Adamstown Phase 2
2 homes2 storeysHugh McGreevy & Sons Ltd and Tierra Ltd.Lucan, South Dublin County Council
Approved Jul 2024; first homes signed off May 2025.
Also known as Tubber Lane Development Area.
- 13 May 2024Received
- 8 Jul 2024Approved
- 12 Aug 2024Building started
- 8 May 2025Signed off
- Status
- Building started
- Decision
- Approved · 8 Jul 2024
- Size
- 2 homes · up to 2 storeys
- Uses
- residential, houses
- Applicant
- Hugh McGreevy & Sons Ltd and Tierra Ltd.
- Site
- 2,083 m²
Is it built?
- 2024Approved
- 2024Building started
- 2025First homes signed off1 sign-off
The scheme
Hugh McGreevy & Sons Ltd and Tierra Ltd. propose amendments to the permitted Phase 2 residential development at the Tubber Lane Development Area in Adamstown. The application includes the construction of two additional three-bedroom houses. These works involve site layout, landscaping, and drainage adjustments to increase the total unit count from 172 to 174.
it increases the total number of residential units within the permitted Phase 2 development
What the register says
THIS APPLICATION RELATES TO DEVELOPMENT WITHIN THE ADAMSTOWN STRATEGIC DEVELOPMENT ZONE (SDZ) AND IS SUBJECT TO THE ADAMSTOWN PLANNING SCHEME 2014, AS AMENDED. Hugh McGreevy & Sons Ltd and Tierra Ltd. intend to apply for planning permission for amendments to the Phase 2 residential development permitted under Reg. Ref.: SDZ19A/0008, as amended under Reg. Ref.: SDZ20A/0014 and Reg. Ref.: SDZ23A/0015, currently under construction, at a site located in the Tubber Lane Development Area within the Adamstown SDZ, Tubber Lane, Adamstown, Lucan, Co Dublin. The application site is located to the south of Tubber Lane Road, in the north-west of the Adamstown SDZ lands, to the south of Tubber Lane Road, east of the Celbridge Link Road, and north of Shackleton Drive. The proposed development relates to amendments to the permitted development to provide for 2 no. additional houses. The proposed development will consist of the following: • Construction of 1 no. 2 storey, 3 bed house to the side of No. 1 Hallwell Avenue, to increase the number of terraced units from 3 no. to 4 no., including private open space, in-curtilage car and cycle parking spaces, and associated amendments to the permitted No. 1 Hallwell Avenue end of terrace dwelling; • Construction of 1 no. 2 storey, 3 bed house to the side of No. 31 Hallwell Avenue, to increase the number of terraced units from 3 no. to 4 no., including private open space, in-curtilage car and cycle parking spaces, and associated amendments to the permitted No. 31 Hallwell Avenue end of terrace dwelling; • Associated amendments to the site layout, open space, landscaping, car parking, foul and surface water drainage, and services to provide for the proposed development; • All associated site development and ancillary works. The proposed amendment will increase the total number of residential units within the permitted Phase 2 residential development, as amended, from 172 no. units to 174 no. units
Summary from the register record.
The site 2,083 m²
Boundary of Adamstown Phase 2 from the planning application.
Planning applications inside the site 5 applications in the last 10 years
Appeals inside the site 1 with An Coimisiún Pleanála
Building work started inside the site 1 commencement notice
Other big developments nearby within 2 km
- Adamstown Tubber Lane · 455 homes · 4 storeys · 45 m away
- Tubber Lane, Adamstown · 455 homes · 4 storeys · 45 m away
- Tubber Lane Residential Development · 453 homes · 109 m away
- Hallwell Block E · 181 homes · 127 m away
- Adamstown SDZ · 18 homes · 127 m away
- 7 Hallwell Drive · 1 storeys · 163 m away
- Hallwell Drive · 163 m away
- Shackleton Phase 4 · 2 homes · 178 m away