Hammond Lane, Smithfield, Dublin 7

  1. 23 Sept 2020Received
  2. 17 Nov 2020Grant permission and rete
  3. 6 Jan 2021Final grant
Status
Granted
Decision
Grant permission and rete · 17 Nov 2020
Council
Dublin City Council
Type
Permission
Site
4,471 m²

What’s proposed

PERMISSION & RETENTION: Permission and retention permission is sought for a period of 3 years for a temporary construction compound associated with the implementation of the planning permission granted under DCC Register Reference 2024/16 (ABP Ref. PL29N.246933), as amended, on a site of 4,456 sq.m and bounded by Hammond Lane, Church Street, Lincoln Lane and the Luas Red Line, Dublin 7. The development consists of the retention of stacked welfare and office cabins on the northern part of the site ranging in height from 5.09m to 8.08m, and stacked office and staff storage cabins located on the southern part of the site ranging in height from 2.57m to 5.29m; 1 no. security hut and 1 no. turnstile hut; (total floor area of 1489.7 sq.m); 4 no. fully sealed septic tanks; 4 no. hardcore parking areas accommodating 12 no. vehicles to the north of the site, 6 no. spaces in the centre of the site, and 22 no. spaces provided over 2 no. locations to the south of the site; 1 no. vehicular access to Hammond Lane; 1 no. pedestrian entrance to Lincoln Lane; 1 no. facade sample display area; and, all associated development and works. Permission is sought for development that will consist of: Stacked welfare and office cabins located to the centre of the site (height 5.17m) and ; office cabins located to the south east of the site ranging in height from 2.65m to 5.19m (total cabin space floor area of 172 sq.m)

3438/20 is a planning application to Dublin City Council for pERMISSION & RETENTION: Permission and retention permission is sought for a period of 3, received on 23 Sept 2020; permission was granted on 17 Nov 2020.

Planning details

Reference
3438/20
Local authority
Dublin City Council
Status
Granted · register status “Decision Notice Issued”
Received
23 Sept 2020
Observations close
28 Oct 2020 (closed 2159 days ago)
Decision due
17 Nov 2020 · decided 17 Nov 2020
Decision
Grant permission and rete on 17 Nov 2020
Proposed development
PERMISSION & RETENTION: Permission and retention permission is sought for a period of 3 years for a temporary construction compound associated with the implementation of the planning permission granted under DCC Register Reference 2024/16 (ABP Ref. PL29N.246933), as amended, on a site of 4,456 sq.m and bounded by Hammond Lane, Church Street, Lincoln Lane and the Luas Red Line, Dublin 7. The development consists of the retention of stacked welfare and office cabins on the northern part of the site ranging in height from 5.09m to 8.08m, and stacked office and staff storage cabins located on the southern part of the site ranging in height from 2.57m to 5.29m; 1 no. security hut and 1 no. turnstile hut; (total floor area of 1489.7 sq.m); 4 no. fully sealed septic tanks; 4 no. hardcore parking areas accommodating 12 no. vehicles to the north of the site, 6 no. spaces in the centre of the site, and 22 no. spaces provided over 2 no. locations to the south of the site; 1 no. vehicular access to Hammond Lane; 1 no. pedestrian entrance to Lincoln Lane; 1 no. facade sample display area; and, all associated development and works. Permission is sought for development that will consist of: Stacked welfare and office cabins located to the centre of the site (height 5.17m) and ; office cabins located to the south east of the site ranging in height from 2.65m to 5.19m (total cabin space floor area of 172 sq.m)
As published by the register.
Site area
4,471 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 225 applications within 500 m in the last 5 years

Show all 225

Explore this area on the map →

Homes nearby

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z5 - DEV PLAN 2022-2028

    M2 — Major town centre

    Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

    The main town centre — retail, offices, civic uses, apartments.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • NIAH-recorded building · 82
      quay/wharf; quay/wharf; Kearns
    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 61
      Mural tower (Historic Town); Mural tower (Historic Town); Gateway

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 87432). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open