PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 17:27

Wellmount Road

53.38347, -6.30856

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (96%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Wellmount RoadBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2022: 1 file on Wellmount Road2024: 1 file on Wellmount Road2026: 1 file on Wellmount Road3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Toruro Enterprises Limited (807 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares2
Monuments1R149689
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 71% approved, and 1 in 2 are asked for more information.

Single-storey rear26 decided · more info asked 15%
96% · council 97%
Two-storey rear15 decided · more info asked 13%
93% · council 96%
Two-storey side10 decided · more info asked 40%
100% · council 98%
Attic or dormer74 decided · more info asked 11%
96% · council 96%
New house in a garden or site14 decided · more info asked 50%
71% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 139 nearby, 4,865 council-wide

Figure 3

Wellmount Road, file by file since 2022

2 of 2 decided extensions on the road were approved.

3 planning files on Wellmount Road since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 12 · 2022 · attic conversion / dormer · approved · WEB1093/22No. 7 · 2024 · attic conversion / dormer · approved · WEB1465/24Porches, roofs, otherNo number · 2026 · other work · approved · WEB3144/26New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Wellmount Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 63 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 118 days; Appeal window: 4 weeks; If appealed: +175 days; Building starts: 111 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=144)55 daysIf more info asked (1 in 6)With further information: median 118 days (n=31)118 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 175 days (n=25, all appeals within 1.5 km)+175 daysBuilding startsStart notice: median 111 days after permission (n=57)111 days after permissionSigned off40% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated176 decided home extensions, 58 start notices, 25 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    6 of 14 appealed refusals became permissions. 0 of 11 appealed approvals were reversed.

    Refusals appealed14 decided
    6 became permissions
    Approvals appealed11 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Wellmount Road with 4 numbered planning items
    ⌖ the houseApproved
    1. 111, Dunsink Drive WEB1810/26Approved · 46 m
    2. 247, Dunsink Gardens WEB5892/25Approved · 272 m
    3. 394 Dunsink Drive, Finglas West WEB5808/25Approved · 277 m
    4. 426, Wellmount Court WEB1486/26Approved · 314 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 34 permissions since 2016, 9 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    48 applications lodged within 500 m. Council: 34 approved, 5 refused. After appeals: 34 approved. Of those: 0 signed off, 6 built with the owner's opt-out, 3 started, 25 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT34: lodged → approved5: lodged → refused9: lodged → withdrawn or invalid33: approved → approved4: refused → refused9: withdrawn or invalid → withdrawn1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal25: approved → no start notice found6: approved → built, owner opted out3: approved → started, not signed off48 lodged48 lodged34 approved34 approved5 refused5 refused9 withdrawn or invalid9 withdrawn or invalid34 approved34 approved4 refused4 refused10 withdrawn10 withdrawn25 no start notice found25 no start notice found6 built, owner opted out6 built, owner opted out3 started, not signed off3 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured48 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      DART+ West is planned 981 m away.

      DART+ West, Pelletstown: railway order granted (July 2024); DART+ West, DART+ West:…: railway order granted (July 2024)20242025202620272028DART+ West, Pelletstown981 m · plannedrailway order granted (July 2024)DART+ West, DART+ West:…982 m · plannedrailway order granted (July 2024)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Figure 9

      Applications within 500 m, by year

      Between 5 and 14 a year; busiest 2025. 87% of decisions were approvals.

      2021: 7, 2022: 5, 2023: 9, 2024: 9, 2025: 14, 2026: 4051015202021: 6 approved2021: 1 refused7’21*2022: 4 approved2022: 1 refused5’222023: 8 approved2023: 1 refused9’232024: 7 approved2024: 2 refused9’242025: 7 approved2025: 7 withdrawn or invalid14’252026: 2 approved2026: 2 withdrawn or invalid4’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 3 in the last 12 months
      1 not signed off2 no sign-off needed
      • Glenties Park, Dublin, Dublin 11 · 6 Aug 2026 · 7-day notice not signed off · WEB2622/25 · 358 m
      • 20 Dunsink Road, Dublin, Dublin 11, D11 AKP3 · 8 Jun 2026 · start notice, opted out no sign-off needed · WEB5084/21 · 339 m
      • 72A Cardiffsbridge Road, Knockatee, Dublin 11, D11 R598 · 24 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · WEB2826/25 · 453 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 0 not started
      • Ratoath Avenue, Finglas South, Dublin 11 · Completed · 1 homes · 70 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Former Church of the Annunciation3636 not started (2026-Q2)573 m
      Meridian Court2929 being built (2026-Q2)735 m
      The Bottom of the Hill Bar4848 not started (2026-Q2)865 m
      The Drake Inn2525 not started (2026-Q2)896 m
      Raven House3737 being built (2026-Q2)953 m
      Tolka Industrial Park71—956 m
      Former Premier Dairies Site200200 built (2026-Q1)996 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      St Helena's Resource Centre · Crèche12 Dec 2024 · report · Tusla Early Years Inspectorate511 m
      St. Helena's Childcare Centre · Crèche20 Feb 2025 · report · Tusla Early Years Inspectorate526 m
      Blooming Lillies Early Education Centre Ltd · Crèche19 May 2026 · report · Tusla Early Years Inspectorate588 m
      Barnardos-Finglas Early Intervention Service · Crèche8 Oct 2025 · report · Tusla Early Years Inspectorate628 m
      Oak Tree Creche · Crèche13 Nov 2025 · report · Tusla Early Years Inspectorate695 m
      Discovery Queen B’s Creche & Montessori · Crèche20 Jan 2026 · report · Tusla Early Years Inspectorate749 m
      Queen B's Creche, Montessori and Afterschool · Crèche24 Apr 2025 · report · Tusla Early Years Inspectorate849 m
      Axis Centre · Crèche19 Nov 2025 · report · Tusla Early Years Inspectorate929 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Quieter than most of Dublin City Council.
      Homes approved
      Here65
      Council middle50
      Homes started
      Here42
      Council middle110
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      73% of homes built before 1971 (council 52%). 55% owner-occupied (council 47%).

      Homes built before 1971
      73% · council 52%
      Homes built since 2001
      12% · council 19%
      Owner-occupied
      55% · council 47%
      Rented
      32% · council 45%
      Children under 15
      16% · council 15%
      Aged 65 and over
      14% · council 13%
      Households with 2+ cars
      19% · council 19%
      Work mainly from home
      3% · council 12%
      This small area (292 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268068006

      Bus
      215 m
      Wellmount Dr · 220, 220A, 88n · busiest stop within 500 m: 6 an hour at peak
      Planned
      981 m
      DART+ West, Pelletstown
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      303 m
      St Brigids Infant NS, 140 pupils
      Homes sold nearby
      23
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • St Brigids Infant NS · primary · 140 pupils · 303 m
      • St Brigids Senior Girls · primary · 137 pupils · 331 m
      • S N Naomh Finnin · primary · 266 pupils · 396 m
      • S N Naomh Feargal Boys Senior · primary · 180 pupils · 476 m
      • Coláiste Eoin · postprimary · 257 pupils · 512 m
      • St Malachys Ns · primary · 131 pupils · 595 m
      • St Oliver Plunkett NS · primary · 110 pupils · 612 m
      • St Michaels Secondary School · postprimary · 646 pupils · 621 m

      Stops 59

      • Wellmount Dr · 220, 220A, 88n, F3 · 5/hour at peak · 215 m
      • Glenties Pk · 220, 220A, 88n, F3 · 5/hour at peak · 251 m
      • Wellmount Dr · 220, 220A, 40E, F3 · 6/hour at peak · 267 m
      • Deanstown Avenue · 220, 220A, 40E · 4/hour at peak · 280 m
      • Glenties Pk · 220, 220A, F3 · 5/hour at peak · 322 m
      • Valeview Gdns · 220, 220A, F3 · 4/hour at peak · 339 m
      • Berryfield Rd · 220, 220A, 88n, F3 · 5/hour at peak · 372 m
      • Cardiffsbridge SC · 220, 220A, 40E, F3 · 6/hour at peak · 372 m

      Schools growing or shrinking planning in 3 years · pupils last year

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.55 ha · 227 m
      • City of Dublin Education and Training Board · 0.24 ha · 320 m
      • Dublin City Council · 0.25 ha · 325 m
      • Dublin City Council · 4.43 ha · 347 m
      • Dublin City Council · 0.93 ha · 361 m
      • City of Dublin Education and Training Board · 2.89 ha · 401 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Finglas South C
      Electoral area
      Ballymun-Finglas
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • Coláiste Íde (bus 220, 220A) 434 m away: 7 an hour at morning peak; 70 from all stops within 500 m. Planned: DART+ West Pelletstown 981 m away, railway order granted (July 2024).
      • Here (2022 census): 55% owner-occupied (council 47%); 9% of homes empty (council 8%); most built 1946–1960; 47% drive to work (council 28%); population down 3% since 2016.
      • 1 home extension within 250 m since 2026.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • 6 applications nearby in the last 12 months.
      • St Brigids Infant NS, 303 m away: a new school building approved (2024). Pupils down 10% last year.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 29
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 17:27 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.