Planning report · Dublin City Council · 500 m around the house · the last 12 months · 21 Oct 2026, 01:46

Brookwood Park

53.37814, -6.19938

Homes here mostly date from the 1950s. 1 planning file on this house, the latest from 2020. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 1 planning file on this house, the latest from 2021.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 1 planning file on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Brookwood ParkBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2021: 3920/20 · demolition, approved2019: 1 file on Brookwood Park2020: 2 files on Brookwood Park2021: 1 file on Brookwood Park2023: 1 file on Brookwood Park2026: 2 files on Brookwood Park7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    3920/20 · demolition · approved 2021 · built, signed off
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings7post box; St Brigid's Church
Radon grid squares2
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 96–100% by type. A new house in a garden is harder: 80% approved, and 1 in 3 is asked for more information.

Single-storey rear129 decided · more info asked 13%
99% · council 97%
Two-storey rear75 decided · more info asked 24%
99% · council 96%
Two-storey side39 decided · more info asked 10%
100% · council 98%
Single-storey side25 decided · more info asked 12%
100% · council 99%
Attic or dormer366 decided · more info asked 11%
98% · council 96%
First-floor52 decided · more info asked 21%
96% · council 93%
Garage conversion56 decided · more info asked 16%
100% · council 99%
Porch or front19 decided · more info asked 11%
100% · council 97%
New house in a garden or site56 decided · more info asked 29%
80% · council 72%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 817 nearby, 7,952 council-wide

Figure 3

Brookwood Park, file by file since 2019

4 of 4 decided extensions on the road were approved.

7 planning files on Brookwood Park since 2019, by kind and decision.20192020202120222023202420252026Extensions, atticsNo. 14 · 2019 · attic conversion / dormer · approved · 4042/19No. 5 · 2020 · attic conversion / dormer · approved · WEB1893/20No. 10 · 2021 · garage conversion · approved · WEB5009/21No. 45 · 2023 · garage conversion · approved · WEB2066/23Porches, roofs, otherNo. 1A · 2020 · other work · approved · 3920/20No. 1 · 2026 · other work · withdrawn or invalid · WEB1957/26No. 1 · 2026 · other work · refused · WEB2039/26New house in a side garden
ApprovedRefusedWithdrawn or invalid

7 files with "Brookwood Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2019–2026

Extensions and refusals right beside you 2 within 250 m · 1 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Porch11—
Two-storey rear10—

Refused within 100 m 1 in the last 12 months

  • WEB2039/26 · the development will · refused 23 Jun 2026 · 20 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 55 days. 1 in 7 is asked for more information, which adds about 62 days. Building starts about 5 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 124 days; Appeal window: 4 weeks; If appealed: +131 days; Building starts: 154 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=728)55 daysIf more info asked (1 in 7)With further information: median 124 days (n=116)124 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 131 days (n=122, all appeals within 1.5 km)+131 daysBuilding startsStart notice: median 154 days after permission (n=412)154 days after permissionSigned off356 days after the start, for the few who file. 50% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated844 decided home extensions, 414 start notices, 122 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

13 of 36 appealed refusals became permissions. 4 of 89 appealed approvals were reversed.

Refusals appealed36 decided
13 became permissions
Approvals appealed89 decided
4 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Question 4

What's changing around you?

Street map around Brookwood Park with 15 numbered planning items
⌖ the houseRefusedBuilding startedNo decision yetApproved
  1. 11, Brookwood Park WEB2039/26Refused · 20 m
  2. 2100 Abbeyfield, Dublin 5 CN0147936DCBuilding started · 170 m
  3. 3119, Brookwood Avenue WEB1595/26No decision yet · 112 m
  4. 498 Brookwood Avenue, Artane 5057/26Approved · 116 m
  5. 564 Brookwood Avenue, Dublin 5 WEB1047/26Approved · 165 m
  6. 625, Gracefield Avenue WEB2645/26No decision yet · 307 m
  7. 712 Brookwood Lawn, Dublin 5 5155/26No decision yet · 323 m
  8. 820 Abbeyfield, Killester WEB1253/26Approved · 345 m
  9. 913 St. Brigid's Road, Dublin 5 5053/26Approved · 390 m
  10. 1020, Brookwood Avenue WEB1495/26Approved · 403 m
  11. 11120 Ennafort Road, Dublin 5 WEB1003/26Approved · 405 m
  12. 121, School Avenue WEB2116/26Approved · 409 m
  13. 13265, Howth Road WEB2158/26Approved · 416 m
  14. 14326, Howth Road WEB1927/26Approved · 423 m
  15. 1519, The Orchard WEB1257/26No decision yet · 430 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 178 permissions since 2016, 81 show a start notice and 6 have a completion certificate.

211 applications lodged within 500 m. Council: 180 approved, 10 refused. After appeals: 178 approved. Of those: 6 signed off, 34 built with the owner's opt-out, 41 started, 97 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT180: lodged → approved10: lodged → refused17: lodged → withdrawn or invalid4: lodged → undecided176: approved → approved8: refused → refused17: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal97: approved → no start notice found34: approved → built, owner opted out41: approved → started, not signed off6: approved → signed off211 lodged211 lodged180 approved180 approved10 refused10 refused17 withdrawn or invalid17 withdrawn or invalid4 undecided4 undecided178 approved178 approved9 refused9 refused19 withdrawn19 withdrawn5 undecided5 undecided97 no start notice found97 no start notice found34 built, owner opted out34 built, owner opted out41 started, not signed off41 started, not signed off6 signed off6 signed off

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured211 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

Nothing closes within 500 m in the next 30 days.

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 21 and 31 a year; busiest 2022. 95% of decisions were approvals.

    2019: 25, 2020: 29, 2021: 21, 2022: 31, 2023: 28, 2024: 24, 2025: 30, 2026: 230102030402019: 24 approved2019: 1 refused25’19*2020: 29 approved29’202021: 20 approved2021: 1 refused21’212022: 28 approved2022: 2 refused2022: 1 withdrawn or invalid31’222023: 23 approved2023: 3 refused2023: 1 withdrawn or invalid2023: 1 undecided28’232024: 22 approved2024: 1 refused2024: 1 withdrawn or invalid24’242025: 23 approved2025: 1 refused2025: 6 withdrawn or invalid30’252026: 11 approved2026: 1 refused2026: 8 withdrawn or invalid2026: 3 undecided23’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2019 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 24 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Building work nearby 15 in the last 12 months
    3 not signed off12 no sign-off needed
    • 12 Brookwood Lawn, Dublin 5, D05 AW98 · 19 Oct 2026 · start notice, opted out no sign-off needed · 5155/26 · 334 m
    • 2100 Abbeyfield, Dublin 5 · 28 Sept 2026 · 1 homes · start notice not signed off · 170 m
    • 1 School Avenue, Dublin 5, D05 V9H9 · 20 Aug 2026 · short notice no sign-off needed · WEB2116/26 · 425 m
    • 55 Ennafort Road, Dublin 5, D05 XE40 · 5 Aug 2026 · short notice no sign-off needed · WEB2877/25 · 483 m
    • 59 Ennafort Road, Dublin 5, D05 XF29 · 20 Jul 2026 · short notice no sign-off needed · WEB5456 · 494 m
    • 117 Killester Park, Dublin 5, Dublin, D05 E3F6 · 11 Jun 2026 · start notice, opted out no sign-off needed · WEB1812/23 & WEB2175/25 · 467 m
    • 46 Brookwood Heights, Artane, Dublin 5, D05 TK49 · 28 Apr 2026 · short notice no sign-off needed · WEB1022/25 · 385 m
    • 9 Gracefield Avenue, Donaghmede, Dublin 5, Dublin 5, D05 NW82 · 2 Mar 2026 · start notice, opted out no sign-off needed · 3398/25 & 4320/24 · 308 m
    • 1 Saint Brigid's Road, Killester, Dublin 5, D05 T6N6 · 4 Feb 2026 · start notice, opted out no sign-off needed · WEB5371/25 · 341 m
    • 10 Brookwood Lawn, Artane Dublin 5, Dublin 5, D05 PW63 · 2 Feb 2026 · start notice, opted out no sign-off needed · WEB1986/24 · 309 m
    • 88 Brookwood Avenue, Dublin, Dublin 5, D05 FN50 · 20 Jan 2026 · 7-day notice not signed off · WEB2416/25 · 71 m
    • 125 Abbeyfield, Dublin, Dublin 5 · 4 Dec 2025 · start notice, opted out no sign-off needed · WEB1796/25 · 301 m
    • 105 Abbeyfield, Killester, Dublin 5, D05 T8K6 · 25 Nov 2025 · start notice, opted out no sign-off needed · WEB2034/25 · 229 m
    • 1 Saint Brigid's Road, Killester, Dublin 5, D05 T6N6 · 21 Nov 2025 · 3 homes · start notice not signed off · WEB2007/25 · 341 m
    • 86 Killester Park, Dublin 5, D05 E9H6 · 27 Oct 2025 · start notice, opted out no sign-off needed · WEB1961/25 · 437 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    144 Harmonstown Road43no activity on site reported (2026-Q2)657 m
    63-67A Collins Avenue East6767 built (2025-Q1)902 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Magic Little Kids Limited · Crèche10 Jul 2025 · report · Tusla Early Years Inspectorate212 m
    St. Brigid's Playgroup · Crèche6 Jun 2024 · report · Tusla Early Years Inspectorate418 m
    Karaville Childcare · Crèche14 Feb 2024 · report · Tusla Early Years Inspectorate431 m
    Naíonra Neasáin · Crèche11 Feb 2025 · report · Tusla Early Years Inspectorate485 m
    Best Start Childcare Killester · Crèche17 Jun 2025 · report · Tusla Early Years Inspectorate539 m
    Kids World · Crèche11 Jun 2025 · report · Tusla Early Years Inspectorate672 m
    Little Rainbows Limited · Crèche14 Aug 2025 · report · Tusla Early Years Inspectorate985 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Quieter than most of Dublin City Council.
    Homes approved
    Here0
    Council middle64
    Homes started
    Here16
    Council middle118
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    76% of homes built before 1971 (council 52%). 86% owner-occupied (council 47%).

    Homes built before 1971
    76% · council 52%
    Homes built since 2001
    7% · council 19%
    Owner-occupied
    86% · council 47%
    Rented
    13% · council 45%
    Children under 15
    18% · council 15%
    Aged 65 and over
    21% · council 13%
    Households with 2+ cars
    40% · council 19%
    Work mainly from home
    21% · council 12%
    This small area (291 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268046011

    Bus
    379 m
    St Brigid's Church · 29n, 6, H1 · busiest stop within 500 m: 10 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    203 m
    St Marys Secondary School, 320 pupils
    Homes sold nearby
    740
    in 3 years, 19 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Marys Secondary School · postprimary · 320 pupils · 203 m
    • St Brigids Convent NS · primary · 369 pupils · 425 m
    • St Brigids Boys NS · primary · 287 pupils · 455 m
    • Scoil Neasain · primary · 241 pupils · 485 m
    • St Pauls College · postprimary · 650 pupils · 690 m
    • Scoil Bhreandain · primary · 136 pupils · 716 m
    • Sn Caitriona Girls · primary · 185 pupils · 767 m
    • S N Caitriona Naionain · primary · 178 pupils · 776 m

    Stops 49

    • St Brigid's Church · 29n, 6, H1, H2, H3 · 9/hour at peak · 379 m
    • St Brigid's Church · 6, H1, H2, H3 · 10/hour at peak · 395 m
    • Mask Crescent · 27A · 2/hour at peak · 464 m
    • The Meadows · 29n, 6, H1, H2, H3 · 9/hour at peak · 471 m
    • Mask Crescent · 27A · 2/hour at peak · 480 m
    • The Meadows · 6, H1, H2, H3 · 10/hour at peak · 482 m
    • Gracefield Rd · 27A · 2/hour at peak · 511 m
    • Gracefield Rd · 27A · 2/hour at peak · 531 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Marys Secondary School · 203 m+0.3% pupils (320)
    • St Brigids Convent NS · 425 m-3.7% pupils (369)
    • St Brigids Boys NS · 455 m-1.7% pupils (287)
    • Scoil Neasain · 485 m-1.6% pupils (241)
    • St Pauls College · 690 m+2% pupils (650) · a sports hall 2025, approved
    • Scoil Bhreandain · 716 m-4.9% pupils (136)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.53 ha · 329 m
    • Dublin City Council · 0.24 ha · 361 m
    • Dublin City Council · 0.2 ha · 363 m
    • Dublin City Council · 0.23 ha · 366 m
    • Dublin City Council · 0.82 ha · 394 m
    • An Post · 0.16 ha · 401 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 21 Oct 2026, 01:42
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Council consultation portalsPublic21 Oct 2026, 01:42open
    Council meetings (ModernGov)Public20 Oct 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Clontarf West A
    Electoral area
    Clontarf
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 3920/20, approved 2021, built, signed off.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application refused within 100 m since 2025; latest for the development will (2026).
    • St Brigid's Church (bus 6, H1) 395 m away: 10 an hour at morning peak; 41 from all stops within 500 m.
    • Here (2022 census): 86% owner-occupied (council 47%); 5% of homes empty (council 8%); most built 1946–1960; 44% drive to work (council 28%); population up 3% since 2016.
    • 2 home extensions within 250 m since 2026.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 7 is asked for more information.
    What the terms mean 5 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public21 Oct 2026
    www2.courts.ie—© the publisher21 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence21 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 21 Oct 2026, 01:46 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.