PlanningRegister.ie
Dublin City Council · DSDZ2529/21

30-32 Sir John Rogerson's Quay, Dublin 2

Approved in Jul 2021. Building started in 2024, signed off as finished in Sep 2024.

  1. 1 Apr 2021Received
  2. 27 Jul 2021Approved
  3. 29 Jan 2024Building started
  4. 4 Sept 2024Signed off

Planning details

Status
Building started
Decision
Approved · 27 Jul 2021
Reference
DSDZ2529/21
Received
1 Apr 2021
Further information
Requested 26 May 2021 · received 30 Jun 2021
Site
3,365 m²

What’s proposed

PROTECTED STRUCTURE: Permission for development at Nos. 30-32, Sir John Rogerson's Quay, Dublin 2, including a Protected Structure (the former Tropical Fruit Co. Warehouse, RPS Reference No. 7548) and lands bounded by Whittaker Square to its rear (south) and by existing developments to east and west. The application relates to development within the North Lotts and Grand Canal Dock Strategic Development Zone.

Show all

The proposed development involves amendments to previous permission (Reg. Ref's. DSDZ3803/19, DSDZ4446/18, DSDZ2584/18 and DSDZ2533/18); including the following elements: -Relocation of the entrance gates from the Sir John Rogerson's Quay boundary (further into the site), -erection of a canopy above the main entrance to the new building element, -a signage plaque beside the entrance gate on the eastern facade of the Tropical Fruit Co. Warehouse (Protected Structure) and up-lighting on the front (north) facade of the Tropical Fruit Co. Warehouse; -metal rainscreen cladding and a security gate incorporated into permitted south office facade (facing Whittaker Square), -an amended landscape design, -revised pedestrian ramp and stepped transition to Whittaker Square, -a roof terrace with stepped seating area and glass handrail (at roof level of the permitted projection over the Tropical Fruit Co. Warehouse); -and security railings to the western site perimeter. The development also involves modifications to the extent of the ribbon rooflights to the Tropical Fruit Co. Warehouse, 2 new external security gates on the Eastern end of the permitted office building at ground level, removal of a modern 'bullseye' window at the Tropical Fruit Co. Warehouse, and an increase in cafe mezzanine size (to provide c. 30m2 of additional floor space). The application includes all associated and ancillary development and site works above and below ground

23 other applications within 500 m in the last year · 1 open for comments

Get the full report

Nearby 23 · 500 m · 12 months

Distance
Time
Show all 23

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 29 Jan 2024 · Builder told the council work was starting (seven-day notice) SN0009639DC

Zoning

Docklands SDZ (ZD02)

R3 — Rural cluster

A small rural settlement where only modest infill serving local need is envisaged.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 2
    Sir John Rogersons Quay Gasworks; Site contained by the street frontages
  • Natural Heritage Area (incl. proposed) · 1
    Royal Canal
  • NIAH-recorded building · 13
    bridge; quay/wharf
  • Recorded monument · 3
    Quay; R184154
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

DSDZ2529/21 is a planning application to Dublin City Council for PROTECTED STRUCTURE: Permission for development at Nos. 30-32, Sir John Rogerson's Quay, received on 1 Apr 2021; permission was granted on 27 Jul 2021.