Amiens Street
What closes soonest 1 open window
- Judicial review window closes 8 Oct 202625 days leftGrant permission with conditions8 weeks from the Commission's decision (13 Aug 2026) · s.50 Planning and Development Act 2000 · 113 m away
Where this is
- Settlement
- Dublin city and suburbs
- Electoral division
- Mountjoy A
- Local electoral area
- North Inner City
- Local authority
- Dublin City Council
- Parcel
- Tailte Éireann 6224892 (leasehold), 109 m²
Census 2022, small area 268104001
4.5% owner-occupied, 60.7% privately rented, 3.6% social. Vacancy 5%.
Zoning evaluated against the point
Zone Z5 - DEV PLAN 2022-2028
Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.
What that means: The main town centre — retail, offices, civic uses, apartments.
Source: zoning · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 | open |
Designations and constraints within 500 m
| Designation | Count | Examples |
|---|---|---|
| NIAH-recorded building | 256 | George's Dock Bridge; 'Famine'; CHQ Building |
| Radon risk area | 1 | About 1 in 20 homes in this area is likely to have high radon levels |
| Recorded monument | 18 | Hospital; Quay; Windmill |
Sources: constraints, constraints.flood_cfram, constraints.flood_nifm, constraints.niah, constraints.radon, constraints.smr · fetched 11 Sept 2026, 19:11
| Source | Licence | Fetched | Link |
|---|---|---|---|
| constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 | open |
| constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.flood_nifm | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.niah | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.smr | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
Residential Zoned Land Tax
This site is not on the current draft or final RZLT map.
Source: rzlt · fetched 12 Sept 2026, 00:23
| Source | Licence | Fetched | Link |
|---|---|---|---|
| rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 | open |
Planning applications 190 in 5 years within 500 m
Recent decisions and applications
- 1, 3, 5, 7, 9 Tara Street Dublin 2 and 5, 6 & 7 George's Quay, Dublin 2 Registered ApplicationWe, Greybirch Limited, intend to apply for planning permission at this site, of c. 0.1346 ha, at Nos. 1, 3, 5, 7, 9 Tara Street, Dublin 2 and Nos. 5, 6, 7 George’s Quay, Dublin 2. The proposed development will amend DCC Reg Ref 5042/22 and will include • Demolition of Nos. 5, 6, 7 George’s Quay and replacement with a new two storey building, which includes a retractable roof. • The omission of the roof garden and minor alterations to the elevations on the retained and refurbished Tara Street buildings. • Reduction in the number of permitted concessions from 13 no. units to 9 no. units. • Omit permitted basement extension, resulting in no changes to the existing basement. The proposal also includes all associated works to enable the development of the proposal. The remainder of the development will remain as permitted by Reg. Ref. 5042/22.
- Citigroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. D01 T8Y1 Registered ApplicationWe, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: • Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; • The resulting proposed extended development (c. 60,119 sq.m) ranges in height from 6 no. to 12 no. storeys in height over existing basement comprising office accommodation, 2 no. hotels, a retail/café unit and a community space; • The proposed development comprises 4 no. blocks: o Block A (6-11 storeys) comprises office accommodation. o Block B (12 no. storeys) comprises office accommodation. o Block C (10 storeys) will comprise a hotel with 201 no. bedrooms; o Block D (6-7 storeys) will comprise a hotel with 135 no. bedrooms; o It is noted that there will be a change of use of part of the existing retained floor area from office to hotel (c. 12,847 sqm) to accommodate the proposed hotels. • 1 no. retail/cafe unit (91 sq.m) is provided within Block D at ground floor level; • 1 no. internal community space (654 sq.m) is provided at ground floor level; • A shared entrance for Blocks C and D; • Provision of a shared atrium between Block C and Block D; • Outdoor terraces at 5th, 6th, 7th, 9th, and 11th floor levels; • Green roofs and blue roofs are provided across the scheme; • 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; • 456 no. bicycle spaces (inc. and 4 no. motorcycle spaces are proposed at basement level; • 18 no. short-stay bicycle space (9 no. Sheffield stands) are proposed at surface level; • The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sq.m) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay; • Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; • All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.
- 1, 3, 5, 7, 9 Tara Street & 5, 6, 7 George's Quay, Dublin 2 Application declared invalidWe, Greybirch Limited, intend to apply for planning permission at this site, of c. 0.1346 ha, at Nos. 1, 3, 5, 7, 9 Tara Street, Dublin 2 (D02X995, D02EP64, D02YD53, D02YD52, D02Y662, D02F991) and Nos. 5, 6, 7 George’s Quay, Dublin 2, (D02FR63, D02KW29). The proposed development will amend DCC Reg Ref 5042/22 and will include • Demolition of Nos. 5, 6, 7 George’s Quay and replacement with a new two storey building, which includes a retractable roof. • The omission of the roof garden and minor alterations to the elevations on the retained and refurbished Tara Street buildings. • Reduction in the number of permitted concessions from 13 no. units to 9 no. units. • Omit permitted basement extension, resulting in no changes to the existing basement. The proposal also includes all associated works to enable the development of the proposal. The remainder of the development will remain as permitted by Reg. Ref. 5042/22.
- Citigroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1 The site is bound by North Wall Quay to the South, Commons Street to the West, Clarion Quay/Alderman Way to the North and an access ramp to the existing basement to the East., D01 T8Y1 Application declared invalidWe, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: • Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; • The resulting proposed extended development (c. 60,119 sq.m) ranges in height from 6 no. to 12 no. storeys in height over existing basement comprising office accommodation, 2 no. hotels, a retail/café unit and a community space; • The proposed development comprises 4 no. blocks: o Block A (6-11 storeys) comprises office accommodation. o Block B (12 no. storeys) comprises office accommodation. o Block C (10 storeys) comprises a hotel with 201 no. bedrooms. o Block D (6-7 storeys) comprises a hotel with 135 no. bedrooms. • 1 no. retail/cafe unit (91 sq.m) is provided within Block D at ground floor level; • 1 no. internal community space (654 sq.m) is provided at ground floor level; • A shared entrance for Blocks C and D; • Provision of a shared atrium between Block C and Block D; • Outdoor terraces at 5th, 6th, 7th 9th, and 11th floor levels; • Green roofs and blue roofs are provided across the scheme; • 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; • 456 no. bicycle spaces (inc. and 4 no. motorcycle spaces are proposed at basement level; • 18 no. short-stay bicycle space (9 no. Sheffield stands) are proposed at surface level; • The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sq.m) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay; • Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; • All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.
- Unit 1, Talbot Mall, Talbot Street, Dublin 1 Registered ApplicationThe erection of a new operator signage on the fascia and three clipper frame signs on the interior of the windows. The development includes all works associated with the proposed development.
- 1, George's Dock, I.F.S.C., Dublin 1 Grant retention permissionRETENTION: The development consists of retention of a rooftop solar installation constructed in departure from the details of approved planning application Reg. Ref.: 4220/24. The total solar panel area of the installation is 316.3 sq.m.
- College House, College Square, Townsend Street, Dublin 2 Grant permissionThe College Square development is located onto Townsend St, Tara Street, Poolbeg Street & Theatre Royal Way, Dublin 2. The proposed development relates to a temporary five-year permission for: • 1 no. ‘LED Wall’ comprising the installation of a transparent LED film onto the internal façade at ground level of the existing venue reception unit located on the south and south-east elevations onto Townsend St and Theatre Royal Way. The ‘LED Wall’ has an overall area of 7.45m x 21.92m and will display soft moving imagery related to Workday only. • 1 no. ‘LED Wall’ comprising the installation of a transparent LED film onto the internal façade at ground level of the existing office reception located on the north and north-west elevations onto Poolbeg St and Theatre Royal Way. The ‘LED Wall’ has an overall area of 7.45m x 10.12m and will display soft moving imagery related to Workday only.
- The Glen, 84, Gardiner Street Lower, Dublin 1 Grant permissionPROTECTED STRUCTURE: (i) Carry out brick mortar repairs to badly spalled brickwork; (ii) Treatment and steam clean front parapet capping, granite window cills, brick facade and entrance steps in order to remove algae and carbon and/or paint; (iii) Granite plinth, dividing wall capping and granite string course – paint to be removed and surface to be treated and steamed clean. Joints to be raked out and repointed using natural hydraulic lime in a flush joint; and (iv) Lower Ground Floor, paint finish to be removed and wall finish to be lime plastered using natural hydraulic lime in a lined & ruled finish.
- 6-12 (inclusive) Sackville Place, & 107a Marlborough Street, Dublin 1 Grant permissionThe development will consist of modifications to the permitted tourist hostel granted under planning Ref. 3781/23, as modified by planning Ref. ABP-319219-24 (Ref. 4887/23) and Ref. 2110/25. The development will consist of the provision of 2 no. smoke ventilation shaft outlets at roof level.
- Hilton Garden Inn Hotel, Custom House Quay, North Wall, Dublin 1, D01V9X5 Grant permissionPermission for the display of advertisements and the installation of awnings, planters and wind breakers in the assembly of a new outdoor dining area. Advertisements to consist of 2no. double sided projecting signs with internal static face illumination, affixed to the building facade.
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
Source: npad · fetched 13 Sept 2026, 20:39
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 13 Sept 2026, 20:39 | open |
Appeals 32 in 5 years within 500 m
- ACP 500887 on WEB5358/25 Granted with conditions
- ACP 324028 on 4674/22 Refused
- ACP 323120 on WEB2729/24 Refused
- ACP 501651 on WEB6103/25 Open
- ACP 501632 on WEB1480/26 Open
- ACP 501478 on WEB1608/26 Pending
- ACP 321501 on FRG2105024DC Refused
- ACP 323272 on RZLT000259 Other
- ACP 314724 Other
- ACP 319719 on 3274/24 Refused
Source: acp · fetched 12 Sept 2026, 00:05
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 12 Sept 2026, 00:05 | open |
Commencement notices 63 in 3 years within 500 m
- 22/23 Talbot Street, Dublin 1, D01 DW02 — Commencement notice
- 111 Talbot Street, Dublin 1, D01 H0F4 — Commencement notice
- 2 Connolly Station, Dublin 1, D01 H592 — Seven day notice
- 24/26 City Quay, Dublin, Dublin 2, D02 NY19 — Short commencement notice
- Custom House Quay, Dublin, Dublin 1, D01 Y6H7 — Seven day notice
- 27-32 Talbot Street, Dublin 1, D01 A6F4 — Commencement notice
- 64 Sráid Ghairdinéir Íochtarach, Dublin 1, D01 V8P5 — Short commencement notice
- Building East, WWRC Quayside Building, Custom House Quay, Dublin 1, Dublin, Dublin 1, D01 KF84 — Commencement notice
- George's Quay, Dublin, Dublin 2, D02 Y098 — Seven day notice
- 5 George's Dock, Dublin 1, D01 X8N7 — Short commencement notice
One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).
Source: bcms · fetched 13 Sept 2026, 23:40
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 13 Sept 2026, 23:40 | open |
Sales 66 in 36 months within 500 m
€135,000 – €1,020,000, 1 Dec 2023 to 24 Jul 2026.
| Address | Sold | Price | Asking | Type | Beds | m² | €/m² | BER | Dist. |
|---|---|---|---|---|---|---|---|---|---|
| 96 SPENCER HOUSE, CUSTOM HOUSE SQ, MAYOR ST LOWER DUBLIN 1 | 24 Jul 2026 | €550,000 | €495,000 | Apartment | 3 | 77 | 7,143 | C2 | 477 m |
| 273 CUSTOM HOUSE HARBOUR, CUSTOM HOUSE QUAY, DUBLIN 1 | 22 Apr 2026 | €675,000 | €675,000 | Apartment | 3 | 125 | 5,400 | D1 | 241 m |
| 80 CUSTOM HALL, DEVERELL PLACE, DUBLIN 1 | 24 Mar 2026 | €365,000 | €345,000 | Apartment | 2 | 58 | 6,293 | D2 | 386 m |
| 128 CUSTOM HALL, LOWER GARDINER ST, DUBLIN 1 | 17 Dec 2025 | €380,000 | €345,000 | Apartment | 2 | 46 | 8,261 | C2 | 420 m |
| APT 12, MOLAND HOUSE, TALBOT ST | 18 Nov 2025 | €303,000 | — | Apartment | 1 | 52 | 5,827 | C3 | 346 m |
| 24 THE MILLHOUSE BLOCK C, THE STEELWORKS, FOLEY ST DUBLIN 1 | 13 Nov 2025 | €387,000 | €370,000 | Apartment | 2 | 60 | 6,450 | B2 | 227 m |
| 21 GLOUCESTER SQ, RAILWAY ST, DUBLIN 1 | 31 Oct 2025 | €435,000 | €435,000 | Apartment | 2 | — | — | C2 | 366 m |
| 44 LIBERTY CORNER, JAMES JOYCE ST, DUBLIN 1 | 30 Oct 2025 | €305,000 | €250,000 | Apartment | 1 | 44 | 6,932 | C3 | 252 m |
| APT 118, CUSTOM HOUSE HARBOUR, IFSC DUBLIN 1 | 15 Oct 2025 | €408,000 | €385,000 | Apartment | 2 | 60 | 6,800 | B3 | 344 m |
| APT 311 TALBOT HALL, TALBOT ST, DUBLIN 1 | 15 Oct 2025 | €273,000 | €285,000 | Apartment | 1 | 56 | 4,875 | D2 | 316 m |
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Sources: cara_listings, ppr · fetched 11 Sept 2026, 20:14
| Source | Licence | Fetched | Link |
|---|---|---|---|
| cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 | open |
| ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 13 Sept 2026, 20:32 | open |
Consultations 4 matched by place
- Public Participation in the Identification of New Bathing Waters 11 days left
- iMEND 1 - Portobello Community Engagement 18 days left
- Lansdowne Valley Park Active Travel Scheme 24 days left
- Dublin District Heating Project Part 8 37 days left
Source: consult · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| consult | public | 12 Sept 2026, 02:04 | open |
Council items 10 in 24 months
- With reference to the Extinguishment of Public Right of Way at Rutland Cottages, Dublin 1
- Report No. 181/2026 of the A/Executive Manager (S. Hennessy) - With reference to Disposal of a site at Church Street Upper and Brunswick Street North, D7 to Brunswick North Regeneration Limited.
- With reference to the disposal of a site at Church Street Upper and Brunswick Street North, Dublin 7 to Brunswick North Regeneration Limited
- Report No. 150/2026 of the Executive Manager (D. O'Connor) - With reference to the proposed grant of a 3-year lease of the premises at Liberty Corner (Retail Unit No.7), James Joyce Street, Dublin 1 to Wexford Centre Project CLG.
- Report No. 150/2026 of the Executive Manager (D. O'Connor) - With reference to the proposed grant of a 3-year lease of the premises at Liberty Corner (Retail Unit No.7), James Joyce Street, Dublin 1 to Wexford Centre Project CLG.
- Report No. 149/2026 of the Executive Manager (D. O'Connor) - With reference to the grant of a further licence of site at Lourdes Parish Hall, Rutland Street, Dublin 1
- COUNCILLOR NIAL RING To ask the Area Manager to provide a comprehensive, audited list and a localised analysis of specific state-supported and community service facilities currently operating within the North Inner City and rest of the Central Area. Specifically, could the Manager provide: a. A complete breakdown of all such facilities located within the Central Area, itemised by
- With reference to the proposed grant of a 3-year lease of the premises at Liberty Corner (Retail Unit No.7), James Joyce Street, Dublin 1 to Wexford Centre Project CLG.
- With reference to the grant of a further licence of site at Lourdes Parish Hall, Rutland Street, Dublin 1 to Francesca Arkins, Alysia Arkins and Christy Fagan.
- With reference to the proposed grant of a 3-year lease of the premises at Liberty Corner (Retail Unit No.7), James Joyce Street, Dublin 1 to Wexford Centre Project CLG.
Source: moderngov · fetched 13 Sept 2026, 21:50
| Source | Licence | Fetched | Link |
|---|---|---|---|
| moderngov | public | 13 Sept 2026, 21:50 | open |
Capacity and public land
No publishable utility-capacity record within the radius. 80 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
- Dublin Docklands Development Authority — Dublin city and suburbs
- Córas Iompair Éireann — Dublin city and suburbs
- Dublin Docklands Development Authority — Dublin city and suburbs
- Dublin Docklands Development Authority — Dublin city and suburbs
- Dublin Docklands Development Authority — Dublin city and suburbs
- Dublin Docklands Development Authority — Dublin city and suburbs
- Dublin Docklands Development Authority — Dublin city and suburbs
- Dublin Docklands Development Authority — Dublin city and suburbs
Sources: esbn, lda_lands · fetched 11 Sept 2026, 16:42
| Source | Licence | Fetched | Link |
|---|---|---|---|
| esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only | 11 Sept 2026, 16:42 | open |
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
Schools and public transport within 1.0 km
Schools
- CENTRAL INFS SCHOOL
- CENTRAL SENIOR MXD N S
- CITY QUAY NS
- RUTLAND NATIONAL SCHOOL
- SCOIL CHAOIMHIN
- Larkin Community College
- AN TAONAD REAMHSCOILE
- St Laurence O'Toole's National School
Stops 182 · routes 1, 100X, 101, 101X, 103, 103X, 105X, 109, 109A, 109B, 109X, 11, 111, 111X, 115, 115C, 115X, 116, 118, 11B, 120, 120A, 120B, 120E, 120F, 120X, 122, 126, 126A, 126B, 126D, 126E, 126N, 126T, 126U, 126X, 13, 130, 130A, 132, 133, 14, 142, 15, 150, 151, 15A, 15B, 15D, 16, 16D, 179, 180, 19, 191, 193, 194, 2, 22, 23, 24, 245X, 27, 27A, 27B, 27X, 29n, 30, 300, 31n, 32, 32X, 33, 33D, 33E, 33X, 33n, 37, 38, 38A, 38B, 38D, 39, 39A, 39X, 4, 40D, 41, 41B, 41C, 41D, 41X, 42, 42n, 43, 44, 44D, 46n, 47, 49n, 500, 500N, 500X, 501, 502, 503, 505, 505X, 506, 506X, 507, 51D, 52, 53, 56A, 6, 60, 600, 65, 65B, 660, 68, 68A, 69, 69X, 69n, 7, 70, 700, 700X, 702, 704x, 705x, 707, 70n, 717, 721, 73, 735, 736, 74, 740, 740A, 740X, 761, 763, 77A, 77X, 77n, 782, 783, 784, 785, 7A, 7B, 7D, 7E, 7n, 80, 82, 836, 845, 847, 84n, 853, 860, 870, 88n, 900, 901, 901M, 910, 912, 932, 932A, 933, 933A, 980, 980A, 980B, C1, C2, C3, C4, C5, C6, Commuter, DART, E1, E2, F1, F2, F3, G1, G2, GD01, GD02, Green, H1, H2, H3, NX, P29, Red, X1, X2, X25, X26, X27, X28, X30, X31, X32, rail
- Busáras
- Busáras
- Connolly Station
- Connolly Stn
- Dublin Busáras
- Dublin Busáras
- Busáras
- Connolly Stn
Sources used in this report
| Section | Source | Licence | Fetched |
|---|---|---|---|
| Location | places | CC-BY-4.0 | 11 Sept 2026, 21:28 |
| Parcel | parcels | CC-BY-4.0 | 11 Sept 2026, 19:06 |
| Zoning | zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 |
| Constraints | constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 |
| Constraints | constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable, flag only | 11 Sept 2026, 19:11 |
| Constraints | constraints.flood_nifm | CC-BY-NC-ND-4.0 · not redistributable, flag only | 11 Sept 2026, 19:11 |
| Constraints | constraints.niah | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.smr | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Rzlt | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
| Planning | npad | CC-BY-4.0 | 13 Sept 2026, 20:39 |
| Appeals | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Commencements | bcms | CC-BY-4.0 | 13 Sept 2026, 23:40 |
| Sales | cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 |
| Sales | ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 13 Sept 2026, 20:32 |
| Consultations | consult | public | 12 Sept 2026, 02:04 |
| Council items | moderngov | public | 13 Sept 2026, 21:50 |
| Capacity | esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only | 11 Sept 2026, 16:42 |
| Public land | lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 |
| Projects | social_housing | CC-BY-SA-4.0 | 11 Sept 2026, 20:13 |
| Amenities | gtfs | CC-BY-4.0 | 11 Sept 2026, 19:16 |
| Amenities | schools | CC-BY-4.0 | 11 Sept 2026, 16:41 |
| Deadlines | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Deadlines | consult | public | 12 Sept 2026, 02:04 |
| Deadlines | moderngov | public | 13 Sept 2026, 21:50 |
| Deadlines | npad | CC-BY-4.0 | 13 Sept 2026, 20:39 |
| Deadlines | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
Generated 14 Sept 2026, 00:52 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.