M2 — Major town centredevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.
What that means: The main town centre — retail, offices, civic uses, apartments.
PROTECTED STRUCTURE: PROTECTED STRUCTURE. Repairs to roof and roof finishes, structures and rainwater goods, the rebuilding of a previously demolished chimney to its original scale and design on the east elevation, gable restoration on the west elevation, and some internal repairs to ceilings located directly below the roof and all associated and ancillary works and services. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref. no. P0301-04).
PROTECTED STRUCTURE: Planning Permission for the development at Merchants Court (the facade facing onto Merchant's Quay is a Protected Structure Ref 5083). The development provides for the following alterations to the rear of the building: 1) the addition of 2 no. external entrances to both side elevations at the rear. These will include 2 new glazed doors and 2 new windows. 2) the addition of a new external entrance ramp, steps and associated handrails/balustrading to the western elevation at the rear of the building. 3) The demolition of internal walls and screens to rear of property to facilitate the two proposed access points and circulation areas 4) associated internal works comprising steps and ramps to provide access from the building to adjoining courtyards
PROTECTED STRUCTURE: Planning Permission for the development at Merchants Court (the facade facing onto Merchant's Quay is a Protected Structure Ref 5083). The development provides for the following alterations to the rear of the building: 1) the addition of 2 no. external entrances to both side elevations at the rear. These will include 2 new glazed doors and 2 new windows. 2) the addition of a new external entrance ramp, steps and associated handrails/balustrading to the western elevation at the rear of the building. 3) The demolition of internal walls and screens to rear of property to facilitate the two proposed access points and circulation areas 4) associated internal works comprising steps and ramps to provide access from the building to adjoining courtyards
WEB2509/26received 17 Jun 2026decided 18 Jun 2026359 m away
The refurbishment and change of use of existing buildings from commercial/light industrial to use as an immersive arts centre with complementary educational facilities focusing on audiovisual technology at 10 and 11 Ushers Island, Dublin 8. The main entrance to the immersive arts centre will be from Ushers Island, while the entrance to the educational facility will be from Island Street, to the rear. The development will include; (i) Alteration of quay-front facades to nos 10 and 11, including a new glazed single storey public entrance at number 10 with glazed canopy and the façade refurbishment of no 11, to include; the rendering of the existing elevational non-original tile cladding (no 11); new windows and doors in existing openings (no 11); new granite steps, ramp and low boundary plinth (nos 10,11); new external metal railings at entrance area (no 10) to side boundary at the adjoining site (no 9) and new external signage to no 11.
(ii) Alteration of the rear façade to no 10 at Island Street, including a new metal gate and new render to existing walls and a new planted courtyard containing bicycle and bin storage facilities. (iii) Reinstatement of the first-floor to the rear of number 10, with replacement walls and flat roof, where the original roof was previously removed, and only remnants of the first-floor walls currently remain.
WEB1262/26received 9 Feb 2026decided 2 Apr 2026322 m away
The refurbishment and change of use of existing buildings from commercial/light industrial to use as an immersive arts centre with complementary educational facilities focusing on audiovisual technology at 10 and 11 Ushers Island, Dublin 8. The main entrance to the immersive arts centre will be from Ushers Island, while the entrance to the educational facility will be from Island Street, to the rear.
The development will include; (i) Alteration of quay-front facades to nos 10 and 11, including a new glazed single storey public entrance at number 10 with glazed canopy and the façade refurbishment of no 11, to include; the rendering of the existing elevational non-original tile cladding (no 11); new windows and doors in existing openings (no 11); new granite steps, ramp and low boundary plinth (nos 10,11); new external metal railings at entrance area (no 10) to side boundary at the adjoining site (no 9) and new external signage to no 11. (ii) Alteration of the rear façade to no 10 at Island Street, including a new metal gate and new render to existing walls and a new planted courtyard containing bicycle and bin storage facilities. (iii) Reinstatement of the first-floor to the rear of number 10, with replacement walls and flat roof, where the original roof was previously removed, and only remnants of the first-floor walls currently remain.
WEB1241/26received 5 Feb 2026decided 9 Feb 2026322 m away
The refurbishment and change of use of existing buildings from commercial/light industrial to use as an immersive arts centre with complementary educational facilities focusing on audiovisual technology at 10 and 11 Ushers Island, Dublin 8. The main entrance to the immersive arts centre will be from Ushers Island, while the entrance to the educational facility will be from Island Street, to the rear.
The development will include;
(i) Alteration of quay-front facades to nos 10 and 11, including a new glazed single storey public entrance at number 10 with glazed canopy and the façade refurbishment of no 11, to include; the rendering of the existing elevational non-original tile cladding (no 11); new windows and doors in existing openings (no 11); new granite steps, ramp and low boundary plinth (nos 10,11); new external metal railings at entrance area (no 10) to side boundary at the adjoining site (no 9) and new external signage to no 11.
(ii) Alteration of the rear façade to no 10 at Island Street, including a new metal gate and new render to existing walls and a new planted courtyard containing bicycle and bin storage facilities.
(iii) Reinstatement of the first-floor to the rear of number 10, with replacement walls and flat roof, where the original roof was previously removed, and only remnants of the first-floor walls currently remain.
WEB1219/26received 3 Feb 2026decided 5 Feb 2026322 m away
The proposed development comprises site clearance works, including the demolition of all existing buildings / structures on site, including the existing boundary wall and gates along the Thomas Street frontage, and the construction of a new Part 1-; Part 3-; Part 4-; Part 5-; Part 6-storey Aparthotel building with a total Gross Floor Area of 5,152 sq.m (GIA) together with the formation of a new vehicular access and ramp off Thomas Street leading to a loading bay / service area at the rear of the proposed building. The ground floor level will accommodate 12 no. cycle parking spaces for staff and staff changing rooms / showers; ancillary plant and storage rooms; waste/refuse storage facilities and an ESB sub-station and switchroom. The proposed aparthotel reception area (188 sq.m) at ground floor level will be accessed off Thomas Street along with a Café of 52 sq.m that is provided along the Thomas Street frontage at ground floor level. Aparthotel rooms / suites are provided at ground to fourth floor level (80 no. self-contained / self-catering units). At fifth floor level, a public bar / event space (225 sq.m) with south facing roof terrace is provided. Other site works include the provision of hard and soft landscaping measures to ancillary amenity spaces. The proposed building incorporates sustainable drainage measures that includes green roofs and underground attenuation tank. Screened plant is provided at rooftop level.
WEB1165/26received 27 Jan 2026decided 20 May 2026174 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 53 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
National College of Art and Design — Dublin city and suburbs
1.51 ha6 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.26 hafolio DN118166F69 m awayas of 1 Apr 2023
The Digital Hub Development Agency — Dublin city and suburbs
0.97 hafolio DN184750F122 m awayas of 1 Apr 2023
The Office of Public Works — Dublin city and suburbs
0.51 ha165 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.18 hafolio DN173411F170 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.79 ha173 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.38 ha217 m awayas of 1 Apr 2023
The Digital Hub Development Agency — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 10:58 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.