Hallwell Block E
181 apartmentsHugh McGreevy & Sons Ltd and Tierra LtdSouth Dublin County Council
Approved Apr 2026; building started May 2026.
Also known as Tubber Lane Development Area.
- 23 Dec 2025Received
- 20 Apr 2026Approved
- 26 May 2026Building started
- Status
- Building started
- Decision
- Approved · 20 Apr 2026
- Size
- 181 apartments
- Uses
- residential, apartments
- Applicant
- Hugh McGreevy & Sons Ltd and Tierra Ltd
- Site
- 1,647 m²
Is it built?
- 2026Approved
- 2026Building started
- Not yetFirst homes signed off
The scheme
Hugh McGreevy & Sons Ltd and Tierra Ltd propose modifications to the permitted apartment Block E at Hallwell in the Adamstown SDZ. The development involves reconfiguring ground floor areas to provide two additional age-friendly apartments. This increases the total residential unit count for the Phase 1 development to 181 units.
it increases the total number of residential units within the permitted Phase 1 development
What the register says
This application relates to development within the Adamstown strategic development zone (SDZ) and is subject to the Adamstown planning scheme 2014, as amended. Planning permission for modifications to the development permitted under Reg. Ref.: SDZ24A/0026W, which relates to permitted apartment Block E (currently under construction) at Hallwell within the Tubber Lane Development Area of the Adamstown SDZ, Tubber Lane, Adamstown, Lucan, Co Dublin. The application site is located to the south of Tubber Lane Road in the north-west of the Adamstown SDZ lands, east of the Celbridge Link Road, south of Hallwell Road and north of Shackleton Drive. The site is located in the southern part of the Phase 1 residential development permitted under Reg. Ref.: SDZ17A/0006, as amended under Reg. Ref.: SDZ18A/0005, Reg. Ref.: SDZ19A/0010, and Reg. Ref.: SDZ20A/0006. The proposed development comprises modifications to permitted apartment Block E to provide for 2 no. additional age friendly apartments, and will consist of the following: • Omission of permitted ancillary staff areas, and reduction and reconfiguration of ancillary communal lounge area at ground floor level and provision of 2 no. 1 bedroom apartments at ground floor level; • Minor modifications to the permitted building facades; • Minor modifications to the permitted site layout to facilitate 2 no. additional cycle parking spaces; • All associated modifications to landscaping, foul and surface water drainage, and services necessary to facilitate the development; • All associated site development and ancillary works. The proposed modifications will increase the total number of age friendly apartments within Block E by 2 no., from 22 no. to 24 no., and the total number of residential units within the permitted Phase 1 residential development, as amended, from 179 no. to 181 no. units
Summary from the register record.
The site 1,647 m²
Boundary of Hallwell Block E from the planning application.
Planning applications inside the site 4 applications in the last 10 years
Appeals inside the site 1 with An Coimisiún Pleanála
Building work started inside the site 2 commencement notices
Other big developments nearby within 2 km
- Adamstown SDZ · 18 homes · 0 m away
- Shackleton Phase 4 · 2 homes · 34 m away
- Adamstown Tubber Lane · 455 homes · 4 storeys · 35 m away
- Tubber Lane, Adamstown · 455 homes · 4 storeys · 35 m away
- 7 Hallwell Drive · 1 storeys · 73 m away
- Hallwell Drive · 73 m away
- Tubber Lane Residential Development · 453 homes · 102 m away
- Adamstown Phase 2 · 2 homes · 2 storeys · 125 m away