PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 17:04

Colliers Avenue

53.32206, -6.25003

Homes here mostly date from before 1919. Home extensions nearby almost always get approved (93%). 6 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1900–1918 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
S5
Zoning · Sustainable neighbourhood infrastructure
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningS5 · Sustainable neighbourhood infrastructure
What it says

Z15: Community and Social Infrastructure: To protect and provide for community uses and social infrastructure.

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningS5 · Sustainable neighbourhood infrastructure
What it says

Z15: Community and Social Infrastructure: To protect and provide for community uses and social infrastructure.

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building6 within 100 m Sandford Park; (part of Sandford Park School); House (including steps, gates and railings)
Radon1 in 20 homes have high radon (EPA)

Not on this site: heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
Monuments2House - 16th/17th century; R149496
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 89–100% by type. A new house in a garden is harder: 72% approved, and 1 in 3 is asked for more information.

Single-storey rear151 decided · more info asked 10%
98% · council 97%
Two-storey rear90 decided · more info asked 27%
96% · council 96%
Two-storey side13 decided · more info asked 38%
100% · council 98%
Single-storey side16 decided · more info asked 19%
100% · council 99%
Attic or dormer171 decided · more info asked 13%
92% · council 96%
First-floor46 decided · more info asked 30%
89% · council 94%
Garage conversion15 decided · more info asked 7%
93% · council 99%
New house in a garden or site96 decided · more info asked 34%
72% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 598 nearby, 5,627 council-wide

Extensions and refusals right beside you 9 within 250 m · 0 refused within 100 m

Extensions and refusals near you 9 extensions within 250 m · the last 12 months

5 of 5 approved (100%) · most common: two-storey rear

5 approved4 no decision or withdrawn
KindAppliedApprovedRefused
Two-storey rear32—
Single-storey rear20—
Dormer or attic11—
First-floor11—
Garage conversion11—
Rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 76 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 134 days; Appeal window: 4 weeks; If appealed: +154 days; Building starts: 160 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=552)55 daysIf more info asked (1 in 6)With further information: median 134 days (n=123)134 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 154 days (n=218, all appeals within 1.5 km)+154 daysBuilding startsStart notice: median 160 days after permission (n=350)160 days after permissionSigned off496 days after the start, for the few who file. 58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated676 decided home extensions, 354 start notices, 218 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    28 of 93 appealed refusals became permissions. 7 of 134 appealed approvals were reversed.

    Refusals appealed93 decided
    28 became permissions
    Approvals appealed134 decided
    7 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 11 in the last 12 months

    None of 6 changed the council's decision

    • 501314 Refused · 9 Albany Road, Ranelagh, Dublin 6, D06 F9H6 · 460 m report
    • 502040 Pending · 97, Bunsen, Ranelagh, Saint Peter's, Dublin 6, D06 A0K7 · 213 m
    • 324224 Granted with conditions · 121-123 Ranelagh, Dublin 6 · 149 m report
    • 324275 Granted with conditions · Milltown Park, Sandford Road, Dublin 6, D06V9K7 · 419 m report
    • 501225 Granted · The Lower House, Gonzaga College, Sandford Road, Ranelagh, Dublin 6,… · 455 m report
    • 501252 Granted · 20, Bushfield Terrace, Donnybrook, Dublin 4, D04E0Y2 · 302 m report
    • 501723 Open · 36, Oakley Road, Dublin 6, D06 CA21 · 380 m
    • 501001 Refused · Rere of 65 Ranelagh, Dublin 6 · 299 m report
    • 501689 Pending · Rere of 65 Ranelagh, Dublin 6 (A Protected Structure RPS No. 6922) · 299 m
    • 500569 Granted with conditions · 4, Elmwood Avenue Lower, Dublin 6 · 415 m report
    • 500384 Granted with conditions · 39 Oakley Road, Dublin 6, Dublin, D06 RD93 · 379 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Colliers Avenue with 15 numbered planning items
    ⌖ the houseOpen for commentsDerelict buildingAppealBuilding startedApprovedNo decision yet
    1. 1Ranelagh Luas Stop, Ranelagh Road WEB3387/26No decision yet · 375 m
    2. 289 RANELAGH DUBLIN 6 D06K072 DS2044Derelict building · 252 m
    3. 3121-123 Ranelagh, Dublin 6 324224Appeal: approved with conditions · 149 m
    4. 412 Anna Villa, Dublin 6 2153/26Building started · 90 m
    5. 541 Mornington Road, Ranalagh WEB5647/25Building started · 157 m
    6. 653 Merton Drive, Dublin 6 WEB5561/25Building started · 164 m
    7. 749 Merton Drive, Dublin 6 WEB5947/25Building started · 181 m
    8. 812, Anna Villa WEB2153/26Approved · 83 m
    9. 956 Anna Villa, Ranelagh 5043/26Approved · 83 m
    10. 10Hermitage House, 7-9 Sandford Road 5126/26No decision yet · 104 m
    11. 11Mornington Lodge, 1a Ashfield Road WEB5581/25Approved · 169 m
    12. 1249, Merton Drive WEB5947/25Approved · 173 m
    13. 13109, Ranelagh WEB2516/26No decision yet · 185 m
    14. 14109 Marlborough Road, Ranelagh WEB1112/26Approved · 191 m
    15. 15101 Ranelagh, Dublin 6 WEB1588/26Approved · 204 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 160 permissions since 2016, 92 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

    229 applications lodged within 500 m. Council: 160 approved, 26 refused. After appeals: 160 approved. Of those: 4 signed off, 47 built with the owner's opt-out, 41 started, 68 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT160: lodged → approved26: lodged → refused25: lodged → withdrawn or invalid18: lodged → undecided157: approved → approved23: refused → refused25: withdrawn or invalid → withdrawn18: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal68: approved → no start notice found47: approved → built, owner opted out41: approved → started, not signed off4: approved → signed off229 lodged229 lodged160 approved160 approved26 refused26 refused25 withdrawn or invalid25 withdrawn or invalid18 undecided18 undecided160 approved160 approved24 refused24 refused26 withdrawn26 withdrawn19 undecided19 undecided68 no start notice found68 no start notice found47 built, owner opted out47 built, owner opted out41 started, not signed off41 started, not signed off4 signed off4 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured229 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    8 deadlines within 500 m; the first closes 2 Nov 2026.

    8 deadlines in the next 30 days: 2026-11-02 WEB3387/26: application received — The development will consist of replacement of the existing glazing, Luas signage, and the existing security shutter. Ot; 2026-11-04 WEB3037/26: REFUSE RETENTION PERMISSION — PROTECTED STRUCTURE; RETENTION PERMISSION; Planning permission for retention is sought at No. 20 Oakley Road, Ranelagh, ; 2026-11-06 WEB3043/26: ADDITIONAL INFORMATION — PROTECTED STRUCTURE: The application site is within the former Carroll's Building which is a Protected Structure (RPS Re; 2026-11-11 WEB3472/26: application received — PROTECTED STRUCTURE: The development will consist of refurbishment, repair and alteration works to the existing two-stor; 2026-11-13 WEB3488/26: application received — RETENTION PERMISSION The development consists of a 1.55m high wooden fence to conceal the existing 3no. 1100L waste bins; 2026-11-24 WEB3569/26: application received — PROTECTED STRUCTURE - Permission for development at No.21 Leeson Park, Ranelagh, Dublin 6, D06A2C5 (This building is a P; 2026-11-26 WEB3604/26: application received — 1/ reconfiguration of restaurant at ground floor, with take-away services 2/ change of use into 2- bedroom apartment at ; 2026-11-27 WEB3612/26: application received — PROTECTED STRUCTURE: Development at No.19 Leeson Park, Ranelagh, Dublin 6, D06X5Y0 (This building is a Protected Structutoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3387/26: application received — The development will consist of replacement of the existing glazing, Luas signage, and the existing security shutter. Ot · 375 m away · 2026-11-02WEB3037/26: REFUSE RETENTION PERMISSION — PROTECTED STRUCTURE; RETENTION PERMISSION; Planning permission for retention is sought at No. 20 Oakley Road, Ranelagh, · 375 m away · 2026-11-04WEB3043/26: ADDITIONAL INFORMATION — PROTECTED STRUCTURE: The application site is within the former Carroll's Building which is a Protected Structure (RPS Re · 375 m away · 2026-11-06WEB3472/26: application received — PROTECTED STRUCTURE: The development will consist of refurbishment, repair and alteration works to the existing two-stor · 375 m away · 2026-11-11WEB3488/26: application received — RETENTION PERMISSION The development consists of a 1.55m high wooden fence to conceal the existing 3no. 1100L waste bins · 375 m away · 2026-11-13WEB3569/26: application received — PROTECTED STRUCTURE - Permission for development at No.21 Leeson Park, Ranelagh, Dublin 6, D06A2C5 (This building is a P · 375 m away · 2026-11-24WEB3604/26: application received — 1/ reconfiguration of restaurant at ground floor, with take-away services 2/ change of use into 2- bedroom apartment at · 375 m away · 2026-11-26WEB3612/26: application received — PROTECTED STRUCTURE: Development at No.19 Leeson Park, Ranelagh, Dublin 6, D06X5Y0 (This building is a Protected Structu · 375 m away · 2026-11-27
    Comments closeTime to appeal ends
    • Comments close 2 Nov 20261 day left
      1WEB3387/26 · application received — The development will consist of replacement of the existing glazing, Luas signage, and the…
      €20 to the council · 375 m away
    • Time to appeal ends 4 Nov 20263 days left
      WEB3037/26 · REFUSE RETENTION PERMISSION — PROTECTED STRUCTURE; RETENTION PERMISSION; Planning permission for retention is sought at…
      €220 to An Coimisiún Pleanála (€110 observer) · 375 m away
    • Time to appeal ends 6 Nov 20265 days left
      WEB3043/26 · ADDITIONAL INFORMATION — PROTECTED STRUCTURE: The application site is within the former Carroll's Building which is a…
      €220 to An Coimisiún Pleanála (€110 observer) · 375 m away
    • Comments close 11 Nov 202610 days left
      WEB3472/26 · application received — PROTECTED STRUCTURE: The development will consist of refurbishment, repair and alteration works…
      €20 to the council · 375 m away
    • Comments close 13 Nov 202612 days left
      WEB3488/26 · application received — RETENTION PERMISSION The development consists of a 1.55m high wooden fence to conceal the…
      €20 to the council · 375 m away
    • Comments close 24 Nov 202623 days left
      WEB3569/26 · application received — PROTECTED STRUCTURE - Permission for development at No.21 Leeson Park, Ranelagh, Dublin 6,…
      €20 to the council · 375 m away
    • Comments close 26 Nov 202625 days left
      WEB3604/26 · application received — 1/ reconfiguration of restaurant at ground floor, with take-away services 2/ change of use into…
      €20 to the council · 375 m away
    • Comments close 27 Nov 202626 days left
      WEB3612/26 · application received — PROTECTED STRUCTURE: Development at No.19 Leeson Park, Ranelagh, Dublin 6, D06X5Y0 (This…
      €20 to the council · 375 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Derelict building 1

    • 289 RANELAGH DUBLIN 6 D06K072 · derelict since Aug 2025 · 252 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 28 and 42 a year; busiest 2023. 86% of decisions were approvals.

    2021: 37, 2022: 28, 2023: 42, 2024: 39, 2025: 35, 2026: 48010203040502021: 30 approved2021: 7 refused37’21*2022: 23 approved2022: 4 refused2022: 1 undecided28’222023: 35 approved2023: 6 refused2023: 1 withdrawn or invalid42’232024: 35 approved2024: 4 refused39’242025: 23 approved2025: 3 refused2025: 9 withdrawn or invalid35’252026: 14 approved2026: 2 refused2026: 15 withdrawn or invalid2026: 17 undecided48’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 58 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 25 in the last 12 months
    1 signed off as finished3 not signed off21 no sign-off needed
    • 102 Marlborough Road, Dublin 4 · 26 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · WEB2167/26 · 245 m
    • 12 The Orchard, Dublin 6, D06 T0F2 · 19 Oct 2026 · start notice, opted out no sign-off needed · 469 m
    • 20 Bushfield Terrace, Dublin 4, D04 E0Y2 · 7 Oct 2026 · short notice no sign-off needed · WEB1472/26 · 318 m
    • 8 Cherryfield Avenue Upper, Dublin 6, D06 X0C5 · 21 Sept 2026 · start notice, opted out no sign-off needed · 453 m
    • 32 Chelmsford Road, Dublin 6, D06 FV05 · 7 Sept 2026 · start notice, opted out no sign-off needed · WEB2197/26 · 433 m
    • 37/39 Ranelagh, Dublin 6, D06 W9E4 · 7 Sept 2026 · 7-day notice not signed off · WEB1835/26 · 429 m
    • 412 Anna Villa, Dublin 6, D06 ED79 · 31 Aug 2026 · short notice no sign-off needed · 2153/26 · 90 m
    • 122 Ranelagh, Dublin 6, D06 W2T3 · 25 Aug 2026 · start notice, opted out no sign-off needed · WEB2062/26 · 226 m
    • 653 Merton Drive, Dublin 6, D06 R6W3 · 10 Aug 2026 · start notice, opted out no sign-off needed · WEB5561/25 · 164 m
    • 749 Merton Drive, Dublin 6, D06 E177 · 3 Aug 2026 · short notice no sign-off needed · WEB5947/25 · 181 m
    • 109 Marlborough Road, Dublin 4, D04 V9T4 · 16 Jul 2026 · start notice, opted out no sign-off needed · WEB1112/26 · 203 m
    • 31 Mountain View Road, Dublin 6, D06 K5N3 · 6 Jul 2026 · start notice, opted out no sign-off needed · 3758/21 · 282 m
    • 79 Marlborough Road, Dublin 4, D04 DF20 · 19 Jun 2026 · short notice no sign-off needed · WEB5177/25 · 305 m
    • 541 Mornington Road, Ranalagh, Dublin 4, D06 WE51 · 28 May 2026 · short notice no sign-off needed · WEB5647/25 · 157 m
    • 102 Marlborough Road, Dublin, Dublin 4, D04 H5Y0 · 8 Apr 2026 · start notice, opted out no sign-off needed · WEB5127/25 · 245 m
    • Gonzaga College, Sanford Road, Dublin, Dublin 6 · 6 Apr 2026 · start notice not signed off · WEB2190/24 · 417 m
    • Mornington Road, Dublin, Dublin 6, D06 P3K2 · 6 Apr 2026 · start notice, opted out no sign-off needed · WEB5581/25 · 187 m
    • 31 Hollybank Avenue Lower, Ranelagh, Dublin 6, D06 A9C8 · 30 Mar 2026 · start notice, opted out no sign-off needed · WEB1055/25 · 345 m
    • 4 Sallymount Avenue, Dublin, Dublin 6, D06 A439 · 23 Mar 2026 · short notice no sign-off needed · WEB5411/25 · 450 m
    • 43 Mountain View Road, Ranelagh, Dublin 6, D06 K8X7 · 23 Mar 2026 · start notice, opted out no sign-off needed · 327 m
    • 59 Marlborough Road, Donnybrook, Dublin 4, D04 E7V2 · 4 Mar 2026 · 2 homes · 7-day notice not signed off · WEB5492/25 · 421 m
    • 122 Ranelagh, RANELAGH, Dublin 6, D06 W2T3 · 22 Dec 2025 · short notice no sign-off needed · WEB2550/24 · 226 m
    • 20 Moyne Road, Ranelagh, Dublin 6, D06 R2K1 · 25 Nov 2025 · start notice, opted out no sign-off needed · 3041/25 · 435 m
    • 13 Moyne Road, Dublin 6, D06 X560 · 21 Nov 2025 · start notice, opted out no sign-off needed · WEB2444/25 · 393 m
    • 8 Sandford Road, Dublin, Dublin 6, D06 R2H4 · 14 Nov 2025 · 3 homes · 7-day notice signed off · 170 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    • Unit A - D, 133 Upper Rathmines Road, Dublin 6 · Completed · 4 homes · 457 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Milltown Park636636 not started (2026-Q2)419 m
    Former Murphy and Gunn Site7474 not started (2026-Q2)767 m
    Gulistan Depot153no activity on site reported (2026-Q2)841 m
    St. Mary's Home6464 not started (2026-Q2)854 m
    Donnybrook4848 not started (2025-Q2)867 m
    Former Donnybrook Laundry38no activity on site reported (2026-Q2)867 m
    RTÉ Campus at Montrose511—911 m
    Montrose Block 5117—911 m

    Who applies most nearby

    • East Coast Inns Limited — 2 applications, latest 9 Oct 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Carr's Child and Family Services · Crèche26 Feb 2025 · report · Tusla Early Years Inspectorate375 m
    Naíonra Lios na nÓg · Crèche8 Sept 2025 · report · Tusla Early Years Inspectorate375 m
    Little Treasures Playschool · Crèche26 Feb 2025 · report · Tusla Early Years Inspectorate388 m
    Sharon's Playgroup & Montessori · Crèche27 Jan 2025 · report · Tusla Early Years Inspectorate541 m
    Leeson Park Creche & Montessori · Crèche20 Jan 2026 · report · Tusla Early Years Inspectorate763 m
    Willow House Montessori · Crèche27 Nov 2025 · report · Tusla Early Years Inspectorate780 m
    Naíonra Beag · Crèche6 Sept 2024 · report · Tusla Early Years Inspectorate815 m
    Belgrave Montessori School · Crèche8 Oct 2024 · report · Tusla Early Years Inspectorate930 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Quieter than most of Dublin City Council.
    Homes approved
    Here38
    Council middle50
    Homes started
    Here27
    Council middle73
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    70% of homes built before 1971 (council 52%). 61% owner-occupied (council 47%).

    Homes built before 1971
    70% · council 52%
    Homes built since 2001
    13% · council 19%
    Owner-occupied
    61% · council 47%
    Rented
    38% · council 45%
    Children under 15
    22% · council 15%
    Aged 65 and over
    10% · council 13%
    Households with 2+ cars
    23% · council 19%
    Work mainly from home
    19% · council 12%
    This small area (280 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268131010

    Bus
    126 m
    Sandford Road · 11, 44, 44D · busiest stop within 500 m: 21 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    37 m
    Sandford Park School Ltd, 437 pupils
    Homes sold nearby
    83
    in 3 years, 3 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Sandford Park School Ltd · postprimary · 437 pupils · 37 m
    • Sandford Parish National School · primary · 196 pupils · 181 m
    • Gaelscoil Lios na nOg · primary · 188 pupils · 451 m
    • S N Brighde · primary · 358 pupils · 480 m
    • Muckross Park College · postprimary · 709 pupils · 501 m
    • Gonzaga College · postprimary · 576 pupils · 585 m
    • Ranelagh Multi Denom Ns · primary · 221 pupils · 734 m
    • St Marys Central NS · primary · 587 pupils · 748 m

    Stops 56

    • Sandford Road · 11, 44, 44D · 126 m
    • Larch Grove · 11, 44, 44D · 5/hour at peak · 235 m
    • Hollybank Ave Lower · 11, 44, 44D · 4/hour at peak · 265 m
    • Ranelagh · 11, 44, 44D · 4/hour at peak · 289 m
    • Ranelagh · 11, 180, 44, 44D · 5/hour at peak · 324 m
    • Beechwood · Green · 20/hour at peak · 331 m
    • Beechwood · Green · 21/hour at peak · 339 m
    • Ranelagh · 11, 511, S2 · 7/hour at peak · 400 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Sandford Park School Ltd · 37 m+1.2% pupils (437)
    • Sandford Parish National School · 181 m-2% pupils (196)
    • Gaelscoil Lios na nOg · 451 m+6.2% pupils (188)
    • S N Brighde · 480 m-2.7% pupils (358)
    • Muckross Park College · 501 m-0.4% pupils (709)
    • Gonzaga College · 585 m+0.5% pupils (576) · an extension 2024, approved

    Open consultations

    Council meetings 19 items

    Public land

    • Railway Procurement Agency · 0.29 ha · 316 m
    • Railway Procurement Agency · 0.53 ha · 322 m
    • Railway Procurement Agency · 0.33 ha · 342 m
    • Dublin City Council · 1.75 ha · 485 m
    • Railway Procurement Agency · 0.16 ha · 497 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned S5 (sustainable neighbourhood infrastructure), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. Application 375 m away open for comments until 2 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Building work started 90 m away: for how long?
      Ask for: The planning conditions for 2153/26.
      Agent · council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Rathmines East D
    Electoral area
    Pembroke
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned S5 (sustainable neighbourhood infrastructure); not protected; no vacant land tax.
    • 1 site nearby could change: 1 derelict.
    • 6 applications open for comments nearby; nearest closes 2 Nov 2026.
    • Beechwood (Luas Green) 339 m away: 21 an hour at morning peak; 87 from all stops within 500 m.
    • Here (2022 census): 61% owner-occupied (council 47%); 4% of homes empty (council 8%); most built before 1919; 19% drive to work (council 28%).
    • 9 home extensions within 250 m since 2025: 5 approved (100%). Most were two-storey rear extensions.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • 6 appeals nearby decided in the last 12 months; none changed the council's decision.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 17:04 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.