PlanningRegister.ie
Planning report · Meath County Council · 2000 m around the house · the last 12 months · 16 Oct 2026, 22:06

Athlumney Village, Johnstown

53.64803, -6.66609

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (95%). A building site 905 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of AthlumneyBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2017: 1 file on Athlumney2018: 3 files on Athlumney2019: 3 files on Athlumney2020: 1 file on Athlumney2021: 3 files on Athlumney2022: 5 files on Athlumney2023: 5 files on Athlumney2024: 9 files on Athlumney2025: 6 files on Athlumney2026: 2 files on Athlumney38 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

A1 - Existing Residential: Existing Residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningR2 · Existing residential
What it says

A1 - Existing Residential: Existing Residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings178ordnance stone/marker; Pollboy Bridge
Radon grid squares1
Monuments87Religious house - Augustinian canons; Tomb - chest tomb
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 30 on the draft 2027 map; 30 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 97% by type. A new house in a garden is harder: 81% approved, and 1 in 3 is asked for more information.

Single-storey rear30 decided · more info asked 7%
97% · council 98%
Attic or dormer34 decided · more info asked 24%
97% · council 92%
New house in a garden or site16 decided · more info asked 31%
81% · council 78%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 80 nearby, 4,423 council-wide

Figure 3

Athlumney, file by file since 2017

23 of 23 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

38 planning files on Athlumney since 2017, by kind and decision.2017201820192020202120222023202420252026Extensions, atticsNo. 27 · 2018 · porch / front · approved · NA181051No number · 2018 · other extension · approved · NA181588No number · 2018 · attic conversion / dormer · approved · NA181594No number · 2019 · single-storey rear · approved · NA190016No. 35 · 2019 · porch / front · approved · NA191196No. 151 · 2020 · porch / front · approved · NA200852No number · 2021 · garage conversion · approved · 21191No. 59 · 2021 · first-floor · approved · 212218No. 24 · 2022 · attic conversion / dormer · approved · 221361No. 24 · 2023 · single-storey rear · approved · 23249No. 107 · 2023 · attic conversion / dormer · approved · 23321No. 80 · 2023 · single-storey side · approved · 23656No. 70 · 2023 · two-storey rear · approved · 23773No. 20 · 2024 · garage conversion · approved · 24216No number · 2024 · other extension · approved · 2460058No number · 2024 · single-storey rear · approved · 2460402No. 86 · 2024 · attic conversion / dormer · approved · 2460717No. 20 · 2024 · single-storey side · approved · 2460938No number · 2024 · attic conversion / dormer · approved · 2460995No. 17 · 2025 · attic conversion / dormer · approved · 2560329No. 96 · 2025 · other extension · approved · 2560759No. 9 · 2025 · single-storey side · approved · 2560864No. 16 · 2026 · rear · approved · 2660113Porches, roofs, otherNo number · 2017 · other work · approved · NA170903No number · 2019 · other work · approved · NA190114No number · 2021 · other work · approved · 211588No. 58 · 2022 · other work · approved · 22111No. 104 · 2022 · other work · approved · 22130No number · 2022 · other work · approved · 221521No number · 2023 · other work · refused · 2360342No number · 2024 · other work · refused · 24108No number · 2024 · other work · approved · 2461120No. 2 · 2025 · other work · approved · 2535No. 80 · 2025 · other work · approved · 2560687No number · 2025 · other work · approved · 2560909No number · 2026 · other work · approved · 26164New house in a side gardenNo number · 2022 · new house · approved · 22385No number · 2024 · new house · approved · 2460365
ApprovedRefusedWithdrawn or invalid

38 files with "Athlumney" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2017–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

1 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Rear31—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 6 is asked for more information, which adds about 80 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 6): 138 days; Appeal window: 4 weeks; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 51–55 (n=120)53 daysIf more info asked (1 in 6)With further information: median 138 days (n=26)138 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 142 days after permission (n=45)142 days after permissionSigned off349 days after the start, for the few who file. 58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated146 decided home extensions, 45 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 4 appealed refusals became permissions. 6 of 11 appealed approvals were reversed.

    Refusals appealed4 decided
    0 became permissions
    Approvals appealed11 decided
    6 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 8 in the last 12 months
    • 501989 Open · Within the townlands to 'Ferganstown and Ballymacon' and 'Athlumney'… · 705 m
    • 500943 Granted with conditions · Limekiln Hill , Navan , Co. Meath · 589 m
    • 501647 Open · Boyne Road , Athlumney Td. Navan , Co. Meath · 926 m
    • 324316 Pending · Beechmount, Navan, Co Meath · 1.6 km
    • 500522 Refused · Old Road, Bailis, Athlumney, Navan, Co. Meath · 666 m
    • 324256 Pending · 25 Rowan Glen, Navan, Co Meath · 211 m
    • 323854 Withdrawn · Athlumney, Alexander Reid, Ferganstown and Ballymacon, Navan, Co.Meath · 843 m
    • 323838 Open · Athlumney House, Boyne Road, Navan, Co. Meath. · 1.0 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Courts Service legal diary (judicial reviews)© the publisher16 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 4

    What's changing around you?

    Street map around Athlumney Village, Johnstown with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not started
    1. 132 Oak Vale Bailis Downs, Johnstown Navan 2661197No decision yet · 475 m
    2. 2Rear of 14 Mellow Terrace, Navan 2661143No decision yet · 846 m
    3. 3Athlumney Lodge Boyne Road, Navan 2661135No decision yet · 856 m
    4. 4Kennedy Road/, Cannon Row 2661194No decision yet · 1.6 km
    5. 5St. Anthony's, Boyne Road 26205No decision yet · 1.8 km
    6. 6Beechmount Home Park, Navan 2661179No decision yet · 2.0 km
    7. 7No. 3 Trimgate Street, Navan 2660989Approved with conditions · 1.3 km
    8. 8Anfield Balreask, Trim Road Navan 2660546Approved with conditions · 1.8 km
    9. 9Academy Street 2660748Approved, no sign building has started · 713 m
    10. 10Knockboyne House 2460943Approved, no sign building has started · 780 m
    11. 11Boyne Road 2660256Approved, no sign building has started · 955 m
    12. 12Boyne Road 2660717Approved, no sign building has started · 1.0 km
    13. 13Academy Street/Circular Road/Bridge Street 221421Approved, no sign building has started · 1.1 km
    14. 14Bridge St & The Banba Hall 22219Approved, no sign building has started · 1.2 km
    15. 15Irish National Forester's Hall NA190965Approved, no sign building has started · 1.6 km
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 35 permissions since 2016, 9 show a start notice and 3 have a completion certificate. Most owners opt out of sign-off.

    37 applications lodged within 500 m. Council: 35 approved, 2 refused. After appeals: 35 approved. Of those: 3 signed off, 6 built with the owner's opt-out, 0 started, 18 with no start notice found, 8 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT35: lodged → approved2: lodged → refused35: approved → approved2: refused → refused18: approved → no start notice found6: approved → built, owner opted out3: approved → signed off8: approved → ran out37 lodged37 lodged35 approved35 approved2 refused2 refused35 approved35 approved2 refused2 refused18 no start notice found18 no start notice found6 built, owner opted out6 built, owner opted out3 signed off3 signed off8 ran out8 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured37 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    8 deadlines within 2.0 km; the first closes 16 Oct 2026.

    8 deadlines in the next 30 days: 2026-10-16 2661135: application received — the development will consist of the Retention and completion of a living unit from converted garage (apartment) to 2 bed; 2026-10-16 26205: application received — the development will consist of the retention of alterations and change of use of existing detched domestic garage for u; 2026-10-19 2661143: application received — retention permission is sought to retain and complete the foundation works as constructed on site, as previously granted; 2026-10-27 2660989: CONDITIONAL — the development will consist of the retention of renovations and alterations to the existing two storey building, a new ; 2026-10-27 2661179: application received — the development being retained consists of timber clad detached outdoor toilets together with a sensory pod unit. The d; 2026-10-29 2660546: CONDITIONAL — The development will consist of: (a) The partial demolition of the existing rear extensions and change in roof profile f; 2026-10-30 2661194: application received — the retention and continuance of the use permanently of the existing car park with existing entrance fronting onto Kenne; 2026-11-02 2661197: application received — the work will comprise of a 38. 42sq.m conversion to the attic consisting of a bedroom, bathroom and a storage closet antoday21 Oct26 Oct31 Oct5 Nov10 Nov15 Nov2661135: application received — the development will consist of the Retention and completion of a living unit from converted garage (apartment) to 2 bed · 856 m away · 2026-10-1626205: application received — the development will consist of the retention of alterations and change of use of existing detched domestic garage for u · 1.8 km away · 2026-10-162661143: application received — retention permission is sought to retain and complete the foundation works as constructed on site, as previously granted · 846 m away · 2026-10-192660989: CONDITIONAL — the development will consist of the retention of renovations and alterations to the existing two storey building, a new · 1.3 km away · 2026-10-272661179: application received — the development being retained consists of timber clad detached outdoor toilets together with a sensory pod unit. The d · 2 km away · 2026-10-272660546: CONDITIONAL — The development will consist of: (a) The partial demolition of the existing rear extensions and change in roof profile f · 1.8 km away · 2026-10-292661194: application received — the retention and continuance of the use permanently of the existing car park with existing entrance fronting onto Kenne · 1.6 km away · 2026-10-302661197: application received — the work will comprise of a 38. 42sq.m conversion to the attic consisting of a bedroom, bathroom and a storage closet an · 475 m away · 2026-11-02
    Comments closeTime to appeal ends
    • Comments close 16 Oct 2026closes today
      32661135 · application received — the development will consist of the Retention and completion of a living unit from converted…
      €20 to the council · 856 m away
    • Comments close 16 Oct 2026closes today
      526205 · application received — the development will consist of the retention of alterations and change of use of existing…
      €20 to the council · 1.8 km away
    • Comments close 19 Oct 20263 days left
      22661143 · application received — retention permission is sought to retain and complete the foundation works as constructed on…
      €20 to the council · 846 m away
    • Time to appeal ends 27 Oct 202611 days left
      72660989 · CONDITIONAL — the development will consist of the retention of renovations and alterations to the existing two storey…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.3 km away
    • Comments close 27 Oct 202611 days left
      62661179 · application received — the development being retained consists of timber clad detached outdoor toilets together with a…
      €20 to the council · 2.0 km away
    • Time to appeal ends 29 Oct 202613 days left
      82660546 · CONDITIONAL — The development will consist of: (a) The partial demolition of the existing rear extensions and change in…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.8 km away
    • Comments close 30 Oct 202614 days left
      42661194 · application received — the retention and continuance of the use permanently of the existing car park with existing…
      €20 to the council · 1.6 km away
    • Comments close 2 Nov 202617 days left
      12661197 · application received — the work will comprise of a 38. 42sq.m conversion to the attic consisting of a bedroom, bathroom…
      €20 to the council · 475 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    245 homes 713 m away were approved Sept 2026 with no start notice yet; the permission runs to Aug 2030. 2 building sites nearby stopped before sign-off.

    Bakerhall, Limekilnhill · 544 homes: 544 homes, started Oct 2022, never signed off; Academy Street · 245 homes: 245 homes approved Sep 2026, not started; Academy Street/Circular… · 95 homes: 95 homes approved Sep 2023, not started; Boyne Road · 93 homes: 93 homes approved Sep 2026, not started2022202320242025202620272028202920302031Bakerhall, Limekilnhill · 544 homes905 m · 306021-19544 homes, started Oct 2022, never signed off544 homes, started Oct 2022, never signed offAcademy Street · 245 homes713 m · 2660748245 homes approved Sep 2026, not started245 homes approved Sep 2026, not startedAcademy Street/Circular… · 95 homes1.1 km · 22142195 homes approved Sep 2023, not started95 homes approved Sep 2023, not startedBoyne Road · 93 homes955 m · 266025693 homes approved Sep 2026, not started93 homes approved Sep 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 21 within 2.0 km

    Building site that stopped 2

    • Bakerhall, Limekilnhill · 544 homes, started Oct 2022, never signed off · 905 m
    • Kilcarn Woods, Navan · 51 homes, started Apr 2023, never signed off · 1.7 km

    Approved, not started 9

    Empty land zoned for homes 10

    • 0.2 ha zoned for homes · no homes built on it yet · 585 m
    • 8.3 ha zoned for homes · no homes built on it yet · 608 m
    • 1.7 ha zoned for homes · no homes built on it yet · 623 m
    • 20.0 ha zoned for homes · no homes built on it yet · 732 m
    • 0.5 ha zoned for homes · no homes built on it yet · 780 m
    • 1.7 ha zoned for homes · no homes built on it yet · 875 m
    • 0.5 ha zoned for homes · no homes built on it yet · 883 m
    • 2.0 ha zoned for homes · no homes built on it yet · 904 m
    • 3.6 ha zoned for homes · no homes built on it yet · 971 m
    • 1.3 ha zoned for homes · no homes built on it yet · 1.0 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 9

    Applications within 500 m, by year

    Between 1 and 7 a year; busiest 2025. 95% of decisions were approvals.

    2017: 1, 2018: 3, 2019: 4, 2020: 1, 2021: 4, 2022: 5, 2023: 6, 2024: 5, 2025: 7, 2026: 105102017: 1 approved1’17*2018: 3 approved3’182019: 4 approved4’192020: 1 approved1’202021: 4 approved4’212022: 5 approved5’222023: 5 approved2023: 1 refused6’232024: 4 approved2024: 1 refused5’242025: 7 approved7’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 80 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Building work nearby 45 in the last 12 months
    5 signed off as finished29 not signed off11 no sign-off needed
    • site north of Old Road, south and west of the LDR 6 Distributor Road, An Uaimh, Meath · 5 Oct 2026 · 223 homes · start notice not signed off · 25/60539 · 1.1 km
    • Old Road, Navan, Meath · 30 Sept 2026 · 7-day notice not signed off · 25/60539 · 915 m
    • Old Road, Navan, Meath · 28 Sept 2026 · 7-day notice not signed off · 25/60539 · 929 m
    • Old Road, Navan, Meath · 28 Sept 2026 · 7-day notice not signed off · 25/60539 · 928 m
    • Old Road, Navan, Meath · 28 Sept 2026 · 7-day notice not signed off · 25/60539 · 935 m
    • Old Road, Navan, Meath · 28 Sept 2026 · 7-day notice not signed off · 25/60539 · 930 m
    • 1 Kennedy Road, Navan, Meath · 14 Sept 2026 · 7-day notice not signed off · 25/61295 · 1.5 km
    • 20-29 Beaufort Lawn, Athlumney, Meath · 9 Sept 2026 · 10 homes · start notice not signed off · ABP-322341-25 · 1.1 km
    • 30-37 Beaufort Lawn, Navan, Meath · 9 Sept 2026 · 8 homes · start notice not signed off · ABP-322341-25 · 1.1 km
    • site north of Old Road, south and west of the LDR 6 Distributor Road, An Uaimh, Meath · 29 Aug 2026 · 7-day notice not signed off · 25/60539 · 1.1 km
    • Balreask Old, Navan, Meath · 25 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2561312 · 1.2 km
    • Athlumney Close, Navan, Meath · 24 Jul 2026 · 1 homes · start notice signed off · 24/60799 · 1.2 km
    • Boyne Road, Navan, Meath, C15 XEE9 · 13 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2460121 · 1.1 km
    • Beaufort Meadows, Navan, Meath · 7 Jul 2026 · 111 homes · start notice not signed off · ABP-322341-25 · 968 m
    • 57 Academy Street, Navan, Meath, C15 HN27 · 26 Jun 2026 · 2 homes · 7-day notice not signed off · 1.0 km
    • 56 Academy Street, Navan, Meath, C15 XN25 · 26 Jun 2026 · 2 homes · 7-day notice not signed off · 1.0 km
    • 1 Kennedy Road, Navan, Meath, C15 RY11 · 22 Jun 2026 · 7-day notice signed off · 1.5 km
    • 4 McDermott Villas, Navan, Meath, C15 H5P7 · 18 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 1.9 km
    • 1 The Rise, An Uaimh, Meath, C15 P9YW · 16 Jun 2026 · start notice not signed off · 25/60599 · 832 m
    • 70 Carne Hill, Navan, Meath, C15 NR1X · 29 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/61334 · 2.0 km
    • Blackcastle Shopping Centre, Beaufort Place, Meath, C15 WR50 · 25 May 2026 · 7-day notice not signed off · 1.9 km
    • Dublin Road, Navan, Meath, C15 F7H2 · 21 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2560902 · 1.3 km
    • Watercress Avenue, Navan, Meath · 7 May 2026 · 2 homes · start notice not signed off · 2560 · 2.0 km
    • 5 Maple Avenue, Johnstown Wood, Meath, C15 YDW0 · 29 Apr 2026 · short notice no sign-off needed · 25/61275 · 726 m
    • Pairc Tailteann, Navan, Meath, C15 XD83 · 21 Apr 2026 · 7-day notice not signed off · 2560092 · 1.9 km
    • site north of Old Road, south and west of the LDR 6 Distributor Road, An Uaimh, Meath · 8 Apr 2026 · 223 homes · start notice not signed off · 25/60539 · 1.0 km
    • Farganstown, Navan, Meath · 6 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 25/172 · 1.9 km
    • 80 Athlumney Castle, Navan, Meath, C15 C6EC · 17 Mar 2026 · start notice, opted out no sign-off needed · 23656 · 320 m
    • site north of Old Road, south and west of the LDR 6 Distributor Road, An Uaimh, Meath · 13 Mar 2026 · 223 homes · start notice not signed off · 25/60539 · 1.1 km
    • 22 Market Square, Navan, Meath, C15 XF40 · 27 Feb 2026 · start notice not signed off · 23/521 · 1.3 km
    • site north of Old Road, south and west of the LDR 6 Distributor Road, An Uaimh, Meath · 25 Feb 2026 · 223 homes · 7-day notice not signed off · 25/60539 · 1.0 km
    • Navan Town Centre, Kennedy Road, Abbeyland South, Navan, Meath, C15 YV38 · 24 Feb 2026 · 7-day notice signed off · 1.5 km
    • Pairc Tailteann, Brews Hill/Commons Road, Townparks Td, Navan, Meath · 10 Feb 2026 · start notice not signed off · 2560092 · 1.9 km
    • site north of Old Road, south and west of the LDR 6 Distributor Road, An Uaimh, Meath · 6 Feb 2026 · 223 homes · start notice not signed off · 25/60539 · 943 m
    • site north of Old Road, south and west of the LDR 6 Distributor Road, An Uaimh, Meath · 5 Feb 2026 · 223 homes · start notice not signed off · 25/60539 · 1.1 km
    • site north of Old Road, south and west of the LDR 6 Distributor Road, Navan, Meath · 5 Feb 2026 · 223 homes · start notice not signed off · 25/60539 · 1.2 km
    • Flower Hill, Navan, Meath, C15 X9H9 · 30 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 22/63 · 1.5 km
    • 9 Dublin Road, Navan, Meath, C15 C2Y6 · 22 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60536 · 911 m
    • 12 Blackwater Abbey, Navan, Meath, C15 C3X2 · 5 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 25/44 · 1.9 km
    • Trim Road, Navan, Meath · 22 Dec 2025 · 7-day notice signed off · 1.2 km
    • Limebrook Vale, Navan, Meath · 19 Dec 2025 · 46 homes · 7-day notice not signed off · 24/201 · 1.4 km
    • Swanbrook / Limebrook, Navan, Meath · 26 Nov 2025 · 64 homes · start notice signed off · 24/201 · 1.5 km
    • Creche Building, Limebrook, Navan, Meath · 19 Nov 2025 · 7-day notice not signed off · 23/403 · 1.4 km
    • Abbey Road, Navan, Meath, C15 Y7PN · 4 Nov 2025 · start notice not signed off · 2560332 · 1.5 km
    • 60 Academy Street, Navan, Meath, C15 V050 · 30 Oct 2025 · 7-day notice not signed off · 25/60285 · 1.0 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 16 Oct 2026, 00:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Homes coming 649 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Flowers Montessori & Playschool · Crèche21 Oct 2025 · report · Tusla Early Years Inspectorate207 m
    Happy Ever After Playschool · Crèche1 Mar 2024 · report · Tusla Early Years Inspectorate207 m
    Wonderkids Limited · Crèche27 Sept 2024 · report · Tusla Early Years Inspectorate332 m
    Giraffe Childcare Limited · Crèche19 Jun 2025 · report · Tusla Early Years Inspectorate351 m
    Kiddy Academy · Crèche29 Apr 2025 · report · Tusla Early Years Inspectorate789 m
    The Childrens House · Crèche28 Nov 2024 · report · Tusla Early Years Inspectorate853 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Meath County Council.
    Homes approved
    Here781
    Council middle0
    Homes started
    Here1,489
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    1% of homes built before 1971 (council 18%). 89% owner-occupied (council 75%).

    Homes built before 1971
    1% · council 18%
    Homes built since 2001
    26% · council 45%
    Owner-occupied
    89% · council 75%
    Rented
    10% · council 20%
    Children under 15
    12% · council 23%
    Aged 65 and over
    23% · council 12%
    Households with 2+ cars
    58% · council 54%
    Work mainly from home
    12% · council 11%
    This small area (203 people)Meath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167065070

    Bus
    306 m
    Athlumney Vllge · 188, NV1 · busiest stop within 500 m: 4 an hour at peak
    Nearest school
    874 m
    Loreto Secondary School, 920 pupils
    Homes sold nearby
    1366
    in 3 years, 117 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Loreto Secondary School · postprimary · 920 pupils · 874 m
    • Ard Rí Community National School · primary · 384 pupils · 1.1 km
    • Coláiste na Mí · postprimary · 913 pupils · 1.1 km
    • St Marys Special School · primary · 83 pupils · 1.1 km
    • Gaelscoil Eanna · primary · 138 pupils · 1.1 km
    • Beaufort College · postprimary · 926 pupils · 1.2 km
    • Flowerfield NS · primary · 40 pupils · 1.3 km
    • Aine Naofa NS · primary · 312 pupils · 1.4 km

    Stops 73

    • Athlumney Vllge · 188, NV1 · 3/hour at peak · 306 m
    • Athlumney Vllge · 188, NV1 · 2/hour at peak · 308 m
    • The Orchard · 188, NV1 · 2/hour at peak · 350 m
    • The Orchard · 188, NV1 · 3/hour at peak · 381 m
    • Bóthar Sion · NX · 4/hour at peak · 463 m
    • Bóthar Sion · NX · 2/hour at peak · 479 m
    • Bailis · 188, NV1 · 2/hour at peak · 480 m
    • Bailis · 188, NV1 · 3/hour at peak · 538 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Loreto Secondary School · 874 m+1.2% pupils (920) · 2 classrooms 2024, approved with conditions
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Council consultation portalsPublic16 Oct 2026, 01:34open
    Council meetings (ModernGov)Public16 Oct 2026, 01:42open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 475 m away open for comments until 2 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Athlumney
    Electoral division
    Navan Rural
    Electoral area
    Navan
    Council
    Meath County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 21 sites nearby could change: 2 stalled builds, 9 approved schemes, 10 empty zoned plots.
    • 6 applications open for comments nearby; nearest closes 2 Nov 2026.
    • 649 homes approved nearby, not started; largest 245 at Academy Street.
    • Bóthar Sion (bus NX) 463 m away: 4 an hour at morning peak; 18 from all stops within 500 m.
    • Here (2022 census): 89% owner-occupied (council 75%); 3% of homes empty (council 6%); most built 1991–2000; 70% drive to work (council 64%); population up 14% since 2016.
    • 3 home extensions within 250 m since 2025. Most were rear extensions.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
    www2.courts.ie—© the publisher16 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    water.ie—© the publisher · flag only—
    water.ie—© the publisher · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 16 Oct 2026, 22:06 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.