Clonburris Development Areas CSW-S1 & CSW-S2
Building: 368 finished, 197 under construction of 565 homes (Q2 2026).
4 storeysCairn Homes Properties Ltd.South Dublin County Council
Email me when the next phase is lodged
Also known as Clonburris SDZ.
- Status
- Building started
- Decision
- Approved · 11 Dec 2023
- Height
- up to 4 storeys
- Uses
- residential, apartments, houses, infrastructure
- Applicant
- Cairn Homes Properties Ltd.
- Site
- 13.79 ha
Building progress councils’ figures, Q2 2026
- 2023Approved
- 2024Building started
- 2025First homes signed off25 sign-offs
completed · under construction · not started · 230 houses and 335 apartments permitted
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q2 2025 | 565 | 340 | 8 | |
| Q3 2025 | 565 | 401 | 36 | |
| Q4 2025 | 565 | 322 | 219 | |
| Q1 2026 | 565 | 338 | 227 | |
| Q2 2026 | 565 | 197 | 368 |
Source and licence
The scheme
Cairn Homes Properties Ltd. proposes the construction of 565 dwellings in the Clonburris Development Areas CSW-S1 and CSW-S2. The development includes a mix of houses, duplex apartments, and apartments alongside public open space and infrastructure works. The site is located within the townland of Cappagh and Clonburris Little.
What the register says
7 year Planning Permission for development at site of c. 13.75 hectares (on 2 parcels of land consisting of construction of 565 dwellings (mixture of apartments, duplex apartments and houses) in the Clonburris Development Areas CSW-S1 & CSW-S2 of the Clonburris SDZ Planning Scheme 2019 as follows a) 230 houses comprising 1 two bedroom house, 217 three bedroom houses and 12 four bedroom houses, all 2 storey (house types H3, H4, H4S, H5, H6 - 3 no. storeys) comprising semi-detached, terraced, end terrace units (with parking, solar panels and private open space); b) 216 duplex apartments/apartments comprising 108 two bedroom units and 108 three bedroom units, in 20 no. 3 no. storey buildings (in a series of 4, 6, 7, 8 & 9 terraced blocks); c) 119 apartments as follows: Block 81 (4 storeys) consists of 72 apartments (33 one bedroom & 39 two bedroom apartments); Block 82 (4 storeys) consists of 47 apartments (17 one bedroom apartments & 30 two bedroom apartments (all apartments to have terrace or balcony); d) Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 to the east; e) Public Open Space/landscaping of c. 3 hectares (to include Grand Canal Park along the southern boundary of the site to connect to existing Grand Canal towpath) as well as a series of communal open spaces to serve apartments and duplex units; f) The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (675 spaces) and bicycle parking (998 spaces), single storey ESB substations/bike/bin stores, green roofs and solar panels at roof level of apartments, and all ancillary site development / construction works; g) Permission is also sought for provision of and connection to water supply foul drainage infrastructure; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 all on wider lands bounded generally by the Dublin-Cork railway line to the north, the Grand Canal to the south, and undeveloped lands to the east and west and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application
Summary from the register record.
Planning timeline 5 steps
- 26 May 2023Application lodged — DZ
- 11 Dec 2023Council decision — Grant
- 11 Dec 2023Final approval
- 18 Sept 2024Building started
- 24 Jan 2029Approval runs out (estimate)
The site 13.79 ha
Boundary of Clonburris Development Areas CSW-S1 & CSW-S2 as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 8 applications in the last 10 years
- OpenAt this site of c. 0.75 hectares, to the west of Lockhouse Drive within the townland of Cappagh and Clonburris Great and Gallanstown, ‘Clonburris’, Dublin 22,, all on wider lands bounded generally by lands known as ‘Seven Mills/Parkleigh’ to the ea
- GrantedLockhouse Gate, Seven Mills, Clonburris, Dublin 22, Co. Dublin
- CommencedWithin the townlands of Clonburris Great and, Kilmahuddrick and, Clonburris Little, Clondalkin, Dublin 22.
- CommencedWithin the townland of Cappagh and Clonburris, Clonburris, Dublin 22
- CommencedDevelopment Area 9 Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22.
- CommencedWithin the townlands of Cappagh, Clonburris Little & Kishoge, Co. Dublin
- CommencedWithin the townland of Cappagh and Clonburris Litte, Clonburris, Co. Dublin
- CommencedWithin the Townlands of Cappagh, Clonburris Little & Kishoge, Co. Dublin
Appeals inside the site 2 with An Coimisiún Pleanála
Commencement notices inside the site 16
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Dublin, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Cappagh, South Dublin
- CommencedSeven Mills, Dublin, South Dublin
- CommencedClonburris T3, Dublin, South Dublin
- CommencedClonburris T3, Dublin, South Dublin
- CommencedClonburris Southern Link Street, Dublin, South Dublin
Other big developments nearby within 2 km
- Cappagh and Clonburris · first homes signed off 2026 · 3 m away
- Cappagh · first homes signed off 2026 · 2 homes · 171 m away
- Clonburris South West · first homes signed off 2023 · 569 homes · 6 storeys · 171 m away
- Clonburris Great · first homes signed off 2026 · 263 m away
- Development Area 9 Kishoge South East · first homes signed off 2026 · 660 homes · 6 storeys · 287 m away
- Kishoge · first homes signed off 2025 · 309 m away
- Parkleigh Drive · approved 2026, no start notice · 365 m away
- Clonburris Development Areas CUCS3 & CSWS3 · first homes signed off 2025 · 594 homes · 7 storeys · 450 m away