Tubber Lane, Adamstown
Building: 27 under construction of 453 homes (Q2 2026).
4 storeysHugh McGreevy & Sons Ltd.Lucan, South Dublin County Council
Email me when the next phase is lodged
How the homes are counted453 permitted · 455 applied for
- 453 homes permitted (the Dublin councils' housing pipeline, Q2 2026).
- 455 homes applied for (the application on the planning register).
- Status
- Building started
- Decision
- Approved · 27 Oct 2022
- Height
- up to 4 storeys
- Uses
- residential, houses, apartments
- Applicant
- Hugh McGreevy & Sons Ltd.
- Site
- 10.67 ha
Building progress councils’ figures, Q2 2026
- 2022Approved
- 2026Building started
- Not yetFirst homes signed off
completed · under construction · not started · 265 houses and 188 apartments permitted
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q2 2025 | 453 | 0 | 0 | |
| Q3 2025 | 453 | 0 | 0 | |
| Q4 2025 | 453 | 0 | 0 | |
| Q1 2026 | 453 | 0 | 0 | |
| Q2 2026 | 453 | 27 | 0 |
Source and licence
The scheme
Hugh McGreevy & Sons Ltd. proposes the construction of 455 residential units at Tubber Lane, Adamstown. The development includes a mix of houses, duplexes, and apartments in blocks ranging from two to four storeys. The project also involves new internal roads, public open space, and associated site development works.
What the register says
455 residential units (including a mixture of 2 and 3 storey semi-detached and terraced houses, and duplex units and apartments in 3 and 4 storey blocks), new internal roads and footpaths, site access, public open space, car parking, cycle stores, landscaping, bin stores, foul and surface water drainage, boundary walls and fences, ESB substations and all associated site development works. Private and semi-private open space to serve the proposed units will be provided in the form of balconies, terraces and gardens; including revisions to the permitted / under construction Celbridge Link Road (part of Loop Road 3), permitted under Reg. Ref SDZ17A/0009, associated with the provision of access to the development, parallel parking bays, and public lighting; 58 two bed, two storey, terraced houses (Type E1, E2, E3, J1 & J2); 6 three bed, two storey, semi-detached houses (Type 11); 190 three bed, two storey, terraced houses (Type A 1, A2, A3, B1, 82, C1, C2, C3, D1, D2, F1, F2, 11 & 12); 5 three bed, three storey, terraced houses (Type H); 6 four bed, two storey, terraced houses (Type K1, K2); 7 apartment Blocks (Blocks B, D, E, G, H, I & K) containing 111 apartments/duplexes including 32 one bed apartments, 22 two bed and 57 three bed duplex apartments over 3 storeys; 4 apartment Blocks (Blocks A, C, J & L) containing 37 apartments/duplexes including 8 no. one bed apartments, 29 three bed duplex apartments over 4 storeys; 1 apartment Block (Block F) containing 42 apartments including 2 one bed apartments and 40 two bed apartments over 4 storeys on a site located to the south of Tubber Lane, in the north-west of the Adamstown SDZ lands and to the west and south-west of the permitted/under construction Tubber Lane Phase 2 development (Reg. Ref: SDZ19A/0008, as amended under Reg. Ref: SDZ20A/0014)
Summary from the register record.
Planning timeline 5 steps
- 20 Dec 2021Application lodged — DZ
- 27 Oct 2022Council decision — Grant
- 27 Oct 2022Final approval
- 20 May 2026Building started
- 10 Dec 2027Approval runs out (estimate)
The site 10.67 ha
Boundary of Tubber Lane, Adamstown as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 7 applications in the last 10 years
- GrantedTubber Lane, Lucan, Dublin
- CommencedTubber Lane, Adamstown, Lucan, Co. Dublin.
- CommencedAdamstown, Co Dublin
- CommencedIn the townland of Aderrig, Adamstown, Lucan, Co. Dublin
- CommencedTubber Lane, Adamstown, Lucan, Co. Dublin.
- CommencedShackleton Phase 4 (Development Area 4- Tobermaclugg Village), within Adamstown SDZ Lands, Adamstown, Lucan, Co. Dublin
- CommencedAdamstown, Lucan, Co. Dublin
Appeals inside the site 1 with An Coimisiún Pleanála
Commencement notices inside the site 5
- Commencedlands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, Dublin
- Commencedlands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, Dublin
- Commencedlands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, Dublin
- Commencedlands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, South Dublin
- Commencedlands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, South Dublin
Other big developments nearby within 2 km
- Adamstown Tubber Lane · approved 2026 · 455 homes · 4 storeys · 0 m away
- Tubber Lane Residential Development · approved 2026, no start notice · 453 homes · 11 m away
- Aderrig Development Area · first homes signed off 2024 · 207 homes · 4 storeys · 141 m away
- Shackleton Phase 4 · first homes signed off 2022 · 128 homes · 5 storeys · 156 m away
- Adamstown Phase 2 · first homes signed off 2025 · 2 homes · 2 storeys · 193 m away
- Tubber Lane Development Area · withdrawn or invalid · 187 homes · 4 storeys · 194 m away
- Development Area 8, Adamstown · first homes signed off 2023 · 227 homes · 4 storeys · 200 m away
- Hallwell Block E · building started 2026 · 181 homes · 244 m away
Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.