Dublin City Council · 2712/21 · Permission

153-155 Harold's Cross Road

38 apartments5 storeysRed Rock Harold's X LimitedDublin 6W, Dublin City Council

All 35 permitted homes are built (Q4 2025).

Also known as Michael Grant Motors.

  1. 4 May 2021Received
  2. 28 Jun 2021Refuse permission
  3. 26 Jul 2021Appealed
  4. 23 May 2022Appeal: Approved with conditions
  5. 23 May 2022Final approval
  6. 20 Mar 2023Building started
Status
Building started
Decision
Refuse permission · 28 Jun 2021
Size
38 apartments · up to 5 storeys
Uses
residential, apartments
Applicant
Red Rock Harold's X Limited
Site
775 m²
Appeal
ACP 310947 · Approved with conditions

Building progress councils’ figures, Q4 2025

  1. 2021Approved
  2. 2023Building started
  3. Not yetFirst homes signed off

All 35 permitted homes are built (Q4 2025).

35
homes proposed
35
homes permitted
35
homes started on site
35
homes completed

completed · under construction · not started · 0 houses and 35 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202535350
Q3 202535350
Q4 202535035

The scheme

Red Rock Harold's X Limited proposes the demolition of a two-storey garage and showroom at 153-155 Harold's Cross Road. The application seeks to construct a five-storey building containing 38 build-to-rent apartments. The development includes amenity facilities, bicycle storage, and a shared roof terrace.

it involves the construction of a 38-unit build-to-rent apartment development

What the register says

Permission is sought for the demolition of the existing two storey building previously used as a garage and showroom and the construction of a Build to Rent residential apartment development comprising 38 no. apartments (29 no. one beds, 3 no. two beds and 6 no. studios) in a five storey (four storey with fifth floor set back) over basement apartment building. 32 no. apartment units are provided with private balconies/terraces with 6 no. apartment units provided with juliet balconies with all apartments provided with access to the shared roof terrace at fourth floor level and courtyard at ground floor level. The proposed development also provides for Build to Rent amenity facilities comprising concierge, business lounge and games room at ground floor level with TV room and meeting room at basement level. 1 no. ESB substation, switch room and bin storage are provided at ground floor level, and plant room and 62 no. bicycle spaces proposed at basement level. Permission is sought for pedestrian access to the apartment building from Harold's Cross Road and all associated engineering and site ancillary works necessary to facilitate the development

Summary from the register record.

Planning timeline 8 steps

  • 4 May 2021
    Application lodged — Standard
  • 28 Jun 2021
    Council decision — Refuse
  • 27 Jul 2021
    Appealed to An Coimisiún Pleanála — ABP-310947-21
  • 23 May 2022
    Commission decision — Granted
  • 23 May 2022
    Final approval
  • 20 Mar 2023
    Building started
  • Q4 2025
    Site completed — Site completed
  • 7 Jun 2027
    Approval runs out (estimate)

The site 775 m²

Boundary of 153-155 Harold's Cross Road as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 8 applications in the last 10 years

Appeals inside the site 7 with An Coimisiún Pleanála

Building work started inside the site 2 commencement notices

Around 153-155 Harold's Cross Road 1 km

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.32396, -6.27820

WhatZoning, appeals, sold prices, flood and heritage — the whole area in one PDF.apos;s planned around it, could you extend, and what to ask before you buy.

No account, no payment. Not a statutory planning search.

Other big developments nearby within 2 km

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.