44 Leeson Park, Ranelagh, Dublin 6, D06 H2X2

Approved in Jul 2024. Building started in 2024.

  1. 10 Jan 2024Received
  2. 22 May 2024Approved
  3. 3 Jul 2024Final approval
  4. 21 Oct 2024Building started

Planning details

Status
Building startedi
Decision
Approved · 22 May 2024
Reference
3030/24
Received
10 Jan 2024
Further information
Requested 5 Mar 2024 · received 25 Apr 2024
Units
1
Site
376 m²

What’s proposed

PROTECTED STRUCTURE: two storey over basement terraced dwelling with four storey rear return and protected structure, ref. no. 4357. The development will consist of : conversion from 7 no self-contained dwelling units back to a single dwelling, refurbishment and repair of main house, restoration of existing fenestration throughout, repointing/repair works to brick and granite facades and chimneys, minor refurbishment…

Show all

of roof to include localized repairs to roof slates, flashings and rainwater goods, removal / replacement of non-original pvc rainwater goods and svp pipes to rear facades, replumbing and rewiring generally throughout, provision of new floor to lower ground floor, removal of single storey shed to the rear at lower ground floor level (7.7 sqm), removal of single storey ensuite return to the rear at lower ground floor level (2.4sqm), provision of new part single & part two storey extension to the rear at lower & upper ground floor levels (42sqm), formation of a new opening in the rear facade at lower ground floor level, formation of a new opening in the side of the rear return at lower ground floor level, enlargement of the existing opening between front and rear rooms at lower ground floor level, modifications to layout at lower ground floor level, replacement of non-original side entrance access door to the front at lower ground floor level, relocation of a window from the side of the rear return to the rear facade at lower ground floor level, relocation of a window from the side of the rear return to the rear facade at upper ground floor landing level replacement of a window to the rear facade at upper ground floor level with 1 no set of double doors, reinstatement of internal doors and fireplaces, conversion of rear bedroom to a dressing room at 1st floor level and modifications to layout, enlargement of existing opening between bedroom and dressing room at 1st floor level, repositioning of door opening to bedroom in rear return at 1st floor level, provision of new gates to the vehicular entrance existing opening, all associated ancillary, conversation, essential maintenance, landscaping and site development works

53 other applications within 500 m in the last year · 5 open for comments

Open the report

Nearby 53 · 500 m · 12 months

Distance
Time
Show all 53

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 21 Oct 2024 · Builder told the council work was starting (opted out of the finish sign-off) CN0120957DC

Zoning

Zone Z2 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • Recorded monument · 1
    House - 18th/19th century
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

3030/24 is a planning application to Dublin City Council for PROTECTED STRUCTURE: two storey over basement terraced dwelling with four storey rear, received on 10 Jan 2024; permission was granted on 22 May 2024.