PlanningRegister.ie
Dublin City Council · WEB2463/26

93 Rialto Cottages, Rialto, Dublin 8, D08 HXC2

Approved. Building started.

  1. 12 Jun 2026Received
  2. 17 Jul 2026Observations closed
  3. 7 Aug 2026Decision due
  4. 29 Sept 2026Building started
Status
Building started
Decision
Due 7 Aug 2026
Council
Dublin City Council
Type
Permission
Site
60 m²

What’s proposed

In plain English

Rear extension and attic conversion at 93 Rialto Cottages

The applicant wants to replace the existing rear extension and convert the attic into a living space. This includes building a new dormer window at the back.

  • Removes the existing single-storey rear extension
  • Attic conversion includes a new rear dormer window
  • Lowers the ground floor level
  • Maintains the existing size of the private courtyard
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

The development will consist of: (i) the removal of an existing single-storey rear extension and construction of a new single-storey rear extension maintaining existing size of private open-space/courtyard with modified layout; (ii) attic conversion to habitable room with rear dormer roof constructed below existing ridge line and reduction in ground floor level; (iii) renovation and alterations to the existing building including all associated ancillary site works

Planning details

Reference
WEB2463/26
Local authority
Dublin City Council
Status
Commenced · register status “Registered Application”
Received
12 Jun 2026
Observations close
17 Jul 2026 (closed 105 days ago)
Decision due
7 Aug 2026
Decision
Not decided
Site area
60 m² from the mapped boundary, not the council's figure

Live near 93 Rialto Cottages?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 24 · 500 m · 12 months

Distance
Time
Show all 24

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 29 Sept 2026 · Builder told the council small works were starting CN0148024DC

Zoning

Zone Z2 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 5
    Rialto Bridge; Rialto Parish Centre

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

WEB2463/26 is a planning application to Dublin City Council for the development will consist of: (i) the removal of an existing single-storey rear, received on 12 Jun 2026; a decision is due by 7 Aug 2026.