Planning report · Meath County Council · 2000 m around the house · the last 12 months · 13 Oct 2026, 13:59

Clonee Road

53.40538, -6.45080

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (95%). 810 homes approved 1.8 km away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  • 13 Nov 2017 · notice that building work was starting · signed off as finished sep 2019
  • 20 Oct 2017 · notice that building work was starting · signed off as finished nov 2018
  • 26 Sept 2017 · notice that building work was starting · signed off as finished oct 2024
  • 12 Jul 2017 · notice that building work was starting · signed off as finished nov 2017
  • 7 Mar 2017 · notice that building work was starting · not signed off as finished (no completion certificate on file)
  • 31 Oct 2016 · notice that building work was starting · signed off as finished sep 2017
  • 11 May 2016 · notice that building work was starting · not signed off as finished (no completion certificate on file)
  • 8 Feb 2016 · notice that building work was starting · not signed off as finished (no completion certificate on file)
  • 30 May 2014 · notice that building work was starting · not signed off as finished (no completion certificate on file)
On this site
P5
Zoning · Rural and agricultural
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningP5 · Rural and agricultural
What it says

RA - Rural Area: Rural Area

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

meath county development plan 2021 2027 · 3 Nov 2021 – 2 Nov 2027

ZoningP5 · Rural and agricultural
What it says

RA - Rural Area: Rural Area

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

meath county development plan 2021 2027 as varied · 3 Nov 2021 – 2 Nov 2027

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 2.0 kmCountFor example
Licensed industrial sites5Astellas Ireland Company Limited; Guerbet Ireland Unlimited Company
Landslide risk areas1M3 J4 Clonee 2014
Heritage inventory buildings9Barnhill Bridge; Phibblestown House
Radon grid squares20
Protected buildings2Phibblestown House; Barnhill Bridge
Monuments70Ring-ditch; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 46 on the draft 2027 map; 42 on the final 2026 map.
Sources: zoning, constraints.radon, rzlt, constraints, constraints.epa_licence, constraints.flood_cfram, constraints.flood_nifm, constraints.landslide, constraints.niah, constraints.rps, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.epa_licenceCC-BY-4.027 Sept 2026, 19:36open
constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.flood_nifmCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.landslidepublic (Geological Survey Ireland)27 Sept 2026, 19:36open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.rpsCC-BY-4.0 (Fingal); public/attribution, unconfirmed (DLR)27 Sept 2026, 19:36open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 13 Oct 2026, 00:21
SourceLicenceFetchedLink
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–100% by type. A new house in a garden is harder: 86% approved.

Single-storey rear18 decided · more info asked 0%
94% · council 98%
Single-storey side12 decided · more info asked 0%
100% · council 97%
Attic or dormer85 decided · more info asked 13%
94% · council 92%
New house in a garden or site7 decided · more info asked 0%
86% · council 78%
Approved nearbyMeath overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 122 nearby, 4,675 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 50 days. 1 in 10 is asked for more information, which adds about 57 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 10): 108 days; Appeal window: 4 weeks; Building starts: 78 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 47–53 (n=141)50 daysIf more info asked (1 in 10)With further information: median 108 days (n=10)108 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 78 days after permission (n=47)78 days after permissionSigned off40% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated157 decided home extensions, 47 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    3 of 11 appealed refusals became permissions. 2 of 8 appealed approvals were reversed.

    Refusals appealed11 decided
    3 became permissions
    Approvals appealed8 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 9 in the last 12 months

    None of 1 changed the council's decision

    • 324526 Pending · Barnhill, Dublin 15 · 1.9 km
    • 324511 Pending · Lands at Barnhill, Dublin 15 · 1.8 km
    • 324524 Pending · Lands at Barnhill, Dublin 15 · 1.7 km
    • 501128 Granted · 32 Rusheeney Way, Rusheeney Village, Dublin 15, D15 T6X8 · 2.0 km report
    • 501673 Pending · 66 Latchford Park, Castaheany, Dublin 15, D15KW22 · 1.7 km
    • 501384 Invalid · 9 Main Street, Ongar Village, Dublin 15. · 1.3 km
    • 324232 Pending · 11 Latchford Drive, Castaheany, Dublin 15, D15W26K · 1.4 km
    • 324061 Pending · No. 60 Manorfields Avenue, Clonee, Dublin 15, D15X3E7 · 1.9 km
    • 323881 Pending · Littlepace Shopping Centre, Clonee, Co. Dublin · 1.6 km
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved13 Oct 2026, 01:30open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 4

    What's changing around you?

    Street map around Clonee Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingBuilding site that stoppedApproved, not startedEmpty land zoned for homes
    1. 111 Beechfield Heights, Castaheany FW26A/0377ENo decision yet · 880 m
    2. 2No25 Kribensis Manor, Williamstown Stud 2661199No decision yet · 1.1 km
    3. 34 Blackwood Place, Dublin 15 FW26A/0344ENo decision yet · 1.1 km
    4. 45 Hazelbury Green, Castaheany FW26A/0365ENo decision yet · 1.1 km
    5. 57 Blackwood Close, Ongar FW26A/0343ENo decision yet · 1.2 km
    6. 69 Main Street, Ongar Village FW26A/0371ENo decision yet · 1.3 km
    7. 7Dunboyne Tennis Club, Old Kilbride Road 26190Approved with conditions · 922 m
    8. 8Summerseat, Clonee DA/110887Building site that stopped · 590 m
    9. 9Joe Molloy’s Bookmakers . 2460197Approved, no sign building has started · 721 m
    10. 10Clonee House 2460410Approved, no sign building has started · 897 m
    11. 11lands generally bound 2560854Approved, no sign building has started · 1.0 km
    12. 1235 Kribensis Manor, Williamstown Stud RA160186Building site that stopped · 1.2 km
    13. 13Dunboyne 2660481Approved, no sign building has started · 1.7 km
    14. 14Station Road and Old Navan Road 2460709Approved, no sign building has started · 1.8 km
    15. 150.2 ha zoned for homesEmpty land zoned for homes · 768 m
    Figure 5

    The next 30 days

    7 deadlines within 2.0 km; the first closes 14 Oct 2026.

    7 deadlines in the next 30 days: 2026-10-14 FW26A/0344E: application received — Planning Permission for a single storey extension to the rear of existing dwelling all associated site works.; 2026-10-14 FW26A/0343E: application received — Planning permission for a proposed single storey side extension (58.5sq.m) with mezzanine level (18sq.m) consisting of g; 2026-10-22 26190: CONDITIONAL — the development will consist/consists of 2 no. Steel Storage sheds with the following approximate dimensions (i) 6ft wid; 2026-10-29 FW26A/0365E: application received — Planning permission for Attic conversion with Dormer window to rear with Extension / Alterations to new side gable roof,; 2026-10-30 2661199: application received — relocation of existing entrance with associated site works; 2026-11-04 FW26A/0371E: application received — Change of use from 3 no. office units to 6 no. apartments on first & second floors comprising a mix of 1-bed & studios a; 2026-11-06 FW26A/0377E: application received — The development will consist of, to erect a single storey front, side and rear extension with flat roof and roof windowstoday18 Oct23 Oct28 Oct2 Nov7 Nov12 NovFW26A/0344E: application received — Planning Permission for a single storey extension to the rear of existing dwelling all associated site works. · 1.1 km away · 2026-10-14FW26A/0343E: application received — Planning permission for a proposed single storey side extension (58.5sq.m) with mezzanine level (18sq.m) consisting of g · 1.2 km away · 2026-10-1426190: CONDITIONAL — the development will consist/consists of 2 no. Steel Storage sheds with the following approximate dimensions (i) 6ft wid · 922 m away · 2026-10-22FW26A/0365E: application received — Planning permission for Attic conversion with Dormer window to rear with Extension / Alterations to new side gable roof, · 1.1 km away · 2026-10-292661199: application received — relocation of existing entrance with associated site works · 1.1 km away · 2026-10-30FW26A/0371E: application received — Change of use from 3 no. office units to 6 no. apartments on first & second floors comprising a mix of 1-bed & studios a · 1.3 km away · 2026-11-04FW26A/0377E: application received — The development will consist of, to erect a single storey front, side and rear extension with flat roof and roof windows · 880 m away · 2026-11-06
    Comments closeTime to appeal ends
    • Comments close 14 Oct 20261 day left
      3FW26A/0344E · application received — Planning Permission for a single storey extension to the rear of existing dwelling all…
      €20 to the council · 1.1 km away
    • Comments close 14 Oct 20261 day left
      5FW26A/0343E · application received — Planning permission for a proposed single storey side extension (58.5sq.m) with mezzanine level…
      €20 to the council · 1.2 km away
    • Time to appeal ends 22 Oct 20269 days left
      726190 · CONDITIONAL — the development will consist/consists of 2 no. Steel Storage sheds with the following approximate…
      €220 to An Coimisiún Pleanála (€110 observer) · 922 m away
    • Comments close 29 Oct 202616 days left
      4FW26A/0365E · application received — Planning permission for Attic conversion with Dormer window to rear with Extension / Alterations…
      €20 to the council · 1.1 km away
    • Comments close 30 Oct 202617 days left
      22661199 · application received — relocation of existing entrance with associated site works
      €20 to the council · 1.1 km away
    • Comments close 4 Nov 202622 days left
      6FW26A/0371E · application received — Change of use from 3 no. office units to 6 no. apartments on first & second floors comprising a…
      €20 to the council · 1.3 km away
    • Comments close 6 Nov 202624 days left
      1FW26A/0377E · application received — The development will consist of, to erect a single storey front, side and rear extension with…
      €20 to the council · 880 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 6

    Approved, stalled or planned, not built yet

    810 homes 1.8 km away were approved Aug 2025 with no start notice yet; the permission runs to Aug 2035. 3 building sites nearby stopped before sign-off. DART+ West is planned 737 m away.

    Station Road and Old… · 810 homes: 810 homes approved Aug 2025, not started; Dunboyne · 314 homes: 314 homes approved Aug 2026, not started; lands generally bound · 211 homes: 211 homes approved Nov 2025, not started; 33 The Green, The Paddocks · 59 homes: 59 homes, started Apr 2021, never signed off; DART+ West, DART+ West:…: railway order granted (July 2024)2021202220232024202520262027202820292030203120322033203420352036Station Road and Old… · 810 homes1.8 km · 2460709810 homes approved Aug 2025, not started810 homes approved Aug 2025, not startedDunboyne · 314 homes1.7 km · 2660481314 homes approved Aug 2026, not started314 homes approved Aug 2026, not startedlands generally bound · 211 homes1.0 km · 2560854211 homes approved Nov 2025, not started211 homes approved Nov 2025, not started33 The Green, The Paddocks · 59 homes1.9 km · FW18A/016259 homes, started Apr 2021, never signed off59 homes, started Apr 2021, never signed offDART+ West, DART+ West:…737 m · plannedrailway order granted (July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 18 within 2.0 km

    Building site that stopped 3

    • 8Summerseat, Clonee · 30 homes, started Jan 2016, never signed off · 590 m
    • 1235 Kribensis Manor, Williamstown Stud · 10 homes, started Jun 2017, never signed off · 1.2 km
    • 33 The Green, The Paddocks · 59 homes, started Apr 2021, never signed off · 1.9 km

    Approved, not started 5

    Empty land zoned for homes 10

    • 150.2 ha zoned for homes · no homes built on it yet · 768 m
    • 0.1 ha zoned for homes · no homes built on it yet · 788 m
    • 0.9 ha zoned for homes · no homes built on it yet · 1.2 km
    • 0.4 ha zoned for homes · no homes built on it yet · 1.2 km
    • 1.0 ha zoned for homes · no homes built on it yet · 1.3 km
    • 0.5 ha zoned for homes · no homes built on it yet · 1.3 km
    • 1.4 ha zoned for homes · no homes built on it yet · 1.4 km
    • 0.5 ha zoned for homes · no homes built on it yet · 1.4 km
    • 0.5 ha zoned for homes · no homes built on it yet · 1.4 km
    • 0.5 ha zoned for homes · no homes built on it yet · 1.5 km

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    derelictCC-BY-4.012 Oct 2026, 23:08open
    npadCC-BY-4.013 Oct 2026, 01:45open

    Open for comments €20 to comment

    Every application within 2.0 km 74 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    Building work nearby 24 in the last 12 months
    3 signed off as finished7 not signed off14 no sign-off needed
    • Castle Farm Court, Dunboyne, Meath · 16 Sept 2026 · 8 homes · start notice not signed off · 2460468 · 1.2 km
    • Unit 1, Supervalu, Station Road, Dublin · 7 Sept 2026 · start notice not signed off · FW26A/0155E · 1.9 km
    • 8 Silver Birches, Dunboyne, Meath, A86 VC04 · 14 Aug 2026 · 1 homes · short notice no sign-off needed · 25/61340 · 2.0 km
    • 58 Chestnut Grove, Dunboyne, Meath, A86 A439 · 7 Aug 2026 · 1 homes · start notice not signed off · 25/61072 · 1.5 km
    • 86 Latchford Park, Dublin 15, Dublin, D15 FH51 · 22 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · FW25A/0560E · 1.7 km
    • 3 Rosedale Crescent, Dublin 15, Dublin, D15 A8R5 · 13 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · FW24A/0408 · 1.3 km
    • 2 Beechfield Close, Dublin 15, Dublin, D15 FXP9 · 25 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · FW26A/0066E · 820 m
    • 37 Littlepace Way, Dublin 15, Dublin, D15 E6EX · 22 Jun 2026 · short notice no sign-off needed · FW26A/0032E · 1.5 km
    • Castle Farm Court, Dunboyne, Meath · 15 Jun 2026 · 26 homes · start notice not signed off · ABP-321999-25 & 2460468 · 1.3 km
    • 8 Kribensis Manor, Clonee, Meath, D15 XE8R · 12 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2560767 · 944 m
    • 245 Littlepace Court, Clonee, Fingal, D15 H9P9 · 8 May 2026 · 1 homes · start notice, opted out no sign-off needed · FW25A/0483E · 1.2 km
    • Liitlepace Rd, Dublin, Fingal, D15 TA49 · 2 Apr 2026 · start notice not signed off · FW23A/0309 · 1.8 km
    • 117 Hazelbury Park, Dublin, D15 WA40 · 19 Mar 2026 · short notice no sign-off needed · FW22B/0090 · 1.3 km
    • 171 Littlepace Walk, Fingal, D15 E9H6 · 10 Mar 2026 · short notice no sign-off needed · FW25A/0466E · 1.2 km
    • 1 Linnetfields Rise, Dublin 15, Fingal, D15 K2C4 · 27 Feb 2026 · 1 homes · short notice no sign-off needed · FW25A/0460E · 1.1 km
    • Rooske Gardens, Dunboyne, Meath · 11 Feb 2026 · 55 homes · 7-day notice not signed off · 23580 · 1.9 km
    • Rooske Gardens, Dunboyne, Meath · 11 Feb 2026 · 55 homes · 7-day notice not signed off · 23580 / 2561086 · 2.0 km
    • 32 Ravenswood Rise, CLONEE, Fingal, D15 K2V6 · 9 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · FW21A/0121 · 1.9 km
    • 10 The Gallops, Williamstown Stud, Clonee, Meath · 2 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 2560922 · 632 m
    • 38 The Green, The Paddocks, Dublin, Fingal, D15 F96E · 7 Jan 2026 · short notice no sign-off needed · FW24A/0504E · 1.9 km
    • 244 Littlepace Court, Clonee, Fingal, D15 A6P5 · 29 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · FW25A/0345E · 1.2 km
    • 15 Luttrells Lane Hansfield Square, Hansfield, Fingal, D15 DHF6 · 5 Dec 2025 · 7-day notice signed off · 1.8 km
    • 1 Latchford Walk, Dublin, Fingal · 27 Nov 2025 · 2 homes · start notice signed off · FW25A/0099E · 1.5 km
    • Supervalu, Station Road, Hansfield, Fingal, - · 28 Oct 2025 · 7-day notice signed off · FW25A/0275E · 1.9 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 13 Oct 2026, 00:21
    SourceLicenceFetchedLink
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    Homes coming 1,408 not started
    • Hansfield Station Quarter, Hansfield, Dublin 15 (Phase 1) · Completed · 23 homes · 1.4 km
    • Hansfield Station Quarter, Hansfield, Dublin 15 (Phase 2) · Completed · 38 homes · 1.4 km
    • Hansfield Station Quarter, Hansfield, Dublin 15 (Phase 3) · Completed · 38 homes · 1.4 km
    • Hansfield Station Quarter, Hansfield, Dublin 15 (Phase 4) · Completed · 34 homes · 1.4 km
    • Hansfield View, 7 Hansfield Square, Hansfield, Dublin 15. (formerly Station View, Station Road, Dublin 15) (Phase 1)* · Completed · 22 homes · 1.4 km
    • Park Lodge, Hansfield, Dublin 15. (Phase 1)* · Stage 4 tender approval · 95 homes · 1.4 km
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Who applies most nearby

    • Cuisle Properties Ltd — 2 applications, latest 30 Sept 2026
    • Cedarglade Limited — 2 applications, latest 20 Apr 2026
    • Hansfield Investments Ltd — 2 applications, latest 6 Feb 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Explorers Crèche Ltd · Crèche20 Jan 2026 · report · Tusla Early Years Inspectorate620 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: organisations, schools, tusla_ey · fetched 11 Oct 2026, 23:05
    SourceLicenceFetchedLink
    organisationsn/a — derived; organisations only; DLR-sourced links withheld11 Oct 2026, 23:05—
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area About as busy as most of Meath County Council.
    Homes approved
    Here73
    Council middle0
    Homes started
    Here10
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 5

    What's the area like?

    Figure 7

    This street block against the council

    41% of homes built before 1971 (council 18%). 76% owner-occupied (council 75%).

    Homes built before 1971
    41% · council 18%
    Homes built since 2001
    25% · council 45%
    Owner-occupied
    76% · council 75%
    Rented
    18% · council 20%
    Children under 15
    21% · council 23%
    Aged 65 and over
    23% · council 12%
    Households with 2+ cars
    70% · council 54%
    Work mainly from home
    17% · council 11%
    This small area (292 people)Meath

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 167029005/01

    Aircraft noise
    45–49 dB
    day–night average (EPA 2022) · airport noise zone D
    Bus
    793 m
    Clonee Village · 105, 109, 109B
    Planned
    737 m
    DART+ West, DART+ West: Clonsilla - M3 Parkway
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    1.3 km
    Scoil Ghrainne Community National School, 585 pupils
    Homes sold nearby
    371
    in 3 years, 81 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil Ghrainne Community National School · primary · 585 pupils · 1.3 km
    • Coláiste Pobail Setanta · postprimary · 1079 pupils · 1.3 km
    • Castaheany Educate Together NS · primary · 362 pupils · 1.4 km
    • St Benedicts National School · primary · 622 pupils · 1.5 km
    • Hansfield Educate Together National School · primary · 575 pupils · 1.6 km
    • Hansfield ETSS · postprimary · 867 pupils · 1.7 km
    • Mary Mother of Hope Senior NS · primary · 429 pupils · 1.7 km
    • Mary Mother of Hope Junior National School · primary · 349 pupils · 1.8 km

    Stops 40

    • Clonee Village · 105, 109, 109B, 270, 70, 70D · 5/hour at peak · 793 m

    Public land

    • Fingal County Council · 0.24 ha · 1.0 km
    • Fingal County Council · 0.35 ha · 1.1 km
    • Fingal County Council · 0.18 ha · 1.2 km
    • Fingal County Council · 0.13 ha · 1.2 km
    • Meath County Council · 0.42 ha · 1.3 km
    • Meath County Council · 0.02 ha · 1.3 km
    Sources: gtfs, schools, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
    SourceLicenceFetchedLink
    gtfsCC-BY-4.011 Oct 2026, 23:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    consultpublic13 Oct 2026, 01:29open
    moderngovpublic13 Oct 2026, 01:29open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    2. Zoned P5 (rural and agricultural), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    3. Application 880 m away open for comments until 6 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Clonee
    Electoral division
    Dunboyne
    Electoral area
    Ratoath
    Council
    Meath County Council
    Everything we found, as a list 8 lines
    • Zoned P5 (rural and agricultural); not protected; no vacant land tax; flood risk area within 100 m.
    • 18 sites nearby could change: 3 stalled builds, 5 approved schemes, 10 empty zoned plots.
    • 6 applications open for comments nearby; nearest closes 6 Nov 2026.
    • 1,408 homes approved nearby, not started; largest 810 at Station Road and Old Navan Road.
    • No morning-peak service within 500 m; nearest is Clonee Village, 793 m away (5 an hour). Planned: DART+ West 737 m away, railway order granted (July 2024).
    • Noise from aircraft mapped at 45–49 dB (day-evening-night average, EPA 2022); inside Dublin Airport Noise Zone D.
    • Here (2022 census): 76% owner-occupied (council 75%); 6% of homes empty (council 6%); most built 1971–1980; 73% drive to work (council 64%); population up 6% since 2016.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 34
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.012 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
    gsi.geodata.gov.ieGeological Survey Irelandpublic (Geological Survey Ireland)27 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC-BY-4.0 (Fingal); public/attribution…27 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public13 Oct 2026
    www2.courts.ie—all-rights-reserved13 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public13 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.013 Oct 2026
    organisationsPlanning Register (derived from applications and the CRO register)n/a — derived; organisations only; DLR…11 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…13 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 13 Oct 2026, 13:59 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.