Dublin City Council · 4033/22

67 Baggot Street Lower, Dublin 2

Approved in Aug 2022. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 20 May 2022Received
  2. 14 Jul 2022Approved
  3. 29 Aug 2022Final approval
  4. 29 Aug 2027Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Approved · 14 Jul 2022
Reference
4033/22
Received
20 May 2022
Site
275 m²

What’s proposed

PROTECTED STRUCTURE: The development will include internal and external refurbishment, repairs and minor alterations to the existing three storey over basement building with rear return fronting Baggot Street Lower, to consist of the following: External works: Repointing works to front elevation;

Show all

Repair works to roof to include the removal and safe disposal of asbestos roof tiles, ridge and hip tiles and replacement with Blue Bangor slates, upgrade of existing linings and flashings to copper, local repairs and removal of vegetation to rear chimney stack; Replacement of non-original sash windows to front and rear elevations with new sash windows on a like for like basis with six-over-six and three-over-three window pane configurations; Removal of non-original front railings and provision of new wrought iron railings to match No.68; Provision of new external cast iron stairs from street level leading to sunken court and associated modification to front granite plinth; Removal of cement render to front entrance steps to expose original granite steps and repairs and repointing as required; Provision of new window to front entrance lobby at basement level; Provision of new external steel stairs to rear return including the removal of an existing ground floor window and modification of the ope to provide a door; Rationalisation of rain water and waste pipes to rear facade and replacing PVC fittings with cast iron fittings; Landscaping works to rear including removal of existing modern timber fencing. Internal works: Basement level: Removal of non-original concrete slab and replacement with new insulated concrete slab with DPM; Removal of lightweight modern partition to front room; Damp proofing of extenal walls where necessary including coal store; Removal of metering cupboard to corridor and relocation to coal store area. Upper floors: Minor modifications to internal walls and openings including removal of modern partitions and doors; Upgrade of existing bathroom facilities utilising existing service routes only; Strip out of redundant services without disturbing the existing building fabric. Repair and renewal of existing under floor drainage system and Basement level; Provision of new timber floor joists to supplement existing joists where required. All ancillary works necessary to facilitate the development. The development does not result in any change to the floor area or footprint of the building

45 other applications within 500 m in the last year · 1 open for comments

Open the report

Nearby 45 · 500 m · 12 months

Distance
Time
Show all 45

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z8 - DEV PLAN 2022-2028

O2 — Green belt

Zoned to protect the open land between urban areas. Development is strongly resisted.

Protections nearby 250 m

  • Natural Heritage Area (incl. proposed) · 1
    Grand Canal
  • NIAH-recorded building · 127
    house; building misc
  • Recorded monument · 1
    R149515
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

4033/22 is a planning application to Dublin City Council for PROTECTED STRUCTURE: The development will include internal and external refurbishment, received on 20 May 2022; permission was granted on 14 Jul 2022.