St Patrick’s Cathedral, St Patrick's Close, Dublin, Dublin 8, D08 H6X3

Approved in Jan 2026. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 9 Oct 2025Received
  2. 2 Dec 2025Approved
  3. 14 Jan 2026Final approval
  4. 14 Jan 2031Approval runs out

Earlier approval here ran out with no sign of building: 3110/21 (2021)

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Approved · 2 Dec 2025
Reference
WEB5360/25
Received
9 Oct 2025
Site
8,049 m²

What’s proposed

PROTECTED STRUCTURE: We, the Board of St Patrick's Cathedral, intend to apply for permission for works at St Patrick's Cathedral, Minot Tower (Toilets), St. Patrick's Close, Dublin 8 (a protected structure RPS ref. no. 6443 & 6444 and a Recorded Monument DU018-020269). The works will include the following: 1.

Show all

Removal of all partitions and toilet fittings/fixtures from the disabled WC and three-cubicle unisex toilets. 2. Removal of tiled floor finish and installation of a new stone floor finish. 3. Removal of plasterboard wall linings to expose the historic masonry on the north, east and west walls, which will be finished with limewash. 4. Enclosure of the staff canteen staircase with fire-resistant partitions and fire doors. 5. Installation of four self-contained cubicles, one cleaner's store and one accessible WC and changing area, all with new fittings and fixtures. 6. Removal of modern oak and glass door assembly. 7. Removal of two steps, or recent construction to expose bases of medieval doorway and facilitate Installation of a new compliant ramp to replace the existing non-compliant ramp. 8. All new foul drainage to be connected to existing drains that run under the concrete slab, under the suspended ground floor of the Minot Tower. 9. All new extract to connect into existing ducting in the existing riser in the NW corner, that will be reduced in size

46 other applications within 500 m in the last year · 2 open for comments

Open the report

Nearby 46 · 500 m · 12 months

Distance
Time
Show all 46

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z8 - DEV PLAN 2022-2028

O2 — Green belt

Zoned to protect the open land between urban areas. Development is strongly resisted.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 60
    lamp standard; Donaghy & Dimond
  • Recorded monument · 132
    Mural tower (Historic Town); Gateway
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

WEB5360/25 is a planning application to Dublin City Council for PROTECTED STRUCTURE: We, the Board of St Patrick's Cathedral, intend to apply for, received on 9 Oct 2025; permission was granted on 2 Dec 2025.