Castleway, Kinsaley

53.43826, -6.16342

Homes here mostly date from after 2016. Home extensions nearby almost always get approved (90%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built after 2016, with building records online.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2016–2021.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of MalahideBuilt: most homes in this small area date from 2016–2021 (census estimate)most built2021: 25 files on Malahide2022: 4 files on Malahide2023: 10 files on Malahide2024: 3 files on Malahide2025: 12 files on Malahide2026: 12 files on Malahide66 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R1
Zoning · New residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RA - Residential Area: Ensure the provision of high quality new residential environments with good layout and design, with adequate public transport and cycle links and within walking distance of community facilities. Provide an appropriate mix of house sizes, types and tenures in order to meet household needs and to promote balanced communities.

ZoningR1 · New residential
What it says

RA - Residential Area: Provide for new residential communities subject to the provision of the necessary social and physical infrastructure

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas1Malahide Castle Demesne ACA
Heritage inventory buildings1Malahide Castle
Radon grid squares3
Monuments4Enclosure; R171335
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 13 on the draft 2027 map; 13 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 68% approved, and 1 in 3 is asked for more information.

Single-storey rear32 decided · more info asked 3%
91% · council 92%
Single-storey side11 decided · more info asked 0%
100% · council 93%
Attic or dormer56 decided · more info asked 5%
93% · council 92%
Porch or front11 decided · more info asked 9%
100% · council 94%
New house in a garden or site31 decided · more info asked 39%
68% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 141 nearby, 2,443 council-wide

Figure 3

Malahide, file by file since 2021

24 of 25 decided extensions on the road were approved. New houses in side gardens or on sites: 0 of 2.

66 planning files on Malahide since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 1 · 2021 · first-floor · approved · F20B/0325No number · 2021 · attic conversion / dormer · approved · F21A/0038No. 72 · 2021 · attic conversion / dormer · approved · F21A/0223No. 27 · 2021 · attic conversion / dormer · approved · F21A/0531No. 26 · 2021 · attic conversion / dormer · approved · F21A/0532No. 80 · 2021 · attic conversion / dormer · approved · F21A/0533No. 25 · 2021 · attic conversion / dormer · approved · F21A/0534No. 24 · 2021 · attic conversion / dormer · approved · F21A/0535No. 28 · 2021 · attic conversion / dormer · approved · F21A/0536No. 29 · 2021 · attic conversion / dormer · approved · F21A/0537No. 81 · 2021 · attic conversion / dormer · approved · F21A/0538No. 35 · 2021 · single-storey side · approved · F21B/0227No. 3 · 2021 · attic conversion / dormer · approved · F21B/0301No. 32 · 2021 · single-storey rear · approved · F21B/0357No number · 2022 · other extension · refused · F22A/0711No number · 2023 · attic conversion / dormer · approved · F23A/0079No number · 2023 · attic conversion / dormer · approved · F23A/0356No. 30 · 2023 · other extension · approved · F23A/0482No. 6 · 2023 · attic conversion / dormer · approved · F23A/0595No. 7 · 2023 · attic conversion / dormer · approved · F23B/0069No. 7 · 2023 · attic conversion / dormer · approved · F23B/0070No number · 2024 · other extension · approved · F24A/0128No. 9A · 2025 · rear · approved · F25A/0040No. 2 · 2025 · single-storey rear · withdrawn or invalid · F25A/0841ENo. 2 · 2025 · single-storey rear · withdrawn or invalid · F25A/0865ENo number · 2025 · attic conversion / dormer · withdrawn or invalid · F25A/0924ENo number · 2026 · rear · approved · F26A/0146ENo number · 2026 · other extension · approved · F26A/0323ENo number · 2026 · attic conversion / dormer · undecided · F26A/0795ENo. 35 · 2026 · single-storey side · undecided · F26A/0829ENo. 35 · 2026 · single-storey side · undecided · F26A/0903Porches, roofs, otherNo number · 2021 · other work · approved · F20A/0507No number · 2021 · other work · approved · F21A/0007No number · 2021 · other work · refused · F21A/0072No. 81 · 2021 · other work · approved · F21A/0125No number · 2021 · other work · approved · F21A/0165No. 30 · 2021 · other work · approved · F21A/0338No. 38 · 2021 · other work · approved · F21A/0349No number · 2021 · other work · approved · F21A/0391No number · 2021 · other work · approved · F21A/0451No. 40 · 2021 · other work · approved · F21A/0671No number · 2022 · other work · approved · F21A/0475No number · 2022 · other work · refused · F22A/0105No. 9 · 2022 · other work · approved · F22A/0199No number · 2023 · other work · approved · F22A/0579No number · 2023 · other work · approved · F22A/0622No number · 2023 · other work · approved · F23A/0329No. 7 · 2023 · other work · approved · F23A/0428No number · 2024 · other work · approved · F24A/0115No. 8 · 2024 · other work · approved · F24A/0541ENo. 9A · 2025 · other work · approved · F25A/0004No. 10 · 2025 · other work · approved · F25A/0299No. 2 · 2025 · other work · approved · F25A/0305ENo number · 2025 · other work · withdrawn or invalid · F25A/0794ENo number · 2025 · other work · refused · F25A/0814ENo number · 2025 · other work · withdrawn or invalid · F25A/0863ENo number · 2025 · other work · refused · F25A/0943ENo. 3 · 2026 · other work · approved · F26A/0332No. 2 · 2026 · other work · undecided · F26A/0710ENo number · 2026 · other work · undecided · F26A/0719ENo number · 2026 · other work · withdrawn or invalid · F26A/0755ENo number · 2026 · other work · undecided · F26A/0770ENo. 33 · 2026 · other work · undecided · F26A/0833ENo number · 2026 · other work · undecided · F26A/0860ENew house in a side gardenNo number · 2021 · new house · refused · F21A/0092No number · 2025 · new house · refused · F25A/0691E
ApprovedRefusedWithdrawn or invalid

66 files with "Malahide" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

3 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey side20—
Dormer or attic10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 49 days. 1 in 9 is asked for more information, which adds about 94 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 9): 160 days; Appeal window: 4 weeks; If appealed: +130 days; Building starts: 138 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 47–53 (n=167)49 daysIf more info asked (1 in 9)With further information: median 160 days (n=8)160 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 130 days (n=42, all appeals within 1.5 km)+130 daysBuilding startsStart notice: median 138 days after permission (n=78)138 days after permissionSigned off61% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated187 decided home extensions, 80 start notices, 42 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    11 of 23 appealed refusals became permissions. 1 of 23 appealed approvals were reversed.

    Refusals appealed23 decided
    11 became permissions
    Approvals appealed23 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 5 in the last 12 months

    1 of 3 changed the council's decision

    • 502185 Pending · Lands to the North of Brookdale (K36 YK19) and Rear of Kinsealy Lane,… · 436 m
    • 501766 Pending · lands at Auburn House (Protected Structure), Little Auburn and… · 194 m
    • 500685 Refused · Lands at Auburn House (Protected Structure) and Little Auburn off the… · 194 m report
    • 500998 Granted with conditions · Lands at Auburn House (Protected Structure) and Little Auburn off the… · 194 m report
    • 500610 Refused · Albatros, Kinsealy Lane, Kinsealy, Malahide, Co. Dublin, K36 AW22 · 276 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 4

    What's changing around you?

    Street map around Castleway, Kinsaley with 15 numbered planning items
    ⌖ the houseOpen for commentsRefusedAppealEmpty land zoned for homesBuilding startedApprovedNo decision yetOther
    1. 135, Ashwood Hall F26A/0903No decision yet · 137 m
    2. 2Lands to the south of Back Road and to the east of Kinsealy Lane, Broo F25A/1206ERefused · 175 m
    3. 3lands at Auburn House (Protected Structure), Little Auburn and Streamstown off the R107 Malahide Road/Dublin Road and Carey's Lane (accessed via Streamstown Lane) 501766Appeal: no decision yet · 194 m
    4. 4Lands at Auburn House (Protected Structure) and Little Auburn off the R107 Malahide Road/Dublin Road, Malahide 500685Appeal: refused · 194 m
    5. 51.0 ha zoned for homesEmpty land zoned for homes · 30 m
    6. 60.9 ha zoned for homesEmpty land zoned for homes · 77 m
    7. 71.1 ha zoned for homesEmpty land zoned for homes · 88 m
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 98 m
    9. 93 Back Road, Malahide F26A/0332Building started · 128 m
    10. 100.4 ha zoned for homesEmpty land zoned for homes · 138 m
    11. 112.0 ha zoned for homesEmpty land zoned for homes · 139 m
    12. 12Site to the Rear of Shadow Glen, 3 Back Road F26A/0332Approved · 40 m
    13. 1333 Ashwood Hall, Malahide F26A/0833ENo decision yet · 114 m
    14. 1435 Ashwood Hall, Back Road F26A/0829EOther decision · 137 m
    15. 15An Grianan, Kinsealy Lane F26A/0795ENo decision yet · 208 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 57 permissions since 2016, 18 show a start notice and 3 have a completion certificate.

    87 applications lodged within 500 m. Council: 60 approved, 10 refused. After appeals: 57 approved. Of those: 3 signed off, 5 built with the owner's opt-out, 10 started, 38 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT60: lodged → approved10: lodged → refused10: lodged → withdrawn or invalid7: lodged → undecided56: approved → approved9: refused → refused10: withdrawn or invalid → withdrawn7: undecided → undecided2 approved by the council, undecided after an appeal2 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal38: approved → no start notice found5: approved → built, owner opted out10: approved → started, not signed off3: approved → signed off1: approved → ran out87 lodged87 lodged60 approved60 approved10 refused10 refused10 withdrawn or invalid10 withdrawn or invalid7 undecided7 undecided57 approved57 approved9 refused9 refused12 withdrawn12 withdrawn9 undecided9 undecided38 no start notice found38 no start notice found5 built, owner opted out5 built, owner opted out10 started, not signed off10 started, not signed off3 signed off3 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured87 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 9 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-09 F26A/0903: application received — Planning permission sought for a single storey extension to side of residence together with all ancillary workstoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecF26A/0903: application received — Planning permission sought for a single storey extension to side of residence together with all ancillary works · 137 m away · 2026-11-09
    Comments close
    • Comments close 9 Nov 20268 days left
      1F26A/0903 · application received — Planning permission sought for a single storey extension to side of residence together with all…
      €20 to the council · 137 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 51.0 ha zoned for homes · no homes built on it yet · 30 m
    • 60.9 ha zoned for homes · no homes built on it yet · 77 m
    • 71.1 ha zoned for homes · no homes built on it yet · 88 m
    • 80.2 ha zoned for homes · no homes built on it yet · 98 m
    • 100.4 ha zoned for homes · no homes built on it yet · 138 m
    • 112.0 ha zoned for homes · no homes built on it yet · 139 m
    • 1.1 ha zoned for homes · no homes built on it yet · 151 m
    • 0.8 ha zoned for homes · no homes built on it yet · 161 m
    • 10.2 ha zoned for homes · no homes built on it yet · 162 m
    • 4.8 ha zoned for homes · no homes built on it yet · 0 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 5 and 19 a year; busiest 2025. 86% of decisions were approvals.

    2021: 30, 2022: 5, 2023: 9, 2024: 10, 2025: 19, 2026: 1401020302021: 29 approved2021: 1 refused30’21*2022: 2 approved2022: 2 refused2022: 1 withdrawn or invalid5’222023: 9 approved9’232024: 9 approved2024: 1 withdrawn or invalid10’242025: 7 approved2025: 5 refused2025: 7 withdrawn or invalid19’252026: 4 approved2026: 2 refused2026: 1 withdrawn or invalid2026: 7 undecided14’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 17 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 6 in the last 12 months
    3 not signed off3 no sign-off needed
    • Old Orchard Place, Malahide, Dublin · 16 Sept 2026 · 7-day notice not signed off · LRD0043/S3E · 359 m
    • 93 Back Road, Malahide, Dublin, K36 X599 · 10 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · F26A/0332 · 128 m
    • 3 Back Road, Malahide, Dublin · 10 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · F26A/0332 · 128 m
    • Back Road, Malahide, Fingal · 2 Jun 2026 · 120 homes · start notice not signed off · LRD0043/S3E · 463 m
    • 1-2 Old Orchard Drive, Malahide, Fingal · 29 May 2026 · 118 homes · start notice not signed off · LRD0043/S3E · 230 m
    • 9A Connolly Avenue, Malahide, Fingal, K36 W252 · 10 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · F25A/0040 · 401 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Back Road5646 built · 10 not started (2025-Q3)64 m
    Kinsealy Lane——93 m
    Back Road and Kinsealy Lane——93 m
    Auburn House6969 not started (2026-Q2)197 m
    Lands in the Townland of Kinsaley8383 not started (2026-Q2)202 m
    Including part of the grounds of Lamorlaye——202 m
    Mabestown4848 not started (2025-Q3)759 m
    Lands at Mabestown5240 being built · 12 not started (2026-Q2)759 m

    Who applies most nearby

    Crèches and schools inspected

    NameLatest inspectionDistance
    Purple Turtle Montessori · Crèche24 Jan 2024 · report · Tusla Early Years Inspectorate993 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Fingal County Council.
    Homes approved
    Here675
    Council middle0
    Homes started
    Here413
    Council middle4
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    86% owner-occupied (council 67%).

    Homes built before 1971
    11% · council 11%
    Homes built since 2001
    77% · council 43%
    Owner-occupied
    86% · council 67%
    Rented
    7% · council 28%
    Children under 15
    32% · council 22%
    Aged 65 and over
    6% · council 11%
    Households with 2+ cars
    66% · council 42%
    Work mainly from home
    30% · council 12%
    This small area (846 people)Fingal

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267099028/01

    Bus
    743 m
    Broomfield · 142, 42, 42D
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    726 m
    Malahide Community School, 1248 pupils
    Homes sold nearby
    10
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Malahide Community School · postprimary · 1248 pupils · 726 m

    Stops 14

    • Broomfield · 142, 42, 42D · 5/hour at peak · 743 m
    • Malahide Com School · 142, 42, 42D · 5/hour at peak · 755 m
    • Malahide Com School · 142, 42, 42D · 3/hour at peak · 766 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Malahide Community School · 726 m+0.2% pupils (1,248)

    Council meetings 30 items

    Public land

    • Fingal County Council · 1.83 ha · 201 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. Application 137 m away open for comments until 9 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Malahide
    Electoral division
    Kinsaley
    Electoral area
    Howth-Malahide
    Council
    Fingal County Council
    Everything we found, as a list 8 lines
    • Zoned R1 (new residential); not protected; on the vacant land tax map.
    • 10 sites nearby could change: 10 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 9 Nov 2026.
    • No morning-peak service within 500 m; nearest is Broomfield, 743 m away (5 an hour).
    • Inside Dublin Airport Noise Zone C.
    • Here (2022 census): 86% owner-occupied (council 67%); 4% of homes empty (council 5%); most built 2016 or later; 45% drive to work (council 52%); population up 19% since 2016.
    • 3 home extensions within 250 m since 2026. Most were single-storey side extensions.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 03:59 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.