • Glasnevin Educate Together NS · primary · 410 pupils · 612 m
    • Glasnevin NS · primary · 83 pupils · 720 m
    • North Dublin Ns Project · primary · 214 pupils · 729 m

    Stops 49

    • Griffith Lawns · N2 · 4/hour at peak · 50 m
    • Lambay Road · N2 · 4/hour at peak · 105 m
    • Walnut Rise · N2 · 4/hour at peak · 174 m
    • Walnut Rise · N2 · 4/hour at peak · 184 m
    • Home Farm Road · 19 · 5/hour at peak · 235 m
    • Walsh Road · 19 · 3/hour at peak · 258 m
    • Rathlin Road · 19 · 3/hour at peak · 280 m
    • Stella Avenue · 19, E1, E2 · 21/hour at peak · 304 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Chaitriona · 343 m0% pupils (523)
    • Corpus Christi NS · 345 m-1% pupils (398) · 2 classrooms 2025, approved
    • Scoil Mobhi · 485 m-1.6% pupils (248)
    • St Michaels Hse Spec Sc · 512 m+10.3% pupils (64) · an extension 2023, approved
    • Gaelscoil Áine · 535 m+23.9% pupils (176)
    • Glasnevin Educate Together NS · 612 m-0.5% pupils (410)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.39 ha · 60 m
    • Dublin City Council · 0.36 ha · 196 m
    • The Office of Public Works · 3.27 ha · 283 m
    • Dublin City Council · 0.28 ha · 355 m
    • The Office of Public Works · 3.44 ha · 446 m
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
    SourceLicenceFetchedLink
    gtfsCC-BY-4.011 Oct 2026, 23:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.012 Oct 2026, 01:44open
    consultpublic12 Oct 2026, 01:26open
    moderngovpublic12 Oct 2026, 01:27open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Work already done (WEB1395/21): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. A rear extension 83 m away was refused in 2026: could yours be?
      Ask for: The refusal reasons on the council's file for WEB5635/25.
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Drumcondra South C
    Electoral area
    Cabra-Glasnevin
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest WEB1395/21, approved 2021, work already done.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 2 sites nearby could change: 2 derelict.
    • 1 application refused within 100 m since 2025; latest a rear extension (2026).
    • The Rise (bus 19, 70D) 486 m away: 21 an hour at morning peak; 134 from all stops within 500 m.
    • Here (2022 census): 92% owner-occupied (council 47%); 9% of homes empty (council 8%); most built 1919–1945; 39% drive to work (council 28%); population down 5% since 2016.
    • 5 home extensions within 250 m since 2025. Most were rear extensions. 1 rear extension refused.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.011 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public12 Oct 2026
    www2.courts.ie—all-rights-reserved12 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC-BY-4.05 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public12 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.012 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…12 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 12 Oct 2026, 11:56 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.