Kellystown and Porterstown Lands
Building: first homes signed off Nov 2026, of 47 homes; approved Feb 2026.
A start notice was filed, but the councils' Q2 2026 return counts none of the 47 homes started yet.
Castlethorn Developments Luttrellstown LimitedDublin 15, Fingal County Council
Email me when the next phase is lodged
- Status
- Start notice filed
- Council decision
- Approved · 20 Nov 2025
- Approved
- 3 Feb 2026 · final grant
- Uses
- residential
- Applicant
- Castlethorn Developments Luttrellstown Limited · 7 planning applications, 80% granted
- Site
- 2.09 ha
- Appeal
- ACP 500486 · Other · 12 Jun 2026
Building progress councils’ figures, Q2 2026
- 2026Approved
- 2026Start notice filed
- 2026First homes signed off1 sign-off
Quarter by quarter
| Quarter | Permitted | Under construction | Completed | Completed share |
|---|---|---|---|---|
| Q4 2025 | 0 | 0 | 0 | |
| Q1 2026 | 0 | 0 | 0 | |
| Q2 2026 | 47 | 0 | 0 |
Source and licence
The scheme
Castlethorn Developments Luttrellstown Limited proposes a residential development on a site in the townlands of Kellystown and Porterstown, Dublin 15. The project involves the construction of 47 units on a site area of approximately 2.17 hectares.
What the register says
Permission at site (c. 2.17 ha) in the townlands of Porterstown and Kellystown, Dublin 15. The site (Luttrellstown Gate Phase 2 - Site B) is located within the Kellystown Local Area Plan development boundary. The site is generally bounded to the north by the Dublin-Maynooth rail line, to the south and east by permitted Strategic Housing Development (ABP-312318-21 as amended by LRD0034/S3) known as Luttrellstown Gate (Phase 1), with the shared boundary defined by hedgerow, and to the west by concurrent planning application known as Luttrellstown Gate (Phase 2 - Site A). The site boundary extends to the southwest to accommodate foul drainage to a permitted foul pumping station and surface water drainage to a permitted attenuation pond (both on Phase 1 lands permitted under ABP-312318-21 as amended by LRD0034/S3). The proposed development comprises 47 no. dwellings, in a mix of houses and duplex units/own-door apartments, ranging from 2-3 storeys in height, including 35 no. houses (31 no. 3-bed and 4 no. 4-bed), and 12 no. duplex/apartment units with balconies (8 no. 1-bed and 4 no. 2-bed); and all associated and ancillary site development, landscaping and boundary treatment works, including: 54 no. surface car parking spaces; 152 no. bicycle parking spaces for mid-terrace and duplex units; Bin stores; Private, communal and public open space; Public lighting; Minor amendments to the permitted surface water attenuation pond. Vehicular access is provided off the existing Kellystown Link Road via the internal roads of Luttrellstown Gate (Phase 1)…
Cut short by the council feed. Full text ↗
Summary from the register record.
Planning timeline 7 steps
- 26 Sept 2025Application lodged — Standard
- 17 Dec 2025Appealed to An Coimisiún Pleanála — PL-500486-DF-25
- 3 Feb 2026Council decision — Grant
- 3 Feb 2026Commission decision — Granted
- 3 Feb 2026Final approval
- 22 Jul 2026Building started
- 15 Mar 2031Approval runs out (estimate)
The site 2.09 ha
Boundary of Kellystown and Porterstown Lands as the Dublin councils map it in the housing pipeline.
Planning applications inside the site 6 applications in the last 10 years
- CommencedLands in the Townlands of Kellystown and Porterstown, Dublin 15
- CommencedLands in the Townlands of Kellystown and Porterstown, Dublin 15
- WithdrawnLands in the Townlands of, Kellystown and Porterstown,, Dublin 15
- WithdrawnLands in the Townlands of Kellystown and Porterstown, Dublin 15
- RefusedThe townlands of Porterstown and Kellystown, Dublin 15
- CommencedIn the townlands of Kellystown, Porterstown and Diswellstown, Clonsill
Appeals inside the site 8 with An Coimisiún Pleanála
- OtherLands in the Townlands of Kellystown and Porterstown, Dublin 15
- OtherLands in the Townlands of Kellystown and Porterstown, Dublin 15
- OtherKellystown, Clonsilla, Dublin 15
- OtherKellystown, Clonsilla, Dublin 15
- OtherKellystown, Clonsilla, Dublin 15
- GrantedKellystown, Clonsilla, Dublin 15
- OtherCounty Dublin, County Meath, County Kildare
- Granted with conditionsIn the townlands of Kellystown, Porterstown and Diswellstown, Clonsilla, Dublin 15. (www.kellystownshd2.com)
Commencement notices inside the site 2
Other big developments nearby within 2 km
- Townlands of · withdrawn or invalid · 56 homes · 0 m away
- Old Schoolhouse Site (former Clonsilla School · refused 2021 · 215 m away
- Clonsilla Inn · approved 2025, no start notice · 293 m away
- Porterstown Road · refused 2021 · 99 homes · 313 m away
- Weavers Row · withdrawn or invalid · 76 homes · 332 m away
- Allendale House · approved 2026, no start notice · 56 homes · 1.8 km away
- Winterwood · lodged 2026, not decided · 30 homes · 1.8 km away
- Site A · approved 2023, no start notice · 1.8 km away
Start notices are matched from the national building control register; a start on site can be missed.