Development Area 8, Adamstown
227 homes4 storeysQuintain Developments Ireland Ltd.Lucan, South Dublin County Council
Approved Feb 2022; first homes signed off Sep 2023.
Also known as Adderig.
- 3 Jun 2021Received
- 21 Feb 2022Approved
- 6 Jul 2022Building started
- 11 Sept 2023Signed off
- Status
- Building started
- Decision
- Approved · 21 Feb 2022
- Size
- 227 homes · up to 4 storeys
- Uses
- residential, houses, apartments
- Applicant
- Quintain Developments Ireland Ltd.
- Site
- 5.01 ha
Is it built?
- 2022Approved
- 2022Building started
- 2023First homes signed off3 sign-offs
The scheme
Quintain Developments Ireland Ltd. proposes the construction of 227 dwellings at Development Area 8, Adderig, Adamstown. The scheme includes a mix of terraced houses and duplex apartments across buildings ranging from two to four storeys in height. The development also provides for associated site works, including roads, public open space, and parking.
it involves the construction of 227 dwellings
What the register says
Development of 227 dwellings (24,513.8sq.m gross floor area); 95 3-bed, 2 storey terraced houses and associated gardens; 28 4-bed, 3 storey terraced houses and associated gardens; 48 3-bed, 2 storey duplex apartments over 48 2-bed apartments (3 storey buildings with 2 storey duplex over single level ground floor unit) and associated communal and private open space; 4 3-bed, 2 storey duplex apartments over 4 3- bed, 2 storey duplex apartments (4 storey buildings with 2 storey duplex over 2 storey duplex) and associated communal and private open space; all associated site and development works including roads, central public open space (0.12ha), car parking (361 spaces), bicycle parking (168 spaces), bin storage areas, 2 ESB substations (22sq.m), associated pedestrian footpaths and cycle paths, hard and soft landscaping and boundary treatment. A section of the East - West Avenue Road (referred to as Airlie Park Road) along the northern boundary of the site is included in the current application and 2 access points are proposed to this road; development is accessed from roads already approved or under construction. The road to the south (referred to as Adamstown Way) was permitted under SDZ06A/0005 and bounds the site to the south and 1 access point is proposed to this road. 4 access points are proposed to the east and west (2 each). The Celbridge Link Road permitted under SDZ17A/0009 bounds the site to the west and the north-south road to the eastern boundary (referred to as Linear Park Road) was permitted under SDZ20A/0017. 17 spaces were permitted under SDZ17A/0009 providing a total of 378 spaces for this development
Summary from the register record.
The site 5.01 ha
Boundary of Development Area 8, Adamstown from the planning application.
Planning applications inside the site 8 applications in the last 10 years
- Granted8, Aderrig Heights, Adamstown, Lucan, Co. Dublin, K78 V0T9
- Refused8, Arderrig Heights, Adamstown, Lucan, K78 V0T9
- GrantedAderrig, Adamstown, Lucan, Co. Dublin
- Granted7, Aderrig Place, Adamstown, Lucan, Co. Dublin, K78 C9C4
- CommencedAdamstown, Co Dublin
- CommencedIn the townland of Aderrig, Adamstown, Lucan, Co. Dublin
- CommencedIn the townlands of Aderrig, Gollierstown and Finnstown, Adamstown, Lucan, Co. Dublin
- CommencedDevelopment Area 8, Adderig, Adamstown, Lucan, Co. Dublin
Appeals inside the site 1 with An Coimisiún Pleanála
Other big developments nearby within 2 km
- Aderrig Place · 60 m away
- Aderrig · 78 m away
- Aderrig Development Area · 207 homes · 4 storeys · 89 m away
- Adamstown Tubber Lane · 455 homes · 4 storeys · 166 m away
- Tubber Lane, Adamstown · 455 homes · 4 storeys · 166 m away
- Adamstown Boulevard Development Area Phase 1 · 423 homes · 9 storeys · 172 m away
- Arderrig Terrace · 182 m away
- Tubber Lane Residential Development · 453 homes · 201 m away