- 8 Rathlin Road, Dublin 9, D09RY80 Registered Application
The development will consist of the creation a new vehicular entrance, driveway, dished footpath, landscaping and all associated works at 8 Rathlin Road, Drumcondra, Dublin 9, D09RY80.
WEB2564/26received 24 Jun 2026456 m away
- 8, Rathlin Road, Dublin 9 Application declared invalid
The development will consist of the creation of a new vehicular entrance and driveway, dished footpath, landscaping and all associated works at 8 Rathlin Road, Drumcondra, Dublin 9, D09RY80.
WEB2525/26received 18 Jun 2026decided 19 Jun 2026456 m away
- Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven) Additional information
PROTECTED STRUCTURE: Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699).
The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 22 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections.
A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
WEB2324/26received 2 Jun 2026decided 24 Jul 202630 units430 m away
- 4, The Rise, Whitehall, Dublin 9 Grant permission
The construction of a new flat roof single storey kitchen extension to the rear, including associated internal alterations, hard and soft landscaping and associated site works.
WEB2092/26received 5 May 2026decided 29 Jun 2026172 m away
- Lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven) Application declared invalid
PROTECTED STRUCTURE : Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699).
The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 22 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections.
A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
WEB1836/26received 13 Apr 2026decided 19 May 202630 units430 m away
- Balnagowan House, St Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven) Application declared invalid
-PROTECTED STRUCTURE Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699). The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 22 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
WEB1774/26received 2 Apr 2026decided 9 Apr 2026430 m away
- Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven) Application declared invalid
PROTECTED STRUCTURE: Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699). The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 20 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
WEB1738/26received 31 Mar 2026decided 1 Apr 2026430 m away
- National Tennis Centre, Albert College Park, Glasnevin, Dublin 9, D09K6PT Application declared invalid
Development to permanently extend and upgrade the existing planning permission reference no. 1674/08 (which permits a “Seasonal” Sports Air Dome covering 3 no. Tennis Courts) to permission for development for an “All Season” Sports Air Dome to permanently cover the same 3 no. existing tennis courts (currently covered to date on a seasonal basis) for indoor play utilising the same Sports Air Dome structure that currently exists on site and all associated works.
WEB1668/26received 23 Mar 2026decided 24 Mar 202672 m away
- 86, Ballymun Road, Dublin 9 Grant permission
Alterations to an existing two storey semi-detached 4-bedroom dwelling. The alterations consist of conversion of the existing attic space at roof level to a bedroom with ensuite and storage area. The conversion to include a dormer extension to the side and rear of the existing roof, a new rooflight to the existing roof and a new stair to access the converted attic space together with all associated site works, giving a 5-bedroom semi-detached house
WEB1606/26received 15 Mar 2026decided 7 May 2026131 m away
- 32 The Rise, Glasnevin, Dublin 9, D09 H2H9 Grant permission
Planning permission for alterations to previous planning 3736/24. Alterations being the erection of a flat roof, part single storey, part two storey extension to rear of existing dwelling, being a revision to that previously granted which was a pitched roof single storey and dormer style two storey extension and associated site works.
WEB5935/25received 11 Dec 2025decided 12 Feb 202634 m away