Fingal County Council · F23A/0652 · Permission

Northwood Avenue

Building started Apr 2026: 180 homes; approved Mar 2024.

Fingal County Council

Email me when the next phase is lodged

Status
Building started
Decision
Approved · 25 Jan 2024
Site
2,934 m²

Is it built?

  1. 2024Approved
  2. 2026Building started
  3. Not yetFirst homes signed off

The scheme

What the register says

Planning permission for alterations to previously approved development (Reg. Ref. F18A/0438) comprising: (i) alterations to four-storey office building to provide for a part-six, part-seven storey mixed use building with revised layout and design, to facilitate the provision of 180 no. student accommodation bed spaces between first and fifth floor levels contained within 35 no. units comprising 10 no. studio, 5 no. two-bed (twodios) and 20 no. eight-bed units; (ii) alterations to layout of previously approved creche and associated screened outdoor play area, provision of a reception/amenity area with associated outdoor seating area, with the inclusion of a vehicular set down area to the front of the building; (iii) revisions to roof plan to include PV panels and watertank; (iv) provision of communal amenity space by way of amenities rooms, games room, tv room, and study room at sixth floor level and reception area lounge, management room, bin store, laundry room, and parcel room at ground floor level to serve the student accommodation element of the proposal; (v) provision of 234 no. bicycle parking spaces, outdoor amenity space and enclosed heat pump at ground floor level; (vi) revision of the parking area to provide 8 no. car parking spaces situated to the front of the site; (vii) upgrade works to the east of the site along Northwood Crescent for the provision of a public footpath; and (viii) all associated works including SuDS, landscaping, planting and boundary treatments, infrastructure, lighting, foul/surface drainage, site works, necessary to facilitate the development. The residential element of Phase 2 is currently under construction and does not form part of this alteration's application. AI received 20/12/23…

Cut short by the council feed. Full text ↗

Summary from the register record.

Planning timeline
  1. 20 Dec 2023Received
  2. 25 Jan 2024Approved
  3. 5 Mar 2024Final approval
  4. 14 Apr 2026Building started

The site 2,934 m²

Boundary of Northwood Avenue from the planning application.

Planning applications inside the site 6 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála

Other big developments nearby within 2 km