PlanningRegister.ie
Dublin City Council · 4229/23

80 Leeson Street Upper, Dublin 4

Approved in Feb 2024. Building started in 2025.

  1. 27 Jul 2023Received
  2. 17 Jan 2024Approved
  3. 28 Feb 2024Final approval
  4. 28 Feb 2025Building started
Status
Building startedi
Decision
Approved · 17 Jan 2024
Council
Dublin City Council
Type
Permission
Site
272 m²

What’s proposed

PROTECTED STRUCTURE: The demolition of an existing non-historic two-storey extension & single storey boiler shed to the rear & the subsequent erection of a new part single-storey/part two-storey extension to the rear of the main house, external modifications to include re-pointing brick facades, refurbishment of existing windows & front door (to include slim line double glazing), replacement of 2 no. non-historic windows to the rear facade of the main house, replacement of non-historic secondary door to the front porch at the lower ground floor, at lower ground floor replacement of non-historic window to the front & historic window to the rear with new double doors, new balustrade to the centre of granite steps shared with No. 81 to match existing, internal modifications to existing layout at lower ground floor to include removal of 1 no. historic partition & the subsequent addition of new lightweight stud partitions which include the addition of a shower room, alterations to existing door opens including the widening of a single open to create a double ope,replacement of non-historic balustrade, internal modifications at first floor to include the removal of non-historic partitions & the subsequent addition of new lightweight stud partitions to facilitate 2 ensuites, 1 no. conservation roof light to the main house, 2 no. roof lights to new extension, installation of PV. Solar panels to the south-facing inner roof valley, calsitherm thermal insulation to the internal face of existing walls throughout, general restoration & decorations works, all associated site works to existing two-storey over basement terraced house. No. 80 Leeson Street Upper is a protected structure

Planning details

Reference
4229/23
Local authority
Dublin City Council
Status
Commenced · register status “Decision Notice Issued”
Received
27 Jul 2023
Decision due
19 Jan 2024 · decided 17 Jan 2024
Decision
Grant permission on 17 Jan 2024
Site area
272 m² from the mapped boundary, not the council's figure

Live near 80 Leeson Street Upper?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 26 · 500 m · 12 months

Distance
Time
Show all 26

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 28 Feb 2025 · Builder told the council work was starting (opted out of the finish sign-off) CN0125798DC

Zoning

Zone Z2 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

4229/23 is a planning application to Dublin City Council for PROTECTED STRUCTURE: The demolition of an existing non-historic two-storey extension &, received on 27 Jul 2023; permission was granted on 17 Jan 2024.