52 Blackhall Place, Smithfield, Dublin 7

Approved in Mar 2024. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 16 Feb 2023Received
  2. 9 Feb 2024Approved
  3. 19 Mar 2024Final approval
  4. 19 Mar 2029Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Approved · 9 Feb 2024
Reference
3230/23
Received
16 Feb 2023
Further information
Requested 12 Apr 2023 · received 17 Jan 2024
Site
335 m²

What’s proposed

PROTECTED STRUCTURE: PERMISSION: The proposed development seeks permission for the change of use from enterprise use to education / office flexible use and the construction of a new external stair and lift core (58sqm) contained within a new glazed extension to the front façade of the original Methodist Hall building. The gross floor area of the building will increase by 89 sqm.

Show all

External works proposed to the building include: Existing timber canopy on steel columns and existing rendered external steps to front door to be removed; Square headed, timber panelled front door opening to be replaced with new door and entrance arrangement; Section of modern steel railing and gate on rendered plinth wall to be removed to front of building; Section of modern metal railings on plinth wall to courtyard to be replaced to match existing; Original proportions to 2no. existing first floor windows, on front and side elevations respectively, to be reinstated; Original proportions to 2no. existing first floor windows on front elevation to be reinstated and window openings extended to form new doorway access/egress in each case; Fabric removal from 1 no. existing doorway at upper ground floor level on front elevation to provide for wheelchair access/egress ; fabric removal from 2no. existing doorway at lower ground floor level on front elevation to provide for ambulant stair access/egress; Increase in height of existing external fire door on rear elevation; Removal of existing internal staircase and modern partition to south west corner of building at ground and first floor level; Partial roof removal and replacement with flat roof to accommodate plant enclosed by parapet wall; Roof structure / attic void to accommodate new water tank and air handling units; Installation of new WC facilities and internal stud wall partitions; 8no. new bicycle parking spaces and all other associated repair and refurbishment, site development, landscape and boundary works

22 other applications within 500 m in the last year

Open the report

Nearby 22 · 500 m · 12 months

Distance
Time
Show all 22

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z5 - DEV PLAN 2022-2028

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 4
    Diageo Ireland
  • NIAH-recorded building · 71
    quay/wharf; Rory O'More Bridge
  • Recorded monument · 26
    School; Building
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

3230/23 is a planning application to Dublin City Council for PROTECTED STRUCTURE: PERMISSION: The proposed development seeks permission for the, received on 16 Feb 2023; permission was granted on 9 Feb 2024.