PlanningRegister.ie
Dublin City Council · 3247/19

The Button Factory, Temple Bar Music Centre, Curved Street, Dublin 2

Approved, built and signed off.

  1. 13 Jan 2020Building started
  2. 11 Mar 2020Approved
  3. 6 Apr 2020Appealed
  4. 26 Aug 2020Signed off
  5. 1 Oct 2020Appeal: Approved with conditions
  6. 1 Oct 2020Final approval
Status
Building started
Decision
Approved · 11 Mar 2020
Council
Dublin City Council
Type
Permission
Site
654 m²
Appeal
ACP 307032 · Approved with conditions

Live near The Button Factory?

Everything else planned on your street, in one report.

Check my street

What’s proposed

PROTECTED STRUCTURE: Planning permission for development at The Button Factory, Temple Bar Music Centre, Curved St., Dublin 2. Part of Temple Bar Music Centre includes No. 11 Temple Lane South, a protected structure. The development will consist of the addition of a filled in floor at first floor level (127.4 m2) subdividing the existing auditorium into two event spaces; alterations to existing stairs from ground to first floor; and associated minor alterations

Planning details

Reference
3247/19
Local authority
Dublin City Council
Status
Commenced · register status “Appeal Decided”
Received
13 Jun 2019
Observations close
18 Jul 2019 (closed 2638 days ago)
Decision due
11 Mar 2020 · decided 11 Mar 2020
Decision
Grant permission on 11 Mar 2020
Proposed development
PROTECTED STRUCTURE: Planning permission for development at The Button Factory, Temple Bar Music Centre, Curved St., Dublin 2. Part of Temple Bar Music Centre includes No. 11 Temple Lane South, a protected structure. The development will consist of the addition of a filled in floor at first floor level (127.4 m2) subdividing the existing auditorium into two event spaces; alterations to existing stairs from ground to first floor; and associated minor alterations
As published by the register.
Site area
654 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 637 · 500 m · 5 years

Show all 637

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Appeal

ACP 307032 · Planning Appeal · decided · Approved with conditions 1 Oct 2020
received by the Commission 6 Apr 2020 · inspector's report · board order

Building started

  • 19 Jun 2020 · Builder told the council work was starting CN0065169DC
  • 13 Jan 2020 · Builder told the council work was starting CN0060625DC

Zoning

Zone Z5 - DEV PLAN 2022-2028

M2 — Major town centre

The main town centre — retail, offices, civic uses, apartments.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 299
    Yellow Brick Road; house
  • Radon risk area · 2
    About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument · 75
    Mural tower (Historic Town); Gateway

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

3247/19 is a planning application to Dublin City Council for PROTECTED STRUCTURE: Planning permission for development at The Button Factory, Temple, received on 13 Jun 2019; permission was granted on 11 Mar 2020.